|
[1]Ge, H. W., Sun, L., Liang, Y. C., & Qian, F. (2008). An effective PSO and AIS-based hybrid intelligent algorithm for job-shop scheduling. IEEE Transactions on Systems, Man and Cybernetics, Part A, 38, 358–368. [2]Lian, Z., Gu, X., & Jiao, B. (2006). A dual similar particle swarm optimization algorithm for job-shop scheduling with penalty. In Proceedings of the sixth world congress on intelligent control and automation (Vol. 2, pp. 7312–7316). [3]Ge, H., Du, W., & Qian, F. (2007). A hybrid algorithm based on particle swarm optimization and simulated annealing for job shop scheduling. In Proceedings of the third international conference on natural computation (Vol. 3, pp. 715–719). [4]Tsung-Lieh Lin, Shi-Jinn Horng, Tzong-Wann Kao, Yuan-Hsin Chen, Ray-Shine Run, Rong-Jian Chen, Jui-Lin Lai, I-Hong Kuo, An efficient job-shop scheduling algorithm based on particle swarm optimization, Expert Systems with Applications, Volume 37, Issue 3, 15 March 2010, Pages 2629-2636 [5]Nowicki E, Smutnicki C. A fast tabu search algorithm for the job shop problem. Management Science 1996;42:797–813. [6]Nowicki, E., & Smutnicki, C. (2005). An advanced tabu search algorithm for the job shop problem. Journal of Scheduling, 8, 145–159. [7]Ponnambalam, S. G., Aravindan, P., & Rajesh, S. V. (2000). A tabu search algorithm for job shop scheduling. The International Journal of Advanced Manufacturing Technology, 16, 765–771. [8]Goncalves, J. F., Mendes, J. J. D. M., & Resende, M. G. C. (2005). A hybrid genetic algorithm for the job shop scheduling problem. European Journal of Operational Research, 167, 77–95. [9]Watanabe, M., Ida, K., & Gen, M. (2005). A genetic algorithm with modified crossover operator and search area adaptation for the job-shop scheduling problem. Computers and Industrial Engineering, 48, 743–752. [10]Park, B. J., Choi, H. R., & Kim, H. S. (2003). A hybrid genetic algorithm for the job shop scheduling problems. Computers and Industrial Engineering, 45, 597–613. [11]Wang, L., & Zheng, D. Z. (2001). An effective hybrid optimization strategy for jobshop scheduling problems. Computers and Operations Research, 28, 585–596. [12]Van Laarhoven, P. J. M., Aarts, E. H. L., & Lenstra, J. K. (1992). Job shop scheduling by simulated annealing. Operaons Research, 40(1), 113–125. [13]Suresh, R. K., & Mohanasundaram, K. M. (2005). Pareto archived simulated annealing for job shop scheduling with multiple objectives. The International Journal of Advanced Manufacturing Technology, 29, 184–196. [14]Udomsakdigool, A., & Kachitvichyanukul, V. (2008). Multiple colony ant algorithm for job-shop scheduling problem. International Journal of Production Research, 46, 4155–4175. [15]Zhou, P., Li, X. P., & Zhang, H. F. (2004). An ant colony algorithm for job shop scheduling problem. In Proceedings of the fifth world congress on intelligent control and automation (Vol. 4, pp. 2899–2903). [16]Pinedo, M. (2008). Scheduling: Theory, Algorithm, and System. Third Ed., Englewood Cliffs, NJ: Prentice-Hall. [17]Xin-She Yang, (2008). Nature-Inspired Metaheuristic Algorithms. First Ed., Frome, UK: Luniver Press. [18]D. T. Pham, Ghanbarzadeh A., Koc E., Otri S., Rahim S., and M.Zaidi "The Bees Algorithm - A Novel Tool for Complex Optimisation Problems"", Proceedings of IPROMS 2006 Conference, pp.454-461 [19]Kuo, I. H., Horng, S. J., Kao, T. W., Lin, T. L., Lee, C. L., Terano, T., et al. (2009). An efficient flow-shop scheduling algorithm based on a hybrid particle swarm optimization model. Expert Systems with Applications, 36, 7027–7032. [20]Liao, C. J., Tseng, C. T., & Luarn, P. (2007). A discrete version of particle swarm optimization for flowshop scheduling problems. Computers and Operations Research, 34, 3099–3111. [21]Van Laarhoven, P.J.M., E.H.L. Aarts, and J.K. Lenstra. (1988). “Job Shop Scheduling by Simulated Annealing.” Report OS-R8809, Centrum voor Wiskunde en Informatica, Amsterdam. [22]Van Laarhooven, P.J.M., E.H.L. Aarts, and J.K. Lenstra. (1992). “Job Shop Scheduling by Simulated Annealing.” Operations Research 40(1), 113–125. [23]Jain, A. S., Rangaswamy, B., and Meeran, S. 2000. New and “Stronger” Job-Shop Neighbourhoods: A Focus on the Method of Nowicki and Smutnicki (1996). Journal of Heuristics 6, 4 (Sep. 2000), 457-480. [24]Glover F. Tabu search (Part I). ORSA Journal on Computing 1989; 1:190–206. [25]Glover F. Tabu search (Part II). ORSA Journal on Computing 1990; 2:4–32. [26]Lawrence S. Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques (Supplement). Pittsburgh, PA: Graduate School of Industrial Administration, Carnegie Mellon University; 1984. [27]A Eswaramurthy V. P., A Tamilarasi A. (2009). Hybridization of Ant Colony Optimization Strategies in Tabu Search for Solving Job Shop Scheduling Problems. International Journal of Information and Management Sciences 20 (2009), 173-189 [28]C. Zhang, Y. Rao, P. Li. (2008). An effective hybrid genetic algorithm for the job shop scheduling problem. The International Journal of Advanced Manufacturing Technology, 9, 965-974. [29]V. P. Eswaramurthy, A. Tamilarasi. (2009) Hybridizing tabu search with ant colony optimization for solving job shop scheduling problems. The International Journal of Advanced Manufacturing Technology, 9, 1004-1015. [30]Fisher H, Thompson GL. Probabilistic learning combinations of local job-shop scheduling rules. In: Muth JM, Thompson GL, editors. Industrial scheduling. Englewood Cliffs, NJ, Chichester, UK: Prentice-Hill; 1963. [31]Lawrence S. Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques (Supplement). Pittsburgh, PA: Graduate School of Industrial Administration, Carnegie Mellon University; 1984. [32]Adams, J., Balas, E. and Zawack., D. (1988). The shifting bottleneck procedure for job shop scheduling, Management Science, Vol. 34, pp. 391-401. [33]Applegate D, Cook W. A computational study of the job-shop scheduling problem. ORSA Journal on Computing 1991;3:149–56. [34]T. Yamada, R. Nakano, A genetic algorithm applicable to large-scale job shop problems, in: R. Manner, B. Manderick (Eds.), Parallel Problem Solving from Nature 2, North-Holland, Amsterdam, 1992, 281–290 [35]Hajri S, Liouane N, Hammadi S, Borne P., A controlled genetic algorithm by fuzzy logic and belief functions for job-shop scheduling, IEEE Trans Syst Man Cybern B Cybern. 2000;30(5):812-8.
|