|
Reference1. Abdel-Hamid, T. K., “The Dynamics of Software Project staffing: A System Dynamics Based Simulation Approach” 1989, IEEE Transactions on Software Engineering, Vol.15, pp.109-1192. Abdel-Hamed, T.K. and Madnick, SE Software Project Dynamics: An integrated Approach, Prentice-Hall, USA (1991)3. Abdel-Hamed, T.K., “Investigating the Impacts of Managerial Turnover: Succession on Software Project Performance”, 1992, Journal of Management Information Systems, Vol. 9, pp127-1444. Abdel-hamid, T.K., “A Multiproject Perspective of Single-project Dynamics,” 1993, Journal of Systems and Software, Vol. 22, pp.151-1655. Abdel-Hamed, T.K., “Thinking in Circles,” 1993, American Programmer, Vol. 6, pp.3-96. Andrew, F., Modeling the Environment. An Introduction to System Dynamics Modeling of Environmental Systems, 1999, Island press, USA7. Aranda, R. R, Fiddaman, T and Oliva, R “Quality Microworlds: Modeling the Impact of Quality Initiative over the Software Product Life Cycle,”1993, American Programmer, Vol.6, Iss. 5, pp.52-618. Barles, Y. and Bayraktutar, I, “An Interactive Simulation Game for Software Project Management (SOFTSIM)”Proceedings of System Dynamics, 1992, pp59-689. Chapman,R.J., “The role of System Dynamics in Understanding the Impact of Changes to Key Project Personnel on Design Production within Construction Projects, ” International Journal of Project Management, 1998, Vol. 16, No. 4, pp.235-24710. Chichakly, K.J., “The Bifocal Vantage Point: Managing Software Projects from a Systems Thinking Perspectives,” 1993, American Programmer, vol.6, Iss.5, pp. 18-2511. Construction Industry Institute, 1986, Scope Definition and Control, Publication 6-2, pp.45, Austin,12. Cooper, K.G. & Mullen, T.W. ”Swords and Plowshares: The Rework Cycles of Defense and Commercial Software Development Projects,” American programmer, 1993,Vol. 6, No. 5, pp.41-5113. Cooper, K.G., “The Rework Cycle: Why projects are mismanaged” PM Network Magazine, February 1993, pp. 5-714. Cooper, K.G., “Benchmarks for the Project Manager,” Journal of Project Management, March, 199315. Coyle, R.G., System Dynamics Modeling: A Practical Approach, 1994,UK: Chapman & Hall 16. Edward E. (Ted) Douglas third, “Project Trends and Change Control,” AACE International Transactions, 2000, C101-C10517. Forrester, J. “Industrial Dynamics”1961, MIT Press, USA.18. Gideon Samid, PE, “Contingency Revisited,” Cost Engineering, 1994, Vol.36, No. 1219. Greenberger, Martin; Matthew; and Crissey, Brian. 1976. Models in the policy process. New York: Russell Sage Foundation.20. House, Peter, and McLeod, John. 1977. Large scale models for policy evaluation, New York: John Wiley.21. Humphreys, Kenneth, Project and Cost Engineers’ Handbook, NY: Marcel Dekker. 198722. Jessen, S.A., “Can Project Dynamics be modeled?” 1988 International Conference of System Dynamic Society Proceedings, pp.171-18723. Keloharju, R and Wolstenholme, E. F., “A Case Study in System Dynamics Optimizaion” 1989, Journal of the Operation Research Society, Vol. 40, pp221-23024. Kerzner, H., Project Management: A Systems Approach to Planning, Scheduling and controlling, rev. edition, 2001,Canada: John Wiley & Sons 25. Kuntson, Joan & Ira Bitz, Project Management, N.Y. AMACOM, 199126. Lin, C. Y., “Walking on Battlefields: Tools for Strategic Software Management,”1993, American Programmer, Vol.6, Iss. 5, pp. 33-40 27. Mantel, et, 2001, Project management in Practice, NY, John Wiley & Sons28. Project Management Institute (PMI) 2000. A guide to the Project Management Body of Knowledge, Project Management Institute, North Carolina.29. Pugh Roberts Associates-PA Consulting Group, PMMS-Program Management Modeling System Pugh Roberts Associates, USA (1993)30. Richardson, G. P. & Pugh, A.L., Introduction to system dynamics Modeling with Dynamo, 1981, MIT Press, USA31. Rodrigues, A.G., ”The Role of System Dynamics in Project Management: A Comparative Analysis with Traditional Models,” 1994 International System Dynamics Conference Proceedings Lincoln Ma, USA, pp.214-22532. Rodrigues, A.G. & Bowers, J., ”The role of System Dynamics in Project Management,” International journal of Project Management, 1996, Vol. 14, No. 4, pp. 213-22033. Rodrigues, A.G.,”SYDPIM-A System Dynamics-based Project-management Integrated Methodology,” 1997 International System Dynamics conference: “Systems Approach to Learning and Education into the 21st century”. Istanbul, turkey, pp.439-44234. Rodrigues, A.G. & Williams, TM, “System Dynamics in Project Management: Assessing the Impacts of Client Behavior on Project Performance,” Journal of the Operational Research Society, 1998, Vol. 49, pp.2-1535. Rodrigues, A.G., “Managing and modeling Project Risk Dynamics: A System Dynamics-Based Framework,” The fourth European Project Management Conference, 2001 36. Smith,B.J., Nguyen, H and Vidale, R.F. “Death of a Software Manager: How to Avoid Career Suicide through Dynamic Software Process modeling” 1993, American Programmer, Vol.3, Num.5, pp.10-17 37. Stephen Ward, C., ”Assessing and Managing Important Risks,” International Journal of Project Management, 1999, Vol. 17, No. 6, pp. 331-336 38. Wolstenholme, E.F. “System Enquiry-A System Dynamics Approach,” 1990, John Wiley and Sons, UK39. Williams, Terry et al, “The Effects of Design Changes and Delays on Project Costs,” Journal of the Operational Research Society, 1995, Vol. 46, pp.809-818 Chinese literature1. 陶在樸, “系統動態學”, 五南出版社, 1999
|