1.Chung, J.A., Holly, F.M., Verway, A.,1980 “Practical Ascepts of Coputational River System,” Pitman Publishing Limited, London.
2.Lin, S.S., Hsieh, S.H., Kuo, J.T., Chen, Y.C. and Liao, Y.P., 2004, “Integrating SWMM with Optimization Module for Feasibility of Real Time Control in Urban Drainage Systems,” Proceedings of the 6th International Conference on Hydroinformatics, Vol. 2, pp. 1899-1906, Singapore.
3.Lin, S.S., Liao, Y.P., Hsieh, J.T., Kuo, J.T. and Chen, Y.C., 2010, “A Pattern-Oriented Approach to Development of a Real-Time Storm Sewer Simulation System with an SWMM Model,” Journal of Hydroinformatics, Vol.12, No.4, pp.408-423.
4.O’Brien, J.D., 2006, ” FLO-2D user’s manual,” Nutrioso:Flo engineering.
5.U.S. Army Corps of Engineers, 1990,“HEC-1 Flood hydrograph package: User''s manual and programmer''s manual,” Hydrologic Engineering Center.
6.WL| Delft Hydraulics and Rijkswaterstaat, 1995, “SOBEK 1.0—User''s guide,” Delft, The Netherlands.
7.WL| Delft Hydraulics, 2001, “SOBEK Software User’s Manual,” Delft, The Netherlands.
8.吳上煜,2000,”網際網路淹水預警資訊系統介面設計之研究”,國立台灣大學地理學研究所碩士論文。9.林偉立,2009,”結合ANFIS模式與WebGIS技術於雨水下水道水位預測”,中原大學土木工程研究所碩士論文。10.林偉立、甘秉玄、林旭信,2014,”結合Web GIS展示技術與ANFIS模式之雨水下水道水位預警系統”,技術學刊,第29卷,第2期,105-114頁。11.張文鎰、賴進松、王聖川、洪國展、游騰一、李隆正、郭文達、蔡惠峰,2013,”二維水理多模式平台之研發與應用”,中國土木水利工程學刊,第25卷,第1期,21-32頁。12.經濟部水利署水利規劃試驗所,2010,「易淹水地區水患治理計畫」第 1 階段實施計畫─易淹水地區水患治理之非工程措施規劃。
13.經濟部水利署,2012,台灣脆弱度及風險地圖製作與整合應用(1/2)。
14.蔡文雄、林旭信、謝尚賢、廖英博,2009,”結合即時水理模擬與Web GIS展示技術於都市雨水下水道系統淹水預警之應用”,土木水利,第36卷,第6期。15.賴進松,1986,”堤防潰決後二維性洪流演算模式”,國立臺灣大學土木工程研究所碩士論文。16.賴進松,2000,”台北都會區淹水區域預測之研究─台北都會區淹水區域預測之研究-子計畫:三重、蘆洲及新莊地區”。
17.顏清連,許銘熙,賴進松,1989,”洪氾區二維變量流模擬─ADE法與SES法之比較”,七十八年電子計算機於土木水利工程應用論文研討會,台北市。