|
1.Accenture (Andersen Consulting), http://www.accenture.com. 2.Akőz, O. and Petrovic, D., 2007. A fuzzy goal programming method with imprecise goal hierarchy. European Journal of Operational Research, 181(3), pp.1427-1433. 3.Badri, M.A., 2001. A combined AHP-GP model for quality control systems, International Journal of Production Economics, 72(1), pp.27-40. 4.Bauknight, D.N. and Miller, J.R., 1999. Fourth Party Logistics™: The Evolution of Supply Chain Outsourcing, CALM Supply Chain & Logistics Journal. 5.Berman, J., 2006. Recent deals drive logistics industry consolidation. Logistics Management, 45 (1), pp.14-16. 6.Bookbinder, J.H., Higginson, J. K., 2002. Probabilistic modeling of freight consolidation by private carriage. Transportation Research Part E: Logistics and Transportation Review, 38(5), pp.305-318. 7.Bumstead, J. and Cannons, K., 2002. From 4PL to Managed Supply-Chain Operations. Logistics & Transport Focus, 4(4), pp. 102-111. 8.Canitz, H.C., 1996. How to find, evaluate, choose, and manage a third party logistics provider. Annual Conference Proceedings, pp.597-624. 9.Chen, K.H., Wong, J.T. and Su, C.T., 2009. Design of supply chain networks with multi-phased discount price and service level: formulation, complexity, and algorithm. Journal of Information and Optimization Sciences, 30(2), pp.311-334. 10.Chen, L.H. and Tsai, F.C., 2001. Fuzzy goal programming with different importance and priorities. European Journal of Operational Research, 133(3), pp.548-556. 11.Chen, L.H. and M.C., 2006. An evaluation approach to engineering design in QFD processes using fuzzy goal programming models. European Journal of Operational Research, 172 (1), pp.230-248. 12.Coello, C.A.C., Pulido, G.T. and Lechuga, M.S., 2004. Handling multiple objectives with particle swarm optimization. IEEE Transactions on Evolutionary Computation, 8 (3), pp.256-279. 13.Copacino, W. C., 1997. Fourth- Party Logistics”: Beyond 3PL. Logistics Management, 36(4), pp.43. 14.Costa Jr, E.F., Lage, P.L.C. and Biscaia Jr, E.C., 2003. On the numerical solution and optimization of styrene polymerization in tubular reactors. Computers and Chemical Engineering, 27(11), pp.1591-1604. 15.Crainic, T. G., 2000. Service network design in freight transportation. European Journal of Operational Research, 122(2), pp.272-288. 16.Foster, T., 1999. 4PLs: The next generation for supply chain outsourcing? Logistics Management & Distribution Report, 38(4), pp.35. 17.Gattorna, J. L., 1998. Strategic Supply Chain Alignment. Gower. Publishing Limited, 1sted. 18.Gui, Y., Gong, B. and Cheng, Y., 2008. An Algorithm for Air Cargo Forwarders Consolidation Problem. Fourth International Conference on Natural Computation, 7(18-20), pp.372-376. 19.Hannan, E.L., 1981. Linear programming with multiple fuzzy goals. Fuzzy Sets and Systems, 6(3), pp.235-248. 20.Hu, X. and Eberhart, R., 2002. Multiobjective Optimization Using Dynamic Neighbourhood Particle Swarm Optimization. IEEE Congress on Evolutionary Computation,2, pp.1677-1681. 21.Huang, M., Tong, W., Wang, Q., Xu, X., Wang, X., 2006. Immune Algorithm Based Routing Optimization in Fourth-Party Logistics. IEEE Congress on Evolutionary Computation, pp.3029-3034. 22.Iskander, M.G., 2004. A fuzzy weighted additive approach for stochastic fuzzy goal programming. Applied Mathematics and Computation, 154(2), pp.543-553. 23.Janson, S., Merkle, D. and Middendorf, M., 2008. Molecular docking with multi-objective Particle Swarm Optimization. Applied Soft Computing Journal, 8(1), pp.666-675. 24.Kasilingam, R. G., 1998. Logistics and Transportation. Kluwer Academic Publishers, pp.235-254. 25.Kennedy, J. and Eberhart, R., 1995. Particle swarm optimization. IEEE International Conference on Neural Networks, 4, pp.1942-1948. 26.Kim, J.S. and Whang, K.S., 1998. A tolerance approach to the fuzzy goal programming problems with unbalanced triangular membership function. European Journal of Operational Research, 107(6), pp.614-624. 27.Ko, H. J., Ko, C. S. and Kim, T., 2006. A hybrid optimization/simulation approach for a distribution network design of 3PLS. Computers & Industrial Engineering, 50(4), pp.440-449. 28.Ko, H. J. and Evans, G. W., 2007. A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs. Computers and Operations Research, 34(2), pp.346-366. 29.Lau, H. C. and Goh, Y. G., 2002. An intelligent brokering system to support multi-agent Web-based 4th-party logistics. Proceedings of the 14th IEEE International Conference on Tools with Artificial Intelligence, pp.154-161. 30.Leung, L. C., Cheung, W. and Hui, Y. V., 2000. A Framework for a Logistics E-Commerce Community Network: The Hong Kong Air Cargo Industry. IEEE Transactions on Systems, Man, and Cybernetics—Part A: Systems and Humans, 30(4), pp.446-455. 31.Li, X., Ying, W., Liu, W., Chen, J., Huang, B., 2003. The decision optimization model of 4PL. IEEE International Conference on Systems, Man and Cybernetics, 2(5-8), pp.1241-1245. 32.Lieb, R.C. and Bentz, B.A., 2004. The use of third-party logistics services by large American manufacturers: The 2003 survey. Transportation Journal, 43(3), pp.24-33. 33.Liu, L. and Yao, J., 2007. Multi-objective Optimization Algorithm Analysis on Supply Chain Resources Integration Decision in 4PL. IEEE International Conference on Automation and Logistics, pp.1852-1857. 34.Min, H. and Ko, H. J., 2008. The dynamic design of a reverse logistics network from the perspective of third-party logistics service providers. International Journal of Production Economics, 113(1), pp.176-192. 35.Mukhopadhyay, S. K. and Setaputra, R., 2006. The role of 4PL as the reverse logistics integrator: Optimal pricing and return policies. International Journal of Physical Distribution & Logistics Management, 36(9), pp.716-729. 36.Omkar, S.N. Mudigere, D., Naik, G. N., Gopalakrishnan, S., 2008. Vector evaluated particle swarm optimization (VEPSO) for multi-objective design optimization of composite structures. Computers and Structures, 86(1-2), pp.1-14. 37.Ourique, C.O., Biscaia Jr, E.C. and Pinto, J.C., 2002. The use of particle swarm optimization for dynamical analysis in chemical processes. Computers and Chemical Engineering, 26(12), pp.1783-1793. 38.Schwartz, E., 2003. The logistics handoff. Infoworld, 25(44), pp.53. 39.Shi, Y. and Eberhart, R., 1998. A modified particle swarm optimizer, The 1998 IEEE International Conference on Evolutionary Computation, pp.69-73. 40.Spellmann, A., Erickson, K. and Reynolds, J., 2003. Server consolidation using performance modeling. IT Professional, 5(5), pp.31-36. 41.T’kindt, V., Monmarché, N., Tercinet, F., Laügt, D., 2002. An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem. European Journal of Operational Research, 142(2), pp.250-257. 42.Tiwari, R.N., Dharmar, S., and, Rao, J.R., 1986. Priority structure in fuzzy goal programming. Fuzzy Sets and Systems, 19(3), pp.251-259. 43.Tiwari, R.N., Dharmar, S., and Rao, J.R., 1987, Fuzzy goal programming – an additive model, Fuzzy Sets and Systems, 24 (1), pp.27-34. 44.Tsai, K.M., You, S.Y., Lin, Y.H., Tsai, C.H.., 2008. A fuzzy goal programming approach with priority for channel allocation problem in steel industry. Expert Systems with Applications, 34(3), pp.1870-1876. 45.Tyan, J.C., Wang, F. K. and Du, T. C., 2003. An evaluation of freight consolidation policies in global third party logistics. Omega, 31(1), pp.55-62. 46.Wang, H. F. and Fu, C.C., 1997. A generalization of fuzzy goal programming with preemptive structure. Computers operation research, 24(9), pp.819-828. 47.Wang, L. and Singh, C., 2008. Stochastic combined heat and power dispatch based on multi-objective particle swarm optimization. International Journal of Electrical Power and Energy Systems, 30(3), pp.226-234. 48.Warrilow, D. and Beaumont, C., 2007. 3PLs vs 4PLs the Great Debate. Logistics & Transport, 9(6), pp.30-33. 49.Wong, J.T., Chen, K.H., and Su, C.T., 2008. Designing a system for a process parameter determined through modified PSO and fuzzy neural network. Lecture Notes in Computer Science, 5012, pp.785-794. 50.Wong, W. H., Leung, L. C. and Hui, Y. V., 2009. Airfreight forwarder shipment planning: A mixed 0–1 model and managerial issues in the integration and consolidation of shipments. European Journal of Operational Research, 193(1), pp. 86-97. 51.Zimmermann, H.J., 1978. Fuzzy programming and linear programming with several objective functions. Fuzzy sets and systems, 1(1), pp.45-56.
|