[1]J. F. Manwell, J. G. McGowan, and A. L. Rogers, Wind Energy Explained Theory, Design and Application, Wiley, 2009.
[2]S. Heier, Grid Integration of Wind Energy Conversion Systems, Wiley, 2006.
[3]T. Ackermann, Wind Power in Power Systems, Wiley, 2005.
[4]王世謙、李陽,“風電機組大規模脫網的應對措施”,農村電氣化,第311期,頁53-55,2013年。
[5]Z. Zeng, X. Li, J. Zhou, and Y. Zhang, ‘‘Investigation of wind farm on power system voltage stability based on bifurcation theory,’’ in Proc. of Power and Energy Engineering Conference, pp. 1-4, 2009.
[6]李清吟、徐景河、陳昭榮、吳元康、劉文燦,“大型風場因風速擾動引起之系統衝擊改善”,第31屆電力工程研討會論文集,頁2230-2235,2010年。
[7]R. J. Nelson, H. Ma, and N. M. Goldenbaum “Fault ride-through capabilities of siemens full-converter wind turbines,” in Proc. of IEEE Power and Energy Society General Meeting, pp. 1-5, 2011.
[8]C. Abbey and G. Joos, “Effect of low voltage ride through (LVRT) characteristic on voltage Ssability,” in Proc. of IEEE Power Engineering Society General Meeting, Vol. 2, pp. 1901-1907, 2005.
[9]H. R. Najafi, F. Robinson, F. Dastyar, and A. A. Samadi, “Transient stability evaluation of wind farms implemented with induction generators,” in Proc of the 43rd International Conference on Universities Power Engineering, pp. 1-5, 2008.
[10]L. Meegahapola, D. Flynn, and T. Littler, “Transient stability analysis of a power system with high wind penetration,” in Proc of the 43rd International Conference on Universities Power Engineering, pp. 1-5, 2008.
[11]Y. K. Wu, C. Y. Lee, and G. H. Shu, “Taiwan’s first large-scale offshore wind farm connection-a real project case study with a comparison of wind turbine,” IEEE Trans. on Industry Applications, Vol. 47, No. 3, pp. 1461-1469, 2011.
[12]Siemens Power Technology International, PSS/E Program Operation Manual, Version 33.4, 2013.
[13]洪維恩,MATLAB7程式設計入門,旗標出版,2005年。
[14]Global Wind Energy Concil, Global Wind Report 2013, 2014.
[15]Joint Research Centre, 2013 JRC Wind Status Report, 2014.
[16]張永源,“臺灣風力發電之現況與展望”,環保資訊月刊,第182期,2013年。(http://www.fengtay.org.tw/paper.asp?page=2013&;num=1330&;num2=216)
[17]吳元康、李清吟、周至如、陳自立、彭志強、梁書豪,“大規模風力併入臺電系統對於故障臨界清除時間的影響”,臺電工程月刊,第764期,頁73-82,2012年。
[18]經濟部能源局,風力發電離岸系統示範獎勵辦法,2013年。
[19]張忠良、莊政宏、吳滄堯、梁國堂,“臺灣電力系統併聯再生能源容量及相關議題探討”,臺電工程月刊,第788期,頁74-83,2014年。
[20] 張忠良、洪永輝、姚竺君,“因應新能源政策中部電網之影響與規劃”,臺電工程月刊,第788期,頁8-15,2014年。
[21]牛山泉,圖解風力發電入門,世茂出版集團,2010年。
[22]European Copper Institute, Wind Generator Technology, 2012.
[23]M. Behnke, A. Ellis, Y. Kazachkov, T. McCoy, E. Muljadi, W. Price, and J. Sanchez-Gasca, “Development and validation of WECC variable speed wind turbine dynamic models for grid integration studies,” in Proc. of the AWEA’s 2007 Wind Power Conference, pp. 1-5, 2007.
[24]吳東昇,風力發電機之低電壓忍受能力分析比較,國立中山大學碩士學位論文,2013年。[25]游振和、洪寶亮、蘇育辰、簡弘奇,“風力發電的種類及控制模式概述”,臺電工程月刊,第705期,頁29-40,2007年。
[26]T. Lund, P. Sorensen, and L. Eek, “Reactive power capability of a wind turbine with doubly fed induction generator,” Wind Energy, Vol. 10, No. 4, pp. 379-394, 2007.
[27]V. Akhmatov, Analysis of Dynamic Behavior of Electric Power Systems with Large Amount of Wind Power, Ph. D. Thesis, Technical University of Denmark, 2003.
[28]A. D. Hansen and L. H. Hansen, “Wind turbine concept market penetration over 10 years (1995-2004),” Wind Energy, Vol. 10, No. 1, pp. 81-97, 2007.
[29]李輝、薛玉石、韓力,“併網風力發電機系統的發展綜述”,微特電機,第5期,頁55-61,2009年。
[30]H. Polinder, F. F. A. van der Pijl, G. J. de Vilder, and P. Tavner, “Comparison of direct-drive and geared generator concepts for wind turbines", IEEE Trans. on Energy Conversion, Vol. 21, No. 3, pp.725-733, 2006.
[31]Joint Research Centre, 2012 JRC Wind Status Report, 2013.
[32]I. Dobson, H. D. Chiang, J. S. Thorp, and L. Fekih-Ahmed, “A model of voltage collapse in electric power systems,” in Proc of the 27th IEEE Conference on Decision and Control, Vol. 3, pp. 2104-2109, 1988.
[33]艾斯卡爾、朱永利、唐斌偉,“風力發電機組故障穿越能力問題綜述”,電力系統保護與控制,第41卷,第19期,頁147-153,2013年。
[34]吳元康、李清吟、徐景河、陳自立、趙黃佑,“風力發電機低電壓穿越特性對臺灣離岸風場併接系統影響研究”,臺電工程月刊,第737期,頁61-72,2010年。
[35]J. Morneau, C. Abbey, and G. Joos, “Effect of low voltage ride through technologies on wind farm,” in Proc of the IEEE Canada Electrical Power Conference, pp. 56-61, 2007.
[36]Western Electricity Coordinating Council, The Technical Basis for the New WECC Voltage Ride-Though (VRT) Standard, 2007.
[37]E.ON Netz GmbH, Grid Code High and Extra High Voltage, Germany, 2006.
[38]謝振、張興、宋海華、楊淑英、曹仁賢,“電網電壓驟升故障下雙饋式風力發電機變阻尼控制策略”,電力系統自動化,第36卷,第3期,頁39-46,2012年。
[39]C. Feltes, S. Engelhardt, J. Kretschmann, J. Fortmann, F. Koch, and I. Erlich, “High voltage ride-through of DFIG-based wind turbines,” in Proc. of IEEE Power and Energy Society General Meeting-Conversion and Delivery of Electrical Energy in the 21st Century, pp. 1-8, 2008.
[40]National Grid Electricity Transmission, The Grid Code, Issue 3, Revision 24, UK, 2008.
[41]U. S. A. Federal Energy Regulatory Commission, Interconnection for Wind Energy, 2005.
[42]臺灣電力公司,再生能源發電系統併聯技術要點,2009年。
[43]王醴、吳元康、王耀諄,離岸風場併聯電網之電力品質監測與分析,科技部補助專題研究計畫成果報告期末報告,2014年。
[44]中興工程顧問股份有限公司,彰化離岸風力發電計畫可行性研究,2009年。