1.顏憶茹、張淳智,1998,物流管理,二版,台北,前程圖書。
2.張有恒,1998,物流管理,初版,台北,華泰書局。
3.蘇雄義譯,2003,供應鏈之設計與管理,二版,台北,美商麥格羅.希爾國際。
4.張宏吉,2000,可控制參數的連續性檢查存貨系統之研究,私立淡江大學管理科學學系博士論文。5.鄭家昌,2002,不可靠生產系統之經濟批量模式-考慮瑕疵品及重製製程,國立成功大學工業管理研究所碩士論文。6.陳銘琪,2002,含不良品之單一供應商與多零售商整合性二階存貨模式,私立中原大學工業工程學系碩士論文。7.楊金山,2003,可控制變數之整合性存貨系統研究,國立台灣科技大學工業管理系博士論文。8.吳碧玉,2003,不完美品質生產系統之最佳經濟生產批量之探討,私立朝陽科技大學工業工程與管理所碩士論文。9.蔡依齡,2003,允許部分欠撥下不完美生產系統之經濟批量,私立真理大學管理科學研究所碩士論文。10.黃家伶,2006,考慮前置時間與品質成本之整合存或模式研究,私立南台科技大學工業管理研究所碩士論文。11.美國生產與存貨管理學會(American Productionn and Inventory Control Society, APICS),http://www.apics.org
12.Abdullah, E. and Gultekin O., 2007, An economic order quantity model with defective items and shortages, International Journal of Production Economics, 106, 544-549.
13.Banerjee, A., 1986, A joint economic-lot-size model for purchaser and vender, Decision Sciences, 17, 292-311.
14.Chang, H. C., Ouyang, L. Y., Wu, K. S. And Ho, C. H., 2006, Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction, European Journal of Operational Research, 170, 481-495.
15.Goyal, S. K., 1976, An integrated inventory model for a single supplier-single customer problem, International Journal of Production Research, 15(1), 107-111.
16.Ha, D. and Kim, S. L., 1997, Implementation of JIT purchasing: an integrated approach, Production Planning & Control, 8(2), 152-157.
17.Harris, F. W., 1915, What quantity to make at once, The Library of Factory Management, 5, 47-52.
18.Huang, C. K., 2004, An optimal policy for a single-vender single-buyer integrated production-inventory problem with process unreliability consideration, International Journal of Production Economics, 91, 91-98.
19.Liao, C. J. and Shyu, C. H., 1991, An analytical determination of lead time with normal demand, International Journal of Operations and Production Management, 11(9), 72-78.
20.Liu, J. J. and Yang, P., 1996, Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs, European Journal of Operational Research, 91, 517-527.
21.Lu, L., 1995, A one-vendor multi-buyer integrated inventory model, European Journal of Operational Research, 81, 312-323.
22.Ouyang, L. Y. and Chang, H. C., 2002, Lot size reorder point inventory model with controllable lead time and set-up cost, International Journal of System Science, 33, 25-42.
23.Ouyang, L. Y., Chen, C. K. and Chang, H. C., 1999, Lead time and ordering cost reductions review inventory system with partial backorders, Journal of the Operational Research Society, 50, 1272-1279.
24.Ouyang, L. Y. and Wu, K. S., 1997, Mixture inventory model involving variable lead time with a service level constraint, Computers and Operations Research, 24(9), 875-882.
25.Ouyang, L. Y., Wu, K. S. and Ho, C. H., 2004, Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time, International Journal of Production Economics, 92, 255-266.
26.Ouyang, L. Y., Yeh, N. C. and Wu, k. S., 1996, Mixture inventory model with backorders and lost sales for variable lead time, Journal of the Operational Research Society, 47, 829-832.
27.Pan, J. C., Lo, M. C. and Hsiao, Y. C., 2004, Optimal reorder point inventory models with variable lead time and backorder discount considerations, European Journal of Operational Research, 158, 488-505.
28.Pan, J. C. and Hsiao, Y. C., 2005, Integrated inventory models with controllable lead time and backorder discount considerations, International Journal of Production Economics, 93-94, 387-397.
29.Porteus, E. L., 1985, Investing in reduced setups in the EOQ model, Management Science, 31, 998-1010.
30.Rosenblat, M. J. and Lee, H. L., 1986, Economic production cycles with imperfect production processes, IIE Transactions, 18, 48-55.
31.Salameh, M. K. and Jaber, M. Y., 2000, Economic production quantity model for items with imperfect quality, International Journal of Production Economics, 64, 59-64.
32.Schwaller, R. L., 1988, EOQ under inspection costs, Production and Inventory Management, 29, 22-24.
33.Taft, E. W., 1918, The most economical production lot, The Iron Age, 101, 1410-1412.
34.Tersine, R. J., 1994, Principles of Inventory and Material Management, North Holland, New York.
35.Wu, K. S. and Ouyang, L. Y., 2001, (Q,r,L) Inventory model with defective items, Computers & Industrial Engineering, 39, 173-185.