1.陳俊昌,「非鍵盤資料輸入技術在營造工程工地資料處理之應用」,碩士論文,國立中央大學土木工程研究所,桃園,1995。
2.黃景徽,「條碼應用簡介」,華銀月刊,513期,1993。3.黃衍文,「條碼製作技術」,技術學刊,第四期,第597-602頁,1999。4. Bob G. McCullouch, “ 2D Bar-Code Applications in Construction”, Journal of Construction Engineering and Management, December, Vol. 120, No. 4, pp. 739-752, 1994,
5.Leonhard E. Bernold,Bar Code—Driven Equipment and Materials Tracking for Construction,Journal of Computing in Civil Engineering, Vol. 4, No. 4, October 1990, pp. 381-3956.George Stukhart,Bar-Code Standardization in Industrial Construction,Journal of Construction Engineering and Management, Vol. 116, No. 3, September 1990, pp. 416-431 。
7.Leonhard E. Bernold,Testing Bar-Code Technology In Construction Environment,Journal of Construction Engineering and Management, Vol. 116, No. 4, December 1990, pp. 643-655。
8.Lansford C. Bell and Bob G. McCullouch,Bar Code Applications in Construction,Journal of Construction Engineering and Management, Vol. 114, No. 2, June 1988, pp. 263-278
9.鄧朝元,「條碼在營建管理之應用模式分析及可行性評估之研究」,碩士論文,中華工學院土木研究所,新竹,6月,1994。
10.王明德、黃俊能,「自動辨識系統在鋼結構大樓施工作業流程上之應用(上)」,現代營建,第兩百零一期,第45-61頁,9月,1999。11.王明德、黃俊能,「自動辨識系統在鋼結構大樓施工作業流程上之應用(下)」,現代營建,第兩百零二期,第31-41頁,10月,1999。12. 行政院公共工程委員會網頁:http://www.pcc.gov.tw/big5/
13. 葉文凱,「營建工程成本控制作業」,現代營建,第一卷二期,第20頁,民國2月,1980年。14.柯鎮洋,「營建業成本控制」,營建管理季刊,第十八期,第70-72頁,2月,1980年。15.「公共建設工程經費電腦估價系統期末報告書」,行政院公共工程委員會,1月,2000年。
16.范光懿,「從成本會計的角度看營造業的成本控制」,營造天下,第五十一期,第37-41頁,3月,1990年。17.余文德,「高等成本與財務管理」課程講義,中華大學營建管理研究所,09月,2001年。
18.劉福勳,「工程財務管理」,漢天下工程管制顧問有限公司,第二版,10月,1998年。
19.「公共工程綱要編碼」,行政院公共工程委員會,12月,2001年。