參考文獻
1.Anderson, M. T., B. S. Greenberg and S. L. Stokes,” Acceptance Sampling With Rectification When Inspection Errors Are Present,” Journal of Quality Technology, Vol. 33, No. 4, pp.493-505, 2001.
2.Barlow, R. E. and X. Zhang,” A Critique of Deming’s Discussion of Acceptance Sampling Procedure,” In: A.P. Basu, Ed., Reliability and Quality and Control, North-Holland, Amsterdam, pp21-32, 1986.
3.Barlow, R. E. and X. Zhang,” Bayesian Analysis of Inspection Sampling Procedures Discussed by Deming,” Journal of Statistical Planning and Inference, Vol.16, North-Holland, 1987.
4.Burke, R. J., D.D. Hobert and F.C. Kaminsky,” The (k1, k2) game,” Quality Progress, Vol. 26, No. 2, pp.49-53, 1993..
5.Hillson. David(2005年,12月)決策樹, http://www.risk-doctor.com/pdf-briefings/risk-doctor18c.pdf
6.Kaminsky F. C. and Haberle K. R.” Probability Distributions for the Deming Cost Models,” Journal of Quality Technology, Vol. 27, No. 4, pp.355-362, 1995.
7.Kirkwood. C.W, “An Algebraic Approach to Formulating and Solving Large Models for Sequential Decisions under Uncertainty,” Management Science, 39:900-914, July 1993。
8.Lam, Y. and C. V. Lam,” Bayesian double-sampling plans with normal distributions,” The Statistician, Vol. 46, No. 2, pp.193-207, 1997.
9.Lorenzen, T. J.,“ Minimum Cost Sampling Plan Using Bayesian Methods,” Naval Research Logistics Quarterly, Vol. 32, No. 1, pp.57-69, 1985.
10.Moskowitz, H. and K. Tang,” Bayesian Variables Acceptance- Sampling Plans: Quadratic Loss Function and Step-Loss Function,” Technometrics, Vol. 34, No. 3, 340-347, 1992 pp.
11.Papadakis, E. P.,” The Deming Inspection Criterion for Choosing Zero or 100 Percent Inspection,” Journal of Quality Technology, Vol. 17, No. 3, pp.121-127, 1985.
12.Rigdon, S. E.,” Mood’s Theorem, Deming’s kp Rule, and The Death of Acceptance Sampling,” Quality Engineering, Vol. 8, No. 1, pp.129-136, 1995
13.Schnoy P.P., “A Comparison of graphical Techniques for Decision Analysis ,” European Journal of Operational Research,78: 1-21, Oct.13, 1994.
14.Sheil, J.,” Towards economically optimal first-off inspection,” European Journal of Operational Research, Vol. 94, pp.179-185, 1996.
15.Vander Wiel, S. A. and S. B. Vardeman,” A Discussion of All-or-None Inspection Policies,” Technometrics, Vol. 36, No. 1, pp.102-109, 1994
16.林鴻欽,「貝氏檢驗計劃之設計」,元智大學工業工程研究所碩士論文,1992 年6 月。17.林世偉,「不可修復產品原料供應商之選擇─貝氏決策模式」,元智大學工業工程研究所碩士論文,1998 年6 月。18.邵嘉瑀,「變異數不確定下計量型戴明抽樣檢驗模式之貝氏分析」,元智大學工業工程研究所碩士論文,2002年6月。19.劉采筠,「集體決策在經驗貝氏抽樣檢驗計畫之應用」。真理大學數理科學研究所碩士論文,2002年6月。20.陳慧雯,「貝氏方法應用於計量型戴明檢驗模式」,元智大學工業工程研究所碩士論文,2003年6月。21.黃乾怡,「電子產品可靠度預估與逐次抽樣計畫─以數位相機為例」,華梵大學工業管理學系碩士論文,2004年6月。
22.黃珮菁,「模糊理論在單次抽樣檢驗計畫之應用」,國立成功大學統計學系碩士論文,2005年6月。23.李慶豐(2003年)彩色率光片產業概況http://lin-li.elo.com.tw/product-6.htm