1.Amein, M., Fang, C. S., 1970. Implicit flood routing in natural channel. Journal of Hydraulics Division, ASCE, 96, 2481-2500.
2.Bajracharya, K., Barry, D. A., 1997. Accuracy criteria for linear diffusion wave flood routing. Journal of Hydrology, 195, 200-217.
3.Bloschl, G., Reszler, C., Komma, J., 2008. A spatially distributed flash flood forecasting model. Environmental Modelling & Software, 23, 464-478.
4.Chang, H. H., Hill, J. C., 1976. Computer modeling of erodible flood channels and deltas. Journal of the Hydraulics Division, ASCE, 102(HY10), 1461-77.
5.Chow, V. T., Maidment, D. R., Mays, L. W., 1988. Applied hydrology. McGraw-Hill Book Company.
6.Cunge, J. A., Holly, F. M., Verwey, A., 1980. Practical Aspects of Computational River Hydraulics, Pitman Publishing Ltd., London.
7.Einhelling, R., Holly, F. M., Hsu, S. H., Schwarz, P., Schaefer J., Yang, J. C., 1990. Charima-numerical simulation of unsteady water sediment movement in multiply connected network of mobile-bed channels. IHR Report No. 343, Iowa Institute of Hydraulic Research, The University of Iowa, Iowa City, Iowa 52242 USA.
8.Englund, F., Fredsoe, J., 1976. A sediment transport model for straight alluvial channels. Nordic Hydrology, 7, 296-306.
9.Helmio, T., 2005. Unsteady 1D flow model of a river with partly vegetated floodplains-application to the Rhine River. Environmental Modelling & Software, 20, 361-375.
10.Hsu, M. H., Lin, S. H., Fu, J. C., 2000. Flood forecast system model for Tanshui River Basin, (IV): flood routing model. University of Iowa, hydro informatics 2000 Conference.
11.Hsu, M. H., Fu, J. C., Liu, W. C., 2006. Dynamic routing model with real-time roughness updating for flood forecasting. Journal of hydraulic Engineering, ASCE, 132(6), 605-619.
12.Nguyen, Q. K., Kawano, H., 1995. Simultaneous solution for flood routing in channel networks. Journal of Hydraulic Engineering, ASCE, 121(10), 744–750.
13.Parker, G., 1991. Selective sorting and abrasion of river gravel. Journal of Hydraulic Engineering, ASCE, 117(2), 131-149.
14.Schaffranek, R. W., 1987. Flow model for open-channel reach or network. U.S. Geological Survey Professional Paper 1384, 12.
15.Werner, M., Reggiani, P., Roo, A. D., Rates P., Sprokkereef E., 2005. Flood forecasting and warning at the river basin and at the European scale. Natural Hazards, 36, 25–42.
16.Wiley, J. B., 1993. Simulation flow and solute transport and mitigation of a hypothetical soluble-contaminant spill for the new river in the new river gorge national river. U.S. Geological Survey Water-Resources Investigations Report 93-4105, 39.
17.Wong, T. S. W., Zhou, M. C., 2003. Kinematic wave parameters and time of travel in circular channel revisited. Advances in Water Resources, 26, 417-425.
18.Yen, C. L., Hsu, M. H., 1982. A numerical model for unsteady flow in river system. Proceedings of the Thirds Congress of the Asian and Pacific Regional Division of the International Association for Hydraulic Research, Bandung, Indonesia, 91-101.
19.Yen, C. L., 1985. An overview on flood routing models. Proceedings of the ROC-Japan Joint Seminar on Multiple Hazards Mitigation National Taiwan University, Taipei, Taiwan, 559-582.
20.Yoshida, H., Dittrich, A., 2002. 1D unsteady-state flow simulation of a section of the upper Rhine. Journal of Hydrology, 269, 79-88.
21.林芳明,1998,率定曲線之繪製、修正及各種延伸法應用之比較研究,屏東農專學報,第153頁至第163頁。22.陳信中,2006,蘭陽溪洪水預報模式之研究,國立台灣大學生物環境系統工程學研究所碩士論文。23.陳憲宗,1998,灰色預測在逕流預報之應用,國立成功大學水利及海洋工程學系研究所碩士論文。24.商家瑞,2003,河系一維變量流結合卡門濾波回饋演算模式,國立台灣大學土木工程研究所碩士論文。
25.許銘熙,1984,河川變量流非線性隱式法模式之穩定性,國立台灣大學土木工程研究所博士論文。26.游保杉、曾盈財、董東璟,1997,即時河川流量預報模式,中國土木水利學刊第9卷第1期,139-149。
27.傅金城,2003,即時回饋演算之河川洪水預報模式,國立台灣大學生物環境系統工程學研究所博士論文。28.蔡長泰,1977,隱式法模擬變量流之應用與比較,中華民國第一屆力學會議論文集,285-307。
29.蔡長泰、顏沛華、盧炳堃,濁水溪洪水預報系統之研究(一),1983,行政院國科會防災科技研究報告72-10。
30.蔡長泰、歐善惠、顏沛華、宋長虹、陳聰智,濁水溪洪水預報系統之研究(二),1984,行政院國科會防災科技研究報告73-25。
31.蔡長泰、歐善惠、顏沛華、宋長虹、陳聰智,1985,濁水溪洪水預報系統之研究(三),行政院國科會防災科技研究報告74-38。
32.蔡長泰,曾文溪洪水預報模式之研究(一),1990,行政院國科會防災科技研究報告80-80。
33.蔡長泰、郭惠貞、蔡柏棋、蔡智恆,1991,曾文溪洪水預報模式之研究(二),行政院國科會防災科技研究報告81-61。
34.蔡長泰、陳薔諾、蔡智恆與郭律君,2004,水位-流量率定曲線外插延伸之研究,第十四屆水利工程研討會。
35.賴建信、許盈松,2004,普萊氏流速儀率定關係之研究,台灣水利,第52卷,第1期。
36.顏清連、許銘熙,1982,河系匯流點變量流數值解穩定性之研究,土木水利學會,71年年會論文集,Vol.II。
37.顏清連、徐年盛、徐木城,1979,河床坡度對變量流數值解穩定性之影響,台大土木研究所研究報告,水利6807。
38.顏清連、蔡惠峰,1980,斷面變化對變量流數值穩定之影響,台大土木研究所碩士論文。39.顏清連、林中柱,1981,曼寧氏n對變量流數值穩定之影響,台大土木研究所碩士論文。40.顏清連、許銘熙,1982,河系匯流點變量流數值解穩定性之研究,土木水利學會,71年年會論文集,Vol. II。
41.顏清連、葛餘恕,1983,邊界條件對變量流數值穩定之影響,台大土木研究所碩士論文。42.顏清連、許銘熙、陶偉麟,1983,淡水河系洪水演算模式(1)現況河道模式之建立驗證,行政院國科會防災科技研究報告72-08。
43.顏清連、許銘熙、段鏞,1984,淡水河系洪水演算模式(2)二重疏洪道完成後淡水河系洪流演算模式,行政院國科會防災科技研究報告73-26。
44.顏清連、許銘熙、唐建章,1985,淡水河系洪水演算模式(3)與逕流模式之銜接,國科會防災科技研究報告74-26。
45.顏清連、許銘熙、陳昶憲、賴進松,1986,淡水河系洪水演算模式(4)堤防潰決洪流模式之建立,國科會防災科技研究報告75-19。
46.顏清連、劉家富,1987,淡水河系洪水演算模式(5)水庫操作對洪流之影響,國科會防災科技研究報告76-51。
47.顏清連、王如意、許銘熙、楊德良、李天浩,1996-1998,淡水河整體洪水預報系統模式之研發第一至六階段報告,台灣省水利處委託研究計畫,國立台灣大學水工試驗所。
48.中華民國經濟部水利署第十河川局水文資料庫查詢(http://www.wra10.gov.tw/)