|
Taiwan often encounters heavy rains in the mountains due to frequent typhoons, which makes the rivers flow directly into the river, and the Spur dike is one of the ways to solve the crisis of water flow. In this paper, the construction case is located in the spur dike of the Six Turtle No. 1 Bridge. This is because the typhoon in Kong-rey has caused severe changes in the river channel, resulting in the entire spur dike foundation being emptied by the river, resulting in dikes. The collapse of the embankment collapsed, so in order to relieve the strength of the river, strengthen apron of the spur dike, and use the wave block to block the strength of the river to reduce the force of the spur. In view of this, this paper applies the engineering legislation to the construction process, closely links the engineering regulations with the construction process, and properly manages the quality to ensure the smooth completion of the project and the consolidation of the embankment, so that the people’s property can be protected and the nearby Residents need no fear of flooding beasts.
|