|
Due to the deficit of electric energy in Taiwan, the cogeneration systemis becoming more popular among industries which require electric energy supply with high reliability. The problem associated the use of cogeneration systems have been received much attention by the power engineer. This main purpose of this thesis is to study the load-shedding scheme forcogeneration systtems by performing system load-shedding scheme employs the underfrequency relay for limiting system overload as well as the overcurrent relay for tripping the tie- line between the cogeneration plant and the utilitysystem are demonstrated to verify the validity of the proposed load- shedding scheme.
|