|
1.Awi, F. and Michal, T., 1991, “A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in O(n log n) or O(n) time”, Management Science, Vol. 31, No. 8, pp. 909-925. 2.Blackburn, J. D. and Millen, R. A., 1982, “Improved Heuristics for Multi-Stage Requirements Planning Systems”, Management Science, Vol. 28, pp. 44-56. 3.Bookbinder, J. H. and Koch, L. A., 1990, “Production Planning for Mixed Assembly Systems”, Journal of Operations Management, Vol. 9, pp. 7-23. 4.Cevriye, G., Serpil, E., and Yalcin, E., 1999, “A Decision Network Algorithm for Multistage Dynamic Lot Sizing Problems”, International Journal of production economics, Vol. 62, No. 3, pp. 281-285. 5.Chan, G. H., Xia, Z. H. and Choo, E. U., 1999, “The Critical Cut-Off Value Approach for Dynamic Lot Sizing Problems with Time Varying Cost Parameters”, Computers and Operations Research, Vol. 26, No. 2, pp. 179-188. 6.Charles, R. S., 1997, “Dynamic Lot Sizing with Random Demand and Non-Stationary Costs”, Operation Research Letters, Vol. 20, No. 4, pp. 155-164. 7.Chung, K. J. and Chyr, F. C., 1997, “From Wagner-Whitin’s Dynamic Lot Size Model towards Zero Inventory”, Production Planning and Control, Vol. 8, No. 7, pp. 670-677. 8.Chopra, S. and Peter M., 2001, Supply Chain Management-Strategy, Planning and Operation, Prentice-Hall, USA. 9.Chyr, F. C., 1990, “A New Approach to the Dynamic Lot Size Model”, International Journal of Engineering Costs and Production Economic, Vol. 20, pp. 255-263. 10.Coleman, B. J., Saydam, C. and Mcknew, M. A., 1991, “An Efficient Zero-One Formulation of the Multilevel Lot-Sizing Problem”, Decision Science, Vol. 22, pp. 280-295. 11.Crowston, W. B. and Wagner, H. M., 1973, “Dynamic Lot Size Models for Multi-Stage Assembly Systems”, Management Science, Vol. 20, pp. 14-21. 12.Dellaert, N. and Jeunet, J., 1998, A Genetic Algorithm to Solve Multilevel Lot-sizing Problems in MRP, Report 9808, Econometric Institute, Erasmus University of Michigan. 13.Dellaert, N. and Jeunet, J., 2000, “Solving Large Unconstrained Multilevel Lot-Sizing Problems Using a Hybrid Genetic Algorithm”, International Journal of Production and Research, Vol. 38, No. 5, pp. 1083-1099. 14.Denize, A., Kemal, A. and Suresh, C., 2003, “The Single-Item Lot-Sizing Problem with Immediate Lost Sales”, European Journal of Operation Research, Vol. 147, pp. 558-566. 15.Evans, J. R., 1985, “An Efficient Implementation of the Wagner-Whitin Algorithm for Dynamic Lot-Sizing”, Journal of Operations Management, Vol. 5, pp. 229-235. 16.Fordyce, J. M. and Webster, F. M., 1984, “The Wagner-Whitin Algorithm Made Simple”, Production and Inventory Management, Vol. 25, No. 2, pp. 21-30. 17.Garey, M. and Johnson, D., 1978, Computers, Complexity and Intractability: A Guide to Theory of NP-Completeness, W. H. Freeman, San Francisco. 18.Goffin, K., Szwejczewski, M. and New, C., 1997, “Managing Suppliers: When Fewer Can Mean More”, International Journal of Physical Distribution and Logistics Management, Vol. 27, No. 7, pp. 422-436. 19.Hall, J., 1991, “Distribution Function is Now, Supply Chain Integrator”, Industrial Engineering, Sep., pp 18-19. 20.Handfield C. M. and Nichols, E. L., 1999, Introduction to Supply Chain Management, Prentice-Hall, USA. 21.Harris, F. W., 1915, Operations and Cost Factory Management Series, A. W. Shaw Co., Chicago, pp. 48-52. 22.Heinrich, K., 1997, “A Dynamic Lot Sizing Model with Exponential Machine Breakdown”, European Journal of Operation Research, Vol. 100, pp. 514-536. 23.Hicks, D. A., 1996, “Enterprise Solutions: Back on the Supply Chain”, IIE Solutions, Vol. 28, No. 1, pp. 25-28. 24.Jizesf, V., 1995, “Setup Cost Stability Region for the Multi-Level Dynamic Lot Sizing Problem”, European Journal of Operation Research, Vol. 87, pp. 132-141. 25.Orlicky, J., 1975, Material Requirement Planning, McGraw-Hill, New York. 26.Pakath, R. and Zaveri, J. S., 1995, “Specifying Critical Inputs in a Genetic Algorithm-driven Decision Support System: An Automated Facility”, Decision Sciences, Vol. 26, pp. 749-779. 27.Seliver, E. A. and Meal, H. C., 1973, “A Heuristic for Selecting Lot Size Quantities for the Case of a Deterministic Time-Varying Demand Rate and Discrete Opportunistic for Replenishment”, Production and Inventory Management, Vol. 14, No. 1, pp 64-74. 28.Steinberg, E. and Napier, H. A., 1980, “Optional Multilevel Lot Sizing for Requirements Planning Systems”, Management Science, Vol. 26, pp. 1258-1271. 29.Stevenson, William J., 2002, Operations Management, McGraw-Hill, New York. 30.Tan, K. C., Kannan, V. J., Handfield, R. B. and Ghosh S., 1999, “Supply Chain Management: An Empirical Study of It’s Impact on Performance”, International Journal of Operation and Production Management, Vol. 19, No. 19, pp. 1034-1052. 31.Thomas, I. and Heinz, G., 1997, “Feasible Sequential Decision and a Flexible Lag Range an-based Heuristic for Dynamic Multi-Level Lot Sizing”, International Transactions in Operational Research, Vol. 4, pp. 327-340. 32.Verwijmeren, M., 1996, “Material Supply Chain Management”, International Journal of Physical Distribution & Logistics Management, Vol. 26, No. 6, pp. 16-31. 33.Wagner, H. M. and Whitin, T. M., 1958, “Dynamic Version of the Economic Lot Size Model”, Management Science, Vol. 5, No. 1, pp. 89-96. 34.Yelle, L. E., 1979, “Material Requirements Lot Sizing: A Multilevel Approach”, International Journal of Production Research, Vol. 17, pp. 223-232. 35.Zangwill, W. I., 1968, “Minimum Concave Cost Flows in Certain Networks”, Management Science, No. 14, pp. 429-450. 36.Zangwill, W. I., 1969, “A Backlogging Model and a Multi-Echelon Model of A Dynamic Lot Size Production System-A Network Approach”, Management Science, Vol. 15, pp. 506-527.
|