1.Ahuja, H. N. and Dozzi, S, P., and Abourizk, S. K., Project Management:Techniques in Planning and Controlling Construction Project, John Wiley & Sons, Inc., New York, 1994.
2.Amekudzi, A. and McNeil, S.,“Capturing Data and Model Uncertainties in Highway Performance Estimation,”Journal of Transportation Engineering, ASCE, Vol. 126, No. 6, pp. 455-463, 2000.
3.Ang, A., Abdelnour, J., and Chaker, A.A.,“Analysis of activity networks under uncertainly,”Journal of the Engineering Mechanic Division, ASCE, Vol. 101, No. 4, pp. 373-387, 1975.
4.Arditi, D. A., and Messiha, H. M.,“ Life-Cycle Costing in Municipal Construction Project,”Journal of Infrastructure Systems, ASCE, Vol. 2, No. 1, pp. 5-14, 1996.
5.Ayyub, B.M., and Halder, A.,“Project Scheduling Using Fuzzy Set Concepts,”Journal of the Construction Engineering and Management, ASCE, Vol. 110, No. 2, pp. 189-204, 1984.
6.Barrie, D. S. and Paulson, B. C., Professional Construction Management, McGraw-Hill, Inc., New York, 1992.
7.Chan, W. T., Chua, D. K. H., and Kannan, G.,“Construction Resource Scheduling With Genetic Algorithms,”Journal of Construction Engineering and Management, ASCE, Vol. 122, No. 2, pp. 125-131, 1996.
8.Charles, E. W.,“CII Model Plant Project 8/86,”Proceedings of Seventh Conference on Construction Productivity Improvement, pp. 11-15, 1986.
9.Cherneff, J., Logcher, R., and Sriram, D.,“Integrating CAD with Construction-Schedule Generation,”Journal of Computing in Civil Engineering, ASCE, Vol. 5, No. 1, pp. 64-84, 1991.
10.Cynwyd, B., Primavera Project Planner, Primavera system, Inc., 1996.
11.De La Garza, J. M. and Ibbs, C. W., “Knowledge Elicitation Study in Construction Scheduling Domain,” Journal of Computing in Civil Engineering, ASCE, Vol. 4, No. 2, pp. 135-153, 1990.
12.De La Garza, J. M., et al,“A Knowledge Engineering Approach to the Analysis and Evaluation of Schedules for Mid-Rise Construction,”Construction Engineering Research Laboratory Technical Report, P-90/70, IL, 1990.
13.De La Garza, J. M., Drew, D. R., and Chasey, A. D.,“Simulating Highway Infrastructure Management Policies,”Journal of Management in Engineering, ASCE, Vol. 14, No. 5, pp. 64-72, 1998.
14.Dzeng, R.J.,“CasePlan:A Case-Based Planner and Scheduler for Construction Using Product Modeling,”Ph. D. thesis, Dept. of Civil Engineering, University of Michigan, Mich, 1995.
15.Dzeng, R.J., and Tommelein I.D., “Boiler Erection Scheduling Using Product Models and Case-Based Reasoning,” Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 3, pp. 338-347, 1997.
16.Ganeshan, R., Grobler, F., Wang, C. E., and Coimbatore, V.,“CITYWORK:Application of Collaborative Technologies for Infrastructure Management,”Journal of Computing in Civil Engineering, ASCE, Vol. 15, No. 1, pp. 74-80, 2001.
17.Garvin, M. J., Wooldridge, S. C., Miller, J. B., and McGlynn, M. J.,“Capital Planning System Applied to Municipal Infrastructure,”Journal of Management in Engineering, ASCE, Vol. 16, No. 5, pp. 41-50, 2000.
18.Gharaibeh, N. G., Darter, M. I., and Uzarski, D. R.,“Development of Prototype Highway Asset Management System, ”Journal of Infrastructure Systems, ASCE, Vol. 5, No. 2, pp. 61-68, 1999.
19.Hajdu, M., Network Scheduling Techniques for Construction Project Management, Kluwer Academic Publishers, Boston, 1997.
20.Hapke, M. and Slowinski R.,“Fuzzy Priority Heuristics for Project Scheduling,”Fuzzy Sets and System, Vol. 83, No. 3, pp. 291-299, 1996.
21.Harris, R. B., Precedence and Arrow Networking Techniques for Construction, John Wiley & Sons, Inc., New York, 1978.
22.Hegazy, T. and Ayed, A.,“ Neural Network Model for Parametric Cost Estimation of Highway Projects,”Journal of Construction Engineering and Management, ASCE, Vol. 124, No. 3, pp. 210-218, 1998.
23.Hegazy, T., Shabeeb, A. K., Elbeltagi, E., and Cheema, T.,“Algorithm for Scheduling with Multiskilled Constrained Resources,”Journal of Construction Engineering and Management, ASCE, Vol. 126, No. 6, pp. 414-421, 2000.
24.Hendrickson, C., Zozaya-Gorostiza, C., Rehak, D., Baracco-Miller, E. and Lim, P.,“Expert system for construction Planning,”Journal of Computing in Civil Engineering, ASCE, Vol. 1, No. 4, pp. 253-269, 1987.
25.Hsieh, T. Y. and Liu, H. L.,“An Innovative Heuristic Approach for Solving Resource Scheduling Problems in Construction Projects,”Journal of the Chinese Institute of Civil and Hydraulic Engineering, Vol. 11, No. 2,pp. 419-427, 1999.
26.Institution of Civil Engineers,“Civil Engineering Standard Method of Measurement,” pp. 1-95, 1976.
27.Kartam, N. A. and Levitt, R. E.,“Intelligent Planning of Construction Project,”Journal of Computing in Civil Engineering, ASCE, Vol. 4, No. 2, pp. 155-176, 1990.
28.Kolodner, J., Case-Based Reasoning, Morgan Kaufmann, California, 1993.
29.Lee, H. S. and Yi, K. J., “Application of Mathematical Matrix to Integrate Project Schedule and Cost,”Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 5, pp. 339-346, 1999.
30.Leu, S. S. and Yang, C. H.,“A GA-based Multicriteria Optimal Model for Construction Process under Resource Constraints,”Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 6, pp. 420-427, 1999.
31.Lewis, J. P., Project Planning, Scheduling & Control, Probus Publishing Co., Chicago, 1991.
32.Li, S.,“New Approach for Optimization of Overall Construction Schedule,”Journal of Construction Engineering and Management, ASCE, Vol. 122, No. 1, pp. 7-13, 1996.
33.Lorterapong, P.,“A Fuzzy Heuristic Method for Resource-Constrained Project Scheduling,”Project Management Journal, Vol. xxv, No. 4, pp. 12-18, 1994.
34.Lorterapong, P. and Moselhi, O.,“ Project-Network Analysis Using Fuzzy Sets Theory,”Journal of Construction Engineering and Management, ASCE, Vol. 122, No. 4, pp. 308-317, 1996.
35.Lu, M. and AbouRizk, S. M.,“Simplified CPM/PERT Simulation Model,”Journal of Construction Engineering and Management, ASCE, Vol. 126, No. 3, pp. 219-226, 2000.
36.Maser, K. R.,“Inventory, Condition, and Performance Assessment in Infrastructure Facilities Management”Journal of Professional Issues in Engineering, ASCE, Vol. 114, No. 3, pp.271-281, 1988.
37.Mezher, T., Abdul-Malak, M. A., and Dayya, M.,“Decision Support System For Managing Infrastructure Telecommunications Projects,”Journal of Management in Engineering, ASCE, Vol. 15, No. 1, pp. 74-81, 1999.
38.Microsoft, Microsoft Project 2000 Manual, One Microsoft Way Redmond, WA 98052-6399, 2000.
39.Miller, J. B.,“ Engineering Systems Integration for Civil Infrastructure Projects,”Journal of Management in Engineering, ASCE, Vol. 13, No. 5, pp. 61-69, 1997.
40.Miller, J. B., Garvin, M. J., Ibbs C. W., and Mahoney S. E.,“Toward a New Paradigm:Simultaneous Use of Multiple Project Delivery Methods,”Journal of Management in Engineering, ASCE, Vol. 16, No. 3, pp. 58-67, 2000.
41.Morad, A. A. and Beliveau, Y. J.,“Knowledge-Based Planning System,”Journal of Construction Engineering and Management, Vol. 117, No. 1, pp. 1-12, 1991.
42.Morris, P. W. G., The Management of Projects, Thomas Telford, London, 1997.
43.Navinchandra, D., Sriram, D. and Logcher, R.,“GHOST:Project Network Generator,”Journal of Computing in Civil Engineering, ASCE, Vol. 2, No. 3, pp. 239-254, 1988.
44.Otto, S. and Ariaratnam, S. T.,“ Guidelines for Developing Performance Measures in Highway Maintenance Operations,”Journal of Transportation Engineering, ASCE, Vol. 125, No. 1, pp. 46-54, 1999.
45.Parker, C. S., Understanding Computers Today & Tomorrow, The Dryden Press, Orlando, pp. IS42-IS43, 1998.
46.Patterson, J. H., Talbot, F. B., Slowinski, R., and Weglarz, J.,“Computation Experience with A Backtracking Algorithm for Solving A General Class of Precedence and Resource-Constrained Scheduling Problems,” European Journal of Operational Research, Vol. 49, No. 1, pp. 68-79, 1990.
47.Peña-Mora, F. and Tamaki, T.,“Effect of Delivery Systems on Collaborative Negotiations for Large-Scale Infrastructure Projects,”Journal of Management in Engineering, ASCE, Vol. 17, No. 2, pp. 105-121, 2001.
48.Popescu, C. M. and Charoenngam C., Project Scheduling and Control in Construction, John Wiley & Sons, New York, 1995.
49.Rasdorf, W. J. and Abudayyeh, O. Y.,“Cost- and Schedule-Control Integration:Issues and Needs,”Journal of Construction Engineering and Management, ASCE, Vol. 117, No. 3, pp. 486-502, 1991.
50.Senouci, A. B. and Adeli, H.,“ Resource Scheduling Using Neural Dynamics Model of Adeli and Park,”Journal of Construction Engineering and Management, ASCE, Vol. 127, No. 1, pp. 28-34, 2001.
51.Shaked, O. and Warszawski, A.,“CONSCHED:Expert System for Scheduling of Modular Construction Projects,”Journal of Construction Engineering and Management, ASCE, Vol. 118, No. 3, pp. 488-506, 1992.
52.Shaked, O. and Warszawski, A.,“Knowledge-Based System for Construction Planning of High-Rise Buildings,”Journal of Construction Engineering and Management, ASCE, Vol. 121, No. 2, pp. 172-182, 1995.
53.Shtub, A. and Raz, T.,“Optimal Segmentation of Projects-Scheduling and Cost Considerations,”European Journal of Operational Research, Vol. 95, No. 2, pp. 278-283, 1996.
54.Smith, B. L., Miller, J. S., Revels, B. M., and Smith, K. W.,“Planning for Civil Engineering Applications of Information Technology,” Journal of Management in Engineering, ASCE, Vol. 17, No. 2, pp. 95-104, 2001.
55.Steiner, R. S.,“Dade County Rapid Transit:Management Scheduling Techniques,”Journal of the Technical Councils of ASCE, ASCE, Vol. 108, No. TC1, pp. 150-158, 1982.
56.Tavares, L. V.,“A Multi-stage Non-deterministic Model for Project Scheduling under Resources Constraints,”European Journal of Operational Research, Vol. 49, No. 1, pp. 92-101, 1990.
57.The Construction Specifications Institute, “Masterformat,” pp. 1-13, 1983.
58.The Construction Specifications Institute,“Masterformat Master List of Section Titles and Numbers,” 1984.
59.The Welcome co. , Open Plan Professional Manual, 15990 North Barkers Landing Road Suite 350 Houston, TX 77079, 1997.
60.Van Slyke, R. M.,“ Monte Carlo method and the PERT problem,”Operations Research, Vol. 11, No. 5, pp. 839-860, 1963.
61.Wang, C. H. and Huang, Y. C.,“ Optimization Model for Construction Project Duration Using Multistage Decision Process,”Journal of Engineering Optimization, Vol. 30, pp. 155-173, NSC 83-0410-E011-035, 1998.
62.Wang, W. C. and Demsetz, L. A.,“ Model for Evaluating Networks under Correlated Uncertainty─NETCOR,”Journal of Construction Engineering and Management, ASCE, Vol. 126, No. 6, pp. 458-466, 2000.
63.Wang, W. C. and Demsetz, L. A.,“ Application Example for Evaluating Networks Considering Correlation,”Journal of Construction Engineering and Management, ASCE, Vol. 126, No. 6, pp. 467-474, 2000.
64.Wooldridge, S. C., Garvin, M. J., and Miller, J. B.,“Effects of Accounting and Budgeting on Capital Allocation for Infrastructure Projects,”Journal of Management in Engineering, ASCE, Vol. 17, No. 2, pp. 86-94, 2001.
65.Zozaya-Gorostiza, C., Hendrickson, C., and Rehak, D. R., Knowledge-Based Process Planning for Construction and Manufacturing, Academic Press, Boston, MA, 1989.
66.王添才,「承商進度網圖提送之探討」,現代營建,笫十二卷,笫一四o期,笫60-62頁,1991。
67.王慶煌,「編碼原則之整合評估與推廣運用」,台灣科技大學,內政部建築研究所研究報告,台北,1992。
68.王慶煌、吳旻謙,「以多階段遞迴建立重複性工程排程規劃模式」,中國土木水利工程學刊,第十卷,第一期,第17-30頁,1998。69.王慶煌、吳旻謙、黃裕鈞,「高層鋼構建築最佳排程規劃之初步研究」,中華民國第一屆營建管理學術研討會論文集,第Ⅱ67-Ⅱ74頁,台北,1999。
70.行政院公共工程委員會網站,http://www.pcc.gov.tw/,2001。
71.交通部台灣區國道新建工程局,中華民國八十九年國道新建工程年刊,台北,2001。
72.交通部台灣區國道新建工程局,隧道工程施工技術規範,台北,1993。
73.交通部台灣區國道新建工程局,國道工程施工前講習教材彙編,台北,1996。
74.交通部台灣區國道新建工程局,施工標準規範:施工技術規範,台北,1996。
75.交通部台灣區國道新建工程局,橋梁工程施工實務訓練(第二版),台北,1997。
76.交通部台灣區國道新建工程局,施工標準規範:一般規範,台北,1997。
77.交通部台灣區國道新建工程局,現場監工作業基礎訓練,台北,1997。
78.交通部台灣區國道新建工程局,工程合約管理手冊,台北,1998。
79.交通部台灣區國道新建工程局網站,http://www.taneeb.gov.tw/,2001。
80.余文德、范振成,「公共工程業主最有利排程之探討」,營建管理季刊,第46期,第50-59頁,2001。81.李欣運,「工程進度規劃自動評核與建議系統架構之研究」,碩士論文,國立交通大學土木工程研究所,新竹,1999。82.林威延、曾惠斌,「專家系統與網際網路於營建專案進度排程之應用」,中華民國第一屆營建管理學術研討會論文集,第Ⅱ59-Ⅱ66頁,台北,1999。
83.林清泉等,建築工程工料分析基準之編訂,內政部建築研究所籌備處,台北,1989。
84.周敏雄、覃經科,「施工網圖之審查」,中興工程季刊,笫六十三期,笫105-112頁,1999。85.姚乃嘉、楊智斌,「階層式作業項目分解圖於公路工程建設管理之應用」,中工高雄會刊,第2卷,第4期,1993。
86.郭斯傑、李岳能,「降雨因素影響下之工期預測」,中國土木水利工程學刊,第十卷,第四期,第743-751頁,1998。87.陳敬寬,「工程計畫施工進度管理系統之研究」,碩士論文,國立交通大學交通運輸研究所,新竹,1991。88.陳素娥,「工程管理編碼系統之研究」,碩士論文,台灣科技大學營建工程研究所,台北,1989。
89.黃台生,「建立公共工程合理化期程之研究─公路工程部份」,國立交通大學,行政院公共工程委員會研究報告,台北,1998。
90.黃榮堯,「線性工程資源規劃─POLO系統」,中華民國第一屆營建管理學術研討會論文集,第Ⅱ1-Ⅱ8頁,台北,1999。
91.葉怡成、黃文孝,「以遺傳演算法解資源限制排程最佳化問題之研究」,中華民國第一屆營建管理學術研討會論文集,第Ⅱ9-Ⅱ16頁,台北,1999。
92.董其鈞,「案例式推理應用於營建工程爭議調解之研究」,碩士論文,國立交通大學土木工程研究所,新竹,2000。93.曾仁杰,「國道工程施工網圖模組建立之研究」,國立交通大學,交通部國道新建工程局建教合作研究案成果報告,台北,1998。
94.曾仁杰,「國道工程施工網圖模組建立之研究(二)」,國立交通大學,交通部國道新建工程局建教合作研究案成果報告,台北,2000。
95.曾仁杰、張敬廉、張書萍,「NBA系統使用手冊」,國立交通大學土木工程研究所營建工程與管理組,新竹,2000。
96.孫國勛、李崇德,「經驗導向施工排程之注意事項及簡易重疊施工規劃(上)」,現代營建,第二十一卷,第250期,笫51-58頁,2000。97.孫國勛、李崇德,「經驗導向施工排程之注意事項及簡易重疊施工規劃(下)」,現代營建,第二十一卷,第251期,笫37-43頁,2000。98.廖國禎,「e-世代營建管理資訊系統在計畫上的應用」,營建管理季刊,第45期,第17-27頁,2000。99.魯李威,「網圖審查心得(上)」,現代營建,笫十四卷,笫一六四期,笫37-44頁,1993。
100.魯李威,「網圖審查心得(下)」,現代營建,笫十四卷,笫一六五期,笫39-46頁,1993。
101.劉福勳,實用工程進度規劃與控制,漢天下工程管理顧問公司,新竹,1996。
102.劉福勳、張皓傑、黃耀德,「PDA在工地使用之優缺點」,營建管理季刊,第46期,第60-62頁,2001。103.謝清俊,「網圖模組應用於營建工程進度管理之研究」,碩士論文,國立交通大學土木工程研究所,新竹,1998。
104.蕭定國,「Primavera Systems 在營建工程管理上之應用」,營建中心,第45-51頁,台北,1986。