|
[1] Gottipolu, R. B., and Ghosh, K., 1997, “Representation and Selection of Assembly Sequences in Computer-Aided Assembly Process Planning,” International Journal of Production Research, Vol. 35, No. 12, pp. 3447-3465. [2] Laperrière, L., El-Maraghy H. A., 1994, “Assembly Sequences Planning for Simultaneous Engineering Applications,” International Journal of Advanced Manufacturing Technology, Vol. 9, No. 4, pp. 231-244. [3] Fazio De, T. L., and Whitney, D. E., 1997, “Simplified Generation of All Mechanical Assembly Sequence,” IEEE Robot Automation, Vol. RA-3, No. 6, pp. 640-658. [4] Dini, G., and Santochi, M., 1992, “Automated Sequencing and Subassembly Detection in Assembly Planning,” Annals of the CIRP, Vol. 41, No. 1, pp. 1-4. [5] 黃俊廷, 1999, 電腦輔助拆卸程序產生及評估, 國立台灣大學 機械工程研究所, 碩士論文。 [6] Ko, H., and Lee, K., 1987, “Automatic Assembling Procedure Generation from Mating Conditions,” Computer-Aided Design, Vol. 19, No. 1, pp. 5-10. [7] Tonshoff, H. K., Menzel, E., and Park, H. S., 1992, “A Knowledge-Based System for Automated Assembly Planning,” Annals of the CIRP, Vol. 41, No. 1, pp. 19-24. [8] Bonneville, F., Perrard, C., Henrioud, J. M., 1995, “A Genetic Algorithm to Generate and Evaluate Assembly Plans,” IEEE Symposium on Emerging Technologies & Factory Automation, , Vol. 41, No. 1,pp.231-239. [9] 楊家豪, 1997, 以遺傳演算法應用於電腦輔助裝配程序規劃問題 之研究, 國立台灣大學工業工程研究所, 碩士論文。 [10] Choi, C. K., and Zha, X. F., 1998, “On the Automatic Generation of Product Assembly Sequences,” International Journal of Production Research, Vol. 36, No. 3, pp. 617-633. [11] Arai, E., and Iwata, K., 1993, “CAD System with Product Assembly/Disassembly Planning,” Robotics and Computer-Integrated Manufacturing, Vol. 10, No. 1-2, pp. 41-48. [12] Zussman, E., Kriwet, A., and Seliger, G., 1994, “Disassembly-Oriented Assessment Methodology,” Annals of the CIRP, Vol. 43, No. 1, pp. 9-14. [13] Lambert, A. J. D., 1997, “Optimal Disassembly of Complex Products,” International Journal of Production Research, Vol. 35, No. 9, pp. 2509-2523. [14] Gungor, A. and Gupta, S. M., 1998, “Disassembly Sequence Planning for Products with Defective Parts in Product Recovery ,” Computers & Industrial Engineering Proceedings of the 1997 23rd International Conference, USA, Elsevier Sci Ltd Exeter Engl p 161-164. [15] Gungor, A., and Gupta, S. M., 1997, “Evaluation Methodology for Disassembly Processes,” Computers & Industrial Engineering, Vol. 33, No. 1-2, pp. 329-332. [16] John Holland, 1975, Adaptation in natural and artificial systems. [17] Goldberg, David E., 1989, Genetic Algorithms in Search, Optimization, and Machine Learing, Addison-Wesley. [18] Takeshi, M., Fuminori, O., Shigeki, A., and Yoshiyuki, Y., 2001, “Disassembly Sequence Generation using Information Entropy and Heuristics for Component Replacement,” International Symposium on Assembly and Task Planning, Vol. 41, No. 1, pp. 208-213.
|