參 考 文 獻
[1]台彎電力司網站:http://www.taipower.com.tw.
[2]馬大康,在電力自由化環境下電力買賣及電力系統調度之重要課題研究,國科會計畫成果報告,NSC86-2213-E-110-039-T,1997。
[3]蔡耀德,以混合型線性整數規劃為基礎之火力機組發電排程預定,國立中正大學電機研究所碩士論文,九十一年六月。[4]張文恭和莊景勝,“線性整數規劃與拉氏鬆弛法求解火力機組發電排程預定之分析比較,”第二十六屆電力研討會, 2005,pp.1558-1562, 12/9-10。
[5]賴慶育,混合型線性整數規劃應用於火力機組發電排程預定之研究,國立中正大學電機研究所碩士論文,九十二年六月。[6]P. Attaviriyanupap, H.K. Eiichi, and Hasegawa, “A hybrid LP-EP for solving new Profit-Based UC problem under competitive environment,” IEEE Trans. on Power Systems, Feb. 2003, Vol.18, No.1, pp.229-237.
[7]Tao Li and M. Shahidehpour, “Priced-Based unit commitment: A case of Lagrangian Relaxation versus mixed integer programming,” IEEE Trans. on Power Systems, Nov. 2005, Vol.20, No.4, pp.2015-2025.
[8]M. Madrigal and V.H. Quintana, “Existence and determination of competitive equilibrium in unit commitment power pool auctions: price setting and scheduling alternatives,” IEEE Trans. on Power Systems, Aug. 2001, Vol.16, No.3, pp.380-388.
[9]C.W. Richter and G.B. Sheble, “A Profit-Based unit commitment GA for the competitive environment,” IEEE Trans. on Power Systems, May 2000, Vol. 15, No.2, pp.715-721.
[10]G. Li, C.C. Liu, C. Mattson and J. Lawarree, “Day-Ahead electricity price forecasting in a grid environment,” IEEE Trans. on Power Systems, Feb 2007, Vol. 22, No. 1, pp.266-274.
[11]A. J. Conejo, J. Contreras, R. Espínola, and M. A Plazas, “Forecasting electricity prices for a day-ahead pool-based electric energy market,” Int. J. Forecast, 2005, Vol. 3, No. 21, pp.435-462.
[12]J.S. Chun, H.K. Jung, S.Y. Hahn, “A study on comparison of optimization performances between immune algorithm and other heuristic algorithms,” IEEE Trans. on Magnetic, 1998, Vol. 34, No. 5, pp.2972-2975.
[13]S.J. Huang, “An immune-based optimization method to capacitor placement in a radial distribution system,” IEEE Trans. on Power Delivery, 2000, Vol. 15, No. 2, pp.744-7499.
[14]Phillip J. Ross, Taguchi Techniques for Quality Engineering, Section Edition, The McGraw-Hill Companies, Inc., 1988, pp.203-243.
[15]李輝煌,田口方法-品質設計的原理與實務,高立圖書有限公司,2000。
[16]D. Liu and Y. Cai, “Taguchi method for solving the economic dispatch problem with nonsmooth cost functions,” IEEE Trans. on Power Systems, Nov. 2005, Vol.20, No.4, pp.2006-2014.
[17]A. Roark, P. Skantze, and R. Masiello, “Exploring Risk-Based approaches for ISO/RTO asset managers,” Proceedings of IEEE, Nov. 2005, Vol. 93, No. 1, pp. 2036-2048.
[18]R. Dahkgren, C.C. Liu, and J. Lawarree, “Risk assessment in energy trading,” IEEE Trans. on Power Systems, May 2003, Vol. 18, No. 2, pp.503-511.
[19]M. Denton, A. Palmer, R. Masiello, and P.Skantze, “Managing market risk in energy,” IEEE Trans. on Power Systems, May 2003, Vol. 18, No. 2, pp. 494-502.
[20]L.F. Escudero, J.L. de la Fuente, C. García, and F.J. Prieto, “Hydropower generation management under uncertainty via scenario analysis and parallel computation,” IEEE Trans. Power Systems, May 1996, Vol. 11, pp.683–689.
[21]M.P. Nowak and W. Römisch, “Lagrangian relaxation applied to power scheduling in a hydro-thermal system under uncertainty,” Oper. Res., 2000, Vol. 100, pp.251-272.
[22]S. Takriti, B. Krasenbrink, and L. S.-Y. Wu, “Incorporating fuel constraints and electricity spot prices into the stochastic unit commitment problem,” Oper. Res., 2000, Vol. 48, pp.268-280.
[23]S.E. Fleten, S.W. Wallace, and W.T. Ziemba, “Hedging electricity portfolios via stochastic programming,” in Decision-Making under uncertainty: Energy and Power, A. Ryszczynski and C. Greengard, Eds. New York: Springer-Verlag, 2002.
[24]N. Growe-Kuska, K.C. Kiwiel, M.P. Nowak, W. Römisch, and I. Wegner, “Power management in a hydro-thermal system under uncertainty by Lagrangian relaxation,” in Decision-Making Under Uncertainty: Energy and Power, A. Ryszczynski and C. Greengard, Eds. New York: Springer-Verlag, 2002.
[25]A.J. Conejo and F.J. Prieto, “Mathematical programming and electricity markets,” TOP (Sociedad de Estadística e Investigación Operativa), 2001, Vol. 9, pp.1-54.
[26]M. Denton, A. Palmer, R. Masiello, and P. Skantze, “Managing market risk in energy,” IEEE Trans. Power Systems, May 2003, Vol. 18, pp.494-502.
[27]R. Dahlgren, C.C. Liu, and J. Lawarreé, “Risk assessment in energy trading,” IEEE Trans. Power Systems, May 2003, Vol. 18, pp.503-511.
[28]M. Ni, J.D. McCalley, V. Vittal, and T. Tayyib, “Online risk-based security assessment,” IEEE Trans. Power Systems, Feb. 2003, Vol. 18, pp. 258-265.
[29]R.W. Dahlgren, C.C. Liu, and J. Lawarreé, “Volatility in the California power market: Source, methodology and recommendations,” IEE Proc. Gener. Transm. and Distrib. , Mar. 2001, Vol. 148, pp.189-193.
[30]A.P. Douglas, A.M. Breipohl, F.M. Lee, and R. Adapa, “Risk due to load forecast uncertainty in short term power system planning,” IEEE Trans. On Power Systems, Nov. 1998, Vol. 13, pp.1493-1499.
[31]J.C. Cuaresma, J. Hlouskova, S. Kossmeier, and M. Obersteimer, “Forecasting electricity spot-prices using linear univariate time-series models,” Appl. Ener., 2004, Vol. 77, pp.87-106.
[32]A.T. Lora, J.M.R. Santos, A.G. Expósito, J.L.M. Ramos, and J.C.R. Santos, Electricity market price forecasting based on weighted nearest neighbors techniques, IEEE Trans. on Power Systems, Aug. 2007, Vol. 22, No. 3, pp. 1294-1301.
[33]J. Contreras, F.J. Nogales, and A.J. Conejo, “ARIMA models to predict next-day electricity prices,” IEEE Trans. on Power Systems, Aug. 2003, Vol. 18, No. 3, pp. 1014-1020.
[34]M. Zhou, Z. Yan, Y.X. Ni, G. Li, and Y. Nile, “Electricity price forecasting with confidence-interval estimation through an extended ARIMA approach,” IEE Proc. Gener. Transm. and Distrib., Mar. 2006, Vol. 153, No. 2, pp.187-195.
[35]A.J. Conejo, M.A. Plazas, R. Espínola, and A.B. Molina, “Day-Ahead electricity price forecasting using the wavelet transform and ARIMA models,” IEEE Trans. on Power Systems, May 2005, Vol. 20 , No. 2, pp.1035-1042.
[36]A.K. Diongue, D. Guegan, and B. Vignal, “Forecasting electricity spot market prices with a k-factor process,” Appl. Ener., 2009, Vol. 86, pp.505-510.
[37]P. Kosater and K. Mosler, “Can Markov regime-switching models improve power-price forecasts? evidence from German daily power prices,” Appl. Ener., 2006, Vol. 83, pp.943-958.
[38]A.M. González, A.M.S. Roque, and J. García-González, “Modeling and forecasting electricity prices with input/output hidden Markov models,” IEEE Trans. on Power Systems, Feb. 2005, Vol. 20, No. 1, pp.13-24.
[39]P. Mandal, T. Senjyu, N. Urasaki, T. Funabshi, and A.K. Srivastava, “A novel approach to forecast electricity price for PJM using neural network and similar days method,” IEEE Trans. on Power Systems, November 2007, Vol. 22, No. 4, pp.2058-2065.
[40]J.P.S. Catalão, S.J.P.S. Mariano, V.M.F. Mendes, and L.A.F.M. Ferreira, “An artificial neural network approach for short-term electricity prices forecasting,” The 14th international conference on intelligent system applications to power systems, ISPA, Kaohsiung, Taiwan, Nov. 2007, pp.430-435.
[41]L. Zhang, P.B. Luh, and K. Kasiviswanathan, “Energy clearing price prediction and confidence interval estimation with cascaded neural networks,” IEEE Trans. on Power Systems, Feb. 2003, Vol. 18, No. 1, pp.99-105.
[42]J.P.S. Catalão, S.J.P.S. Mariano, V.M.F. Mendes, and L.A.F.M. Ferreira, “Short-term electricity prices forecasting in a competitive market: a neural network approach,” Electr. Power Syst. Res., 2007, Vol. 77, pp.1297-1304.
[43]H.T. Pao, “Forecasting electricity market pricing using artificial neural networks,” Energ. Convers. Manage., 2007, Vol. 48, pp.907-912.
[44]R. Pino, J. Parreno, A. Gomez, and P. Priore, “Forecasting next-day price of Electricity in the Spanish Energy market Using Artificial Neural Networks,” Engineering Applications of Artificial Intelligence, 2008, Vol.21, pp.53-62.
[45]C.H. Lin and M.C. Tsao, “Power quality detection with classification Enhancible Wavelet-Probabilistic network in a power system,” IEE Proc. Gener. Transm and Distrib., Nov. 2005, Vol. 152, No. 6, pp.969-976.
[46]F.M. Ham and I. Kostanic, Principal of Neurocomputing for Science and Engineering, McGraw-Hill Companies, Inc., 2001.
[47]X. Ma, D.I. Sun, and K.W. Cheung, “Evolution toward standardized market design,” IEEE Trans. on Power Systems, May 2003, Vol.18, No. 2, PP460-469.
[48]M. Shahidehpour, H. Yamin, and Z. Li, Market Operations in Electric Power Systems, John Wiley & Sons, Inc., 2002.
[49]E. Erdogdu, “A paper on the unsettled question of Turkish electricity market: Balancing and settlement system (part I),” Appl. Ener., 2010, Vol. 87, pp. 251-258.
[50]C.W. Richter and G.B. Shedble, “A Profit-Based unit commitment GA for the competitive environment,” IEEE Trans. on Power Systems, Nov. 2005, Vol. 20, No. 4, pp.2015-2025.
[51]J. Solanki, S. Khushalani, and A. Srivastava, “A genetic algorithm approach to Price-Based unit commitment,” Power Symposium, 2006. NAPS 2006. 38th North American, Publication Year: 2006, Page(s): 425 – 429.
[52]P. Attaviriyanupap, H. Kita, E. Tanaka, and J. Hasegawa, “A hybrid LR-EP for solving new Profit-Based UC problem under competitive environment,” IEEE Trans. on Power Systems, Feb. 2003, Vol. 18, No. 1, pp.229-236.
[53]H.Y. Yamin, Q. El-Dwairi, and S.M. Shahidehpour, “A new approach for GenCos profit based unit commitment in Day-Ahead competitive electricity markets considering reserve uncertainty,” The International of Journal Electrical Power and Energy Systems, 2007, 29, pp.609-616.
[54]M.D. Phadke, Quality Engineering Using Robust Design, Englewood Cliffs, NJ: Prentice-Hall, 1989.
[55]S.H. Park, Robust Design and Analysis for Quality Engineering, Chapman & Hall, 1996.
[56]C.L. Lin, “Use of the Taguchi method and grey relational analysis to optimize turning operations with multiple performance characteristics,” Materials and Manufacturing Processes, 2004, Vol. 19, No. 2, pp.209-220.
[57]H.C. Liao, “Using N_D method to solve muti-response problem in Taguchi,” Journal of Intelligent Manufacturing, 2005, Vol. 16, No. 3, pp.331-347.
[58]A.K.D. Jayadeva, and S. Chandra, “Algorithm for building a neural network for function approximation,” IEE Proceedings-Circuits, Devices and System, October/December 2002, vol. 149, no. 56, pp.301-307.
[59]C. C. Chan, E. W. C. Lo, and W. X. Shen, “Available capacity computation model based on artificial neural network for Lead-Acid batteries in electric vehicles,” Journal of Power Sources, 1999, Vol. 87, No. 1-2, pp.201-204.
[60]M. Sandford, D. Parish, and I. Phillips, “Neural approach to detecting communication network events,” IEE Proceedings-Communications, October/December 2002, Vol. 149, no. 56, pp.257-264.
[61]B.R. Szkuta, L.A. Sanabria, and T.S. Dillon, “Electricity price short-term forecasting using ANN,” IEEE Trans. on Power Systems, Aug. 1999, Vol. 14, No. 3, pp.851-857.
[62]F. Gao, X. R. Cao, and A. Papalexopoulos, “Forecasting power market clearing price and quantity using a neural network,” IEEE PES Summer Meeting, Vol. 4, pp. 2183-2188, Seatle, WA, 2000.
[63]葉怡成,類神經網路模式應用與實作,儒林圖書有限公司,民國九十七年。
[64]PJM Energy Management:http://www.PJM.com/index.jsp.
[65]M.R. Alrashidi and K.M. EL-Naggar, “Long term electric load forecasting based on particle swarm optimization,” Appl. Ener., 2010, Vol. 87, pp.320-326.
[66]A.J. Wood and B.F., Power generation, operation & control, John Wiley & Sons, Inc. NY, 1984.
[67]L. Sun, Y. Zhang, and C. Jiang, “A matrix Real-Coded genetic algorithm to the unit commitment problem,” Electric Power Systems Research, 2006, Vol. 7, pp.716-728.
[68]T. Senjyu, K. Shimabukro, K. Uezato, and T. Funabashi, “A fast technique for unit commitment problem by extended priority list,” IEEE Trans. on Power Systems, May 2003, Vol. 18, No. 2, pp.882-888.
[69]D.N. Simopoulos, S.D. Kavatza, and C.D. Vournas, “Unit commitment by an enhanced simulated annealing algorithm,” IEEE Trans. on Power Systems, Feb. 2006, Vol. 21, No. 1, pp.68-76.
[70]S.A. Kazarlis, A.G. Bakirtzis, and V. Petridis, “A genetic algorithm solution to the unit commitment problem,” IEEE Trans. on Power Systems, Feb. 1996, Vol. 1, No. 1, pp.83-92.
[71]C.C.A. Rajan and M.R. Mohan, “An evolutionary programming-based tabu search method for solving the unit commitment problem,” IEEE Trans. on Power Systems, Feb. 2004, Vol. 19, No. 1, pp.577-585.
[72]T.A.A. Victoire and A.E. Jeyakimar, “Unit commitment by a tabu search based hybrid-optimizations technique,” IEE Proc. Gener. Transm. and Distrib., Jul. 2005, Vol. 152, No. 4, pp. 563-574.
[73]G.C. Liao, “Application of an immune algorithm to the short term unit commitment problem in power system operation,” IEE Proc. Gener. Transm. and Distrib., May 2006, Vol. 153, No. 3, pp.309-320.
[74]A.Y. Saber, T.S. Senjyu, T.M.N. Urasaki, and T. Funabashi, “Fuzz unit commitment scheduling using absolutely stochastic simulated annealing,” IEEE Trans. on Power Systems, 2006, Vol. 21, No. 2, pp.955-964.
[75]T.O. Ting, M.V.C. Rao, and C.L. Loo, “A novel approach for unit commitment problem via an effective hybrid particle swarm optimization,” IEEE Trans. on Power Systems, 2006, Vol. 21, No. 1, pp.411-418.
[76]T. Senjyu, A.Y., Saber, T. Miyagi, N. Urasaki, and T. Funabashi, “Absolutely stochastic simulated annealing approach to large scale unit commitment problem,” Electr. Power Compon. Syst., 2006, 34(6), pp.619-637.
[77]S.H. Hossesini, A. Khodaei and F. Aminifar, “A novel straightforward unit commitment method for large-scale power systems,” IEEE Trans. on Power Systems, 2007, Vol. 22, No. 4, pp.2134-2143.
[78]T. Senjyu, A.Y. Saber, N. Uraski, and T. Funabashi “Fast technique for unit commitment by absolute stochastic simulated annealing,” Power Engineering Society General Meeting, 2005, IEEE, Vol. 2, pp.1293-1296.
[79]S.N. Yu and N. Chen, “A double-filtration algorithm for optimal scheduling of thermal units,” IEEE Trans. on Power Systems, 2006, Vol. 19, No. 2, pp.1190-1195.
[80]M. Eslamian, S.H. Hoeeeinian and B. Vahidi, “Bacterial foraging-based solution to the unit-commitment problem,” IEEE Trans. on Power Systems, 2009, Vol. 24, No. 3, pp.1478-1488.
[81]T.W. Lau, C.Y. Chung, K.P. Wong, T.S. Chung and S.L. Ho, “Quantum-inspired Evolutionary Algorithm approach for unit commitment,” IEEE Trans. on Power Systems, 2009, Vol. 24, No. 3, pp.1503-1512.
[82]C. Rajan, M. Mohan, K. Manivannan, “Neural-based tabu search method for solving unit commitment problem,” IEE Proc. Gener. Transm. and Distrib., Jul. 2003, pp.469-474.
[83]H. R. Mashhadi, H. M. Shanechi and C. Lucas, “A new genetic algorithm with Lamarckian Individual Learning for generation scheduling,” IEEE Trans. on Power Systems, 2003, Vol. 18, No. 3, pp.1181-1186.
[84]V. N. Dieu and W. Ongsakul, “Ramp rate constrained unit commitment by improved priority list and augmented Lagrange Hopfield network,” Electric Power Systems Research, 2008, 78(3), pp.291-301.
[85]V.N. Dieu and W. Ongsakul, “Improved merit order and augmented Lagrange Hopfield network for unit commitment,” IET Generation, Transmission & Distribution, Jul. 2007, 1(4), pp.548-556.
[86]D. Das and B.F. Wollenberg, “Risk assessment of generators bidding in a Day-Ahead market,” IEEE Trans. on Power Systems, Feb. 2005, Vol. 20, No. 1, pp.416-424.
[87]M. Rahimiyan and H.R. Mashhadi, “Risk analysis of bidding strategies in an electric pay as bid auction: A new theorem,” Energy Conversion & management, Jan. 2007, Vol. 48, pp.131-137.
[88]R.A. Jabr, “Robust self-scheduling under price uncertainty using conditional Value-at-Risk,” IEEE Trans. on Power Systems, Nov. 2005, Vol. 20, No. 4, pp. 1852-1858.
[89]P. Attaviriyanupap and A. Yokoyama, “Price volatility and service interruption Risk-Hedging by transmission contract,” IEEE Trans. on Power Systems, Feb. 2006, Vol. 21, No. 1, pp.211-223.
[90]X. Ma, F. Wen, Y. Ni, and J. Liu, “Towards the development of risk constraints optimal bidding strategies for generation companies in electricity markets,” electric power systems research, 2005, Vol. 73, pp.305-312.
[91]E. Caruso, M. Dicorato, A. Minoia, and M. Trovato, “Supplier risk analysis in the Day-Ahead electricity market,” IEE Proc. Gener. Transm. and Distrib., May 2006, Vol. 153, No. 3, pp.335-342.
[92]T. Li and M. Shahidehpour, “Risk-constrained FTR bidding strategy in transmission markets,” IEEE Trans. on Power Systems, May 2005, Vol. 20, No. 2, pp.1014-1021.
[93]G.P. Granelli, P.Marannino, M. Montagna, and F. Zanellini, “Monte carlo based unit commitment procedure for the deregulated market environment,” International Journal of Electric Power & Energy Systems, 2006., Vol. 28, pp. 712-722
[94]呂榮基和蔡文瑞,“考慮不確定性資料之價格為導向的機組調度,” 第二十七屆電力研討會,PB2.15, 12/22-23, 2006.
[95]A.J. Conejo, F.J. Nogales, and J.M. Arroyo, “Risk-Constraint Self-Ccheduling of a thermal power producer,” IEEE Trans. on Power Systems, Aug. 2004, Vol. 19, No. 3, pp.1569-1574.
[96]H.Y. Yamin and S.M. Shahidehpour, “Risk and profit in Self-Scheduling for GenCos,” IEEE Trans. on Power Systems, Nov. 2004, Vol. 19, No. 4, pp.2104-2106.
[97]E. Ni, P.B. Luh, and S. Rourke, “Optimal integrated generation bidding and scheduling with risk management under a deregulated power market,” IEEE Trans. on Power Systems, Feb. 2004, Vol. 19, No. 1, pp.600-609.
[98]R. Wang, J.C. Shang, X.Y. Zhou, and Y.C. Zhang, “Risk assessment and management of portfolio optimization for power plants,” IEEE Transmission and Distribution Conference: Asia and Pacific, 8/14-17, 2005, Dailan China.
[99]Philippe Jorion, Value at Risk: The new Benchmark for Controlling Market Risk, The McGraw-Hill Companies, Inc, 1997.
[100]C. Marrison, Fundamentals of Risk Measurement, McGraw-Hill Companies, Inc, 2002.
[101]C. Alexander, Risk Management and Analysis, Volume 1 Measuring and Modeling Financial Risk, John Wiley & Sons Ltd., 2000.
[102]P. J. Brockwell and R. A. Davis, Time Series: Theory and Methods, 2nd ed. New York: Springer-Verlag, 1991.
[103]F. J. Nogales, J. Contreras, A. J. Conejo and R. Espínola, “Forecasting Next-Day electricity prices by time series models,” IEEE Trans. on Power Systems, May 2002, Vol. 17, pp.342-348.
[104]J. P. Morgan, Risk Metrics-Technical Document, 4th ed. New York: Morgan Guaranty Trust Company, 1996.
[105]H. M. Markowitz and J. Finance, “Portfolio selection,” 1952, Vol. 8, pp. 77–91.
[106]D. G. Luenberger, Investment Science. New York: Oxford Univ. Press, 1997.