[1]Appleton E.L., 1996, “Divorce your outsourcer?,” Datamation, Vol.42, (14), pp.60-62.
[2]Axsater, S., 1996, “Using the determinidtic EOQ formula in stochastic inventory control,” Management Science, Vol.42, (6).
[3]Cao Q. and Wang Q., 2007, “Optimizing vender selection in a two stage outsourcing process,” Computer & Operations Research, Vol.34, pp.3757-3768.
[4]Chang H.C., 2004, “An application of fuzzy sets theory to the EOQ model with imperfect quality items,” Computer & Operations Research, Vol.31, pp.2079-2092.
[5]Cheng T.C.E, 1991, “An economic order quantity model with demand dependent unit production cost and imperfect production process,” IIE Transactions, Vol.23, pp.23-28.
[6]Chiao H. E., Su L. H. and Wee H. M., 2007, “EOQ model with time constraint, imperfect items and backorders,” Journal of Advanced Engineering, Vol.2, (1), pp.21-26.
[7]Choi E.K., 2007, “To outsource or not to outsource in an integrated world,” International Review of Economics and Finance, Vol.16, pp.521-527.
[8]Chou T. C., Chen J.R. and Pan S. L., 2006, “The impacts of social capital on information technology outsourcing decisions: A case study of a Taiwanese high-tech firm,” International Journal of Information Management, Vol.26, pp.249-256.
[9]Freimer M., Thomas D. and Tyworth J., 2006, “The value of setup cost reduction and process improvement for the economic production quantity model with defects,” European Journal of Operational of Operational Research, Vol.173, pp.241-251.
[10]Gilleya K. M. and Rasheed A., 2000, “Making more by doing less: An analysis of outsourcing and its effects on firm performance,” Journal of Management, Vol.26, (4), pp.763-790.
[11]Harris, F. W., 1913, “How many parts to make at once,” The Magazine of Management, Vol.10, pp.135-136, 152.
[12]Hax A. C. and Candea D., 1984, “Production and Inventory Management,” Prentic-Hall, New Jersey, pp.133-134.
[13]Hayek P.A. and Salameh M.K., 2001, “Production lot sizing with the reworking of imperfect quality items produced,” Production Planning and Control, Vol.12, (6), pp.584-590.
[14]He Y., Wang S. Y. and Lai K.K., 2010, “An optimal production-inventory model for deteriorating items with multiple-market demand,” European Journal of Operational Research, Vol.203, (3), pp.593-600.
[15]Jaber M. Y., Goyal S. K. and Imran M., 2008, “Economic production quantity model for items with imperfect quality subject to learning effects,” International Journal of Production Economics, Vol.115, pp.143-150.
[16]Khouja, M. and Park, S., 2003, “Optimal lot sizing under continuous price decrease,” Omega, Vol.31, pp.539-545.
[17]Lee H. L. and Rosenblatt M.J., 1985, “Optimal inspection and ordering policies for products with imperfect quality,” IIE Transactions, Vol.17, pp.284-289.
[18]Li J. and Liu L., 2006, “Supply chain coordination with quantity discount policy,” International Journal of Production Economics, Vol.101, pp.89-98.
[19]Li S. X. and Huang Z., 1995, “Managing buyer-seller system cooperation with quantity discount considerations,” Computer and Operations Research, Vol.22(9), pp.947-958.
[20]Liang Y. L. and Zhou F. M., 2011, “A two-warehouse inventory model for deteriorating items under conditionally permissible delay in payment,” Applied Mathematical Modelling, Vol.35, pp.2221–2231.
[21]Lin Y. J., 2008, “Minimax distribution free procedure with backorder price discount,” International Journal of Production Economics, Vol.111, pp.118-128.
[22]Lin T. Y., 2010, “An economic order quantity with imperfect quality and quantity discounts,” Applied Mathematical Modeling, doi:10.1016/j.apm.2010.02.004.
[23]Matsuyama K., 2001, “The EOQ-models modified by introducing discount of purchase price or increase of setup cost,” International Journal of Production Economics, Vol.73, pp.83-99.
[24]Mondal B., Bhunia A.K. and Maiti M., 2009, “Inventory models for defective items incorporating marketing decisions with variable production cost,” Applied Mathematical Modelling, Vol.33, (6), pp.2845-2852.
[25]Morteza R. B., Morteza J. and Mehdi B., 2011, “Effects of Imperfect Products on Lot Sizing with Work in Process Inventory,” Applied Mathematics and Computation, doi: 10.1016/j.amc.2011.03.023.
[26]Ouyang L.Y., Chen C.K. and Chang H.C., 2002, “Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process,” Computer & Operations Research, Vol.29, pp.1701-1717.
[27]Ruud T., 2005, “Anote on “Khouja and Park, optimal lot sizing under continuous price decrease,Omega 31 (2003),” Omega, Vol.33, pp.467-471.
[28]Salameh M. K. and Jaber M. Y., 2000, “Economic production quantity model for items with imperfect quality,” International Journal of Production Economics, Vol.64, pp.59-64.
[29]Saligrama R.,A. and Ron S. K., 1995, “The impact of defects on a process with rework,” European Journal of Operational Research, Vol.80, pp.308-327.
[30]Sana S. S. and Chaudhuri K.S., 2008, “A deterministic EOQ madel with delays in payments and price-discount offers,” European Journal of Operational Research, Vol.184, pp.509-533.
[31]Tersine R. J., 1994, “Principles of Inventory and Materials Management,” PTR prentice Hall, Englewood Cliffs, New Jersey, pp.90-95.
[32]Tripathy P. K., Wee H. M. and Majhi P R., 2003, “An EOQ model with process reliability considerations,” Journal of the Operational Research Society, Vol.54, pp.549-554.
[33]Tsai J. F., 2007, “An optimization approach for supply chain management models with quantity discount policy,” European Journal of Operational Research, Vol.177, pp.982-994.
[34]Varadarajan R., 2009, “Outsourcing:think more expansively,” Journal of Business Research, Vol.62, (11), pp.1165-1172.
[35]Wee H.M., 1995, “A replenishment policy for items with a price-dependent demand and a varying rate of deterioration,” Production Planning and Control, Vol.18, (5), pp.494-499.
[36]Wee H. M. and Yu J., 1997, “A deteriorating inventory model with a temporary price discount,” International Journal of Production Economics, Vol.53, pp.81-90.
[37]Widyadana G. A. and Wee H. M., 2011, “Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time,” Applied Mathematical Modelling, Vol.35, (7), pp.3495-3508.
[38]Wu K. S. and Ouyang L. Y., 2001, “(Q,r,L) Inventory model with defective items,” Computer & Industrial Engineering, Vol.19, pp.173-185.
[39]Yang P. C., 2004, “Pricing strategy for deteriorating items using quantity discount when demand is price sensitive,” European Journal of Operational Research, Vol.157, pp.389-397.
[40]Yu, J., Mungan, D. and Sarker, B.R., 2011, “An integrated multi-stage supply chain inventory model under an infinite planning horizon and continuous price decrease,” Computers & Industrial Engineering, doi: 10.1016/j.cie.2011.03.002.
[41]Zhang B. and Du S., 2010, “Multi-product newsboy problem with limited capacity and outsourcing,” European Journal of Operational Research, Vol.202, pp.107-113.
[42]MBA 智庫百科(2011),價格[線上資料],來源:http://wiki.mbalib.com/ wiki/MBA[2011,April 20]。
[43]黃惠民、楊伯中編著,2007,「供應鏈存貨系統設計與管理-觀念、策略與個案研究」,滄海書局出版。
[44]林素玉,2006,可回收性商品考慮數量折扣及不良品的報童問題,中原大學工業工程學系碩士學位論文。[45]黃祥銘,2008,考慮欠撥折扣下與不良品修復之整合性存貨模式研究,南台科技大學工業管理研究所碩士學位論文。[46]趙皇傑,2004,在含不良品重工修復程序之生產環境下的重要決策分析,朝陽科技大學工業工程與管理系碩士論文。[47]王聖嘉,2004,探討經濟生產批量模式含不良品重工之最佳決策,中原大學工業工程學系博士學位論文。[48]蘇瑋婷,2005,考慮外包價格及彈性之產能規劃,國立交通大學工業工程與管理學系碩士論文。[49]湯瑪斯.佛里曼,2005, 「世界是平的」,雅言文化出版社。