|
1 Billingsley, P., Convergence of Probability Measures, John Wiley and Sons, New York(1968). 2 British Standards Institution, British Standards Guide to Data Analysis and Quality Control Using CUSUM Techniques(1982). 3 Brook, D., and Evans, D. A., “An Approach to the Probability Distribuyion of CUSUM Run Length,” Biometrika, 59, 539-549(1972). 4 Chung, K. L., A Course in Probability Theory, second edition, Academic Press, New York(1974). 5 Fleming, T. R. And Harrington, D. P., Counting Process and Survival Analysis, Wiley, New York(1991). 6 Gan, F. F., “An Optimal Design of CUSUM Quality Control Charts,” Journal of Quality Technology, 23, 279-286(1991). 7 Gan, F. F., “An Optimal Design of CUSUM Control Charts for Binomial Counts,” Journal of Applied Statistics, 20(4), 445-460(1993). 8 Goodman, L. A., “The Analysis of Multidimensional Contingency Table: Stepwise Procedures and Direct Estimation Methods for Building Models for Multiple Classifications,” Technometrics, 13, 33-61(1971). 9 Goran, B., “A Matringale Approach to the Changepoint Problem,” Journal of the American Statistical Assoclation, 92, 1177-1185(1997). 10 Hinkley, D., “Inference About the Change-Point in a Sequence of Random Variables,” Biometrika, 57, 1-17(1970). 11 Hinkley, D. V., “Inference in Two-Phase Regression,” Journal of the American Statistical Assoclation, 66, 736-743(1971). 12 Huson, D. J., “Fitting Segmented Curves whose Join Points have to be Estimated,” Journal of the American Statistical Assoclation, 61, 1097-1129(1966). 13 Kalpakjian S., Manufacturing Engineering and Technology, second edition, Reading, MA:Addison-Wesley(1990). 14 Kolarik, W. J., Creating Quality: Concepts, Systems, Strategies, and Tools, McGraw-Hill, Singapore(1995). 15 Lucas, J. M., “Counted Data CUSUM’s,” Technometrics, 27, 129-144(1985). 16 Lucas, J. M., and Crosier, R. B., “Fast Initial Response for CUSUM Quality Control Schemes: Give Your CUSUM a Head Start,” Technometrics, 24, 199-205(1982). 17 McCullagh, P., and Nelder, J. A., Generalized Linear Models, Chapman Hall, London(1983). 18 Meyer, P. A., Probability and Potentials, Blaisdell, Waltham MA(1966). 19 Montgomery, D. C., Introduction to Statistical Quality Control, second edition , John Wiley and Sons, New York(1996). 20 Page, E. S., “Continuous Inspection Schemes,” Biometrika, 41, 100-115(1954). 21 Pettitt, A. N., “A Nonparametric Approach to the Change-Point Problem,” Applied. Statisttics, 28, 455-464(1979). 22 Pettitt, A. N., “A Simple Cumulative Sum Type Statistic for the Change- Point Problem with Zero-One Observations,” Biometrika, 67, 79-84(1980). 23 Schechtman, E., “A Nonparametric Test for Detecting Changes in Location,” Comm. Statis, All(13), 1475-82(1982). 24 Shewhart, W. A., Economic Control of Quality Manufactured Product, Van Nostrand(1931). 25 Smith, A. F. M., “A Bayesian Approach to Inference About a Change- Point in a Sequence of Random Variables,” Biometrika, 62, 407-416(1975). 26 Thomas, P. R., Statistical Methods for Quality Improvement, John Wiley and Sons, New York(1989). 27 Worsley, K. J., “The Power of Likelihood Ratio and Cumulative Sum Tests For a Change in a Binomial Probability,” Biometrika, 70, 455-464(1983). 28 潘浙楠及林永鴻,「影響熱軋鋼品品質要因之分析」,品質管制月刊,第30卷,第12期,46-53(1994).
|