|
[1] T.K.Liu, “Application of Multi-objective Genetic Algorithms to Control System Design ”, Doctorial Thesis in Tohoku University.[2] Kyung-Mi Lee and Takeshi Yamakawa, 1998, ”A Genetic Algorithm for General Machine Scheduling Problems”, School of Computer Science and System Engineering, Kyushu Institute of Technology , IEEE.[3] Tsujimura, Y.; Mafune, Y.; Gen, M., 2001, “Effects of symbiotic evolution in genetic algorithms for job-shop scheduling ” , System Sciences , Proceedings of the 34th Annual Hawaii International Conference on.[4] Guoyong Shi, 1997, “A Genetic Algorithm Applied to a Classic Job-shop Scheduling Problem “, International Journal of Systems Science, Vol.28, No.1, pp25-32.[5] Lee, C.Y. , Piramuthu,S. and Tsai,Y.K., 1997, “Job shop Scheduling with a genetic algorithm and machine learning“, International Journal of Production Research, 35 (4), pp.1171-1191.[6] D.R.Sule, 1996, Industrial Scheduling, PWS Publishing Company, pp149~185.[7] Lawton ,G., 1992, ”Genetic Algorithm for Schedule Optimization”, AI Expert, Vol.17, No.5, pp23-27.[8] Srinivas, M. and L.M. Patnaik, 1994, Genetic Algorithm: A Survey , IEEE Computer, June, pp.17-26.[9] Carlos M.Fonseca and Peter J.Fleming , “Genetic Algorithms for Multiobjective Optimization:Formulation,Discussion and Generalization” , Automatic Control and Systems Eng., pp.416-423.[10] Conway , R.W.,W.L.,and L.Miller, 1967, Theory of Scheduling, Addison-Wesley, Reading, MA.[11] Muth, J.F., and G.L. Thompson, 1963, Industrial Scheduling, Prentice Hall, Englewood Cliffs, NJ.[12] GouYong Shi, 1997, “A genetic algorithm applied to classic job-shop scheduling problem”, International Journal of System Science.[13] Mitsuo Gen, Runwei Cheng, 1997, Genetic algorithms and engineering design, Wiley, New York.[14] 林我聰,83年,現場排程專家系統,台北:資訊與電腦叢書。[15] 周明、孫樹棟,遺傳算法原理及應用,北京:國防工業出版社。[16] 周至宏,品質工程,國立高雄第一科技大學機械與自動化系。[17] 劉庭瑋、何信瑩,2002,”使用智慧型基因演算法設計太空大型結構控制器”,中華民國自動控制研討會,國立成功大學,p1461~p1466。[18] 劉修任、楊憲東,2000,“結合基因演算法與田口實驗法於飛行控制設計”,中國航空太空學會學刊,32卷,3期,頁223~236。[19] 張孝德、蘇木春,86年12月,機器學習類神經網路、模糊系統及基因演算法則,9-1,90年7月,全華科技圖書股份有限公司。[20] 專案管理99風雲榜,http://project.engineer.com.tw/[21] 洪茂森,2002,應用類神經網路於零工式生產排程之研究,國立高雄第一科技大學,碩士論文。[22] K. R. Baker, 1984, “Sequencind Rules and Due-Date Assignments in a Job Shop”, Management Sciences 30, 9, pp. 1093-1104.[23] J. H. Blackstone, Jr., D. T. Phillips, G. L. Hogg, 1982, “A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations”, International Journal of Production Research 20, 1, pp.27-45.[24] A. S. Kiran, M. L. Smith, 1984, “Simulation Studies in Job Shop Scheduling - A Survey”, Computers and Industrial Engineering 8, 2, pp.87-93.[25] A. S. Kiran, M. L. Smith, 1984, “Simulation Studies in Job Shop Scheduling - Performance of Priority Rules”, Computers and Industrial Engineering 8, 2, pp.95-105.[26] S. S. Panwalkar, W. Iskander, 1977, “A Survey of Scheduling Rules”, Operations Research 25, 1, pp.45-61.[27] Yang, S.; Dingwei Wang, March 2000, “Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling”, Neural Networks, IEEE Transactions on , Vol.11, Issue: 2, pp.474 -486.[28] Chuan Yu Chang; Mu Der Jeng, 1995, “A neural network model for the job-shop scheduling problem with the consideration of lot sizes”, Robotics and Automation. Proceedings., IEEE International Conference on , Vol.1 , pp.202 -207.[29] Guohua Wan; Yen, P.-C. , 1999, “A fuzzy logic system for dynamic job shop scheduling” ,Systems, Man, and Cybernetics, IEEE SMC ''99 Conference Proceedings. IEEE International Conference on , Vol. 4, pp.546 —551.[30] H. Fisher and G. Thompson, 1963, Industrial Scheduling, J. Muth and G. Thompson eds., Prentice-Hall, pp.1225-1251.[31] Chou J. H., Liao, W. H., and Li, J. J., 1998, “Application of Taguchi-Genetic Method to Design Optimal Gray-Fuzzy Controller of a Constant Turing Force System”, 第十五屆機械工程研討會控制與自動化組論文集, pp.31-38.
|