[1]S. Chen and X. Zhang, "An analytic review of earned value management studies in the construction industry," in Construction Research Congress, 2012, vol. 2012, p. 236. [2]M. P. Aneta Ziolkowska, "Application of The EVM Method and Its Extensions in The Implementation of Construction Objects," Engineering Structures and Technologies, vol. 7, no. 4, pp. 189-196, 2016. [3]C. M. Alvarado, R. P. Silverman, and D. S. Wilson, "Assessing the performance of construction projects: Implementing earned value management at the General Services Administration," Journal of Facilities Management, vol. 3, no. 1, pp. 92-105, 2005. [4]M. Lawrence and J. Acai, "An Assessment of the Factors Causing Delays on Building Construction," International Journal of Construction Engineering and Management, vol. 3, no. 1, pp. 13-23, 2014. [5]A. Gelman, J. B. Carlin, S. H. S., and D. B. Rubin, Bayesian data analysis. Boca Raton, FL: Chapman & Hall/CRC, 2003. [6]T. Narbaev and A. De Marco, "Combination of growth model and earned schedule to forecast project cost at completion," Journal of Construction Engineering and Management, vol. 140, no. 1, pp. 1-10, 2013. [7]B.-C. Kim and K. F. Reinschmidt, "Combination of project cost forecasts in earned value management," Journal of Construction Engineering and Management, vol. 137, no. 11, pp. 958-966, 2011. [8]S. Vandevoorde and M. Vanhoucke, "A comparison of different project duration forecasting methods using earned value metrics," International journal of project management, vol. 24, no. 4, pp. 289-302, 2006. [9]J. Batselier and M. Vanhoucke, "Construction and evaluation framework for a real-life project database," International Journal of Project Management, vol. 33, no. 3, pp. 697-710, 2015. [10]K. Krippendorff, Content Analysis: An Introduction to Its Methodology. Pensylvania, USA: Sage Publications Ltd., 2004. [11]J. Colin and M. Vanhoucke, "Developing a framework for statistical process control approaches in project management," International Journal of Project Management, vol. 33, no. 6, pp. 1289-1300, 2015. [12]B.-C. Kim, "Dynamic control thresholds for consistent earned value analysis and reliable early warning," Journal of Management in Engineering, vol. 31, no. 5, pp. 1-9, 2014. [13]R. Magnaye, B. Sauser, P. Patanakul, D. Nowicki, and W. Randall, "Earned readiness management for scheduling, monitoring and evaluating the development of complex product systems," International Journal of Project Management, vol. 32, no. 7, pp. 1246-1259, 2014. [14]P. Ballesteros-Pérez, E. Sanz-Ablanedo, D. Mora-Melià, M. C. González-Cruz, J. Fuentes-Bargues, and E. Pellicer, "Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects," Automation in Construction, vol. 103, pp. 279-290, 2019. [15]T. Narbaev and A. De Marco, "An earned schedule-based regression model to improve cost estimate at completion," International Journal of Project Management, vol. 32, no. 6, pp. 1007-1018, 2014. [16]L. Song, Earned Value Management: A Global and Cross-Industry Perspective on Current EVM Practice. Newtown Suqare, Pennsylvania, USA: Project Management Institute, Inc., 2010. [17]W. Abba, "Earned Value Management: Reconciling Government and Commercial Practices," Program Manager, pp. 58-63, 1997. [18]C. l. J. Christensen-Day, "Earned Value on Fixed-Price Projects," AACE International Transactions, vol. 2, no. 2, pp. 1-12, 2010. [19]F. T. Anbari, "Earned Value Project Management Method and Extensions," Journal of Project Management, vol. 34, no. 4, pp. 12-23, 2003. [20]Q. W. Fleming and J. M. Koppelman, "Earned Value Project Management: A Powerful Tool for Software Projects," The Journal of Defense Software Engineering, pp. 19-23, 1998. [21]H. L. Chen, W. T. Chen, and Y. L. Lin, "Earned value project management: Improving the predictive power of planned value," International Journal of Project Management, vol. 34, no. 1, pp. 22-29, 2016. [22]A. De Marco and T. Narbaev, "Earned value-based performance monitoring of facility construction projects," Journal of facilities Management, vol. 11, no. 1, pp. 69-80, 2013. [23]H. Khamooshi and H. Golafshani, "EDM: Earned Duration Management, a new approach to schedule performance management and measurement," International Journal of Project Management, vol. 32, no. 6, pp. 1019-1041, 2014. [24]S. Babar, M. J. Thaheem, and B. Ayub, "Estimated cost at completion: Integrating risk into earned value management," Journal of Construction Engineering and Management, vol. 143, no. 3, pp. 1-10, 2016. [25]M. N. Leila and S. Amir, "Evaluating Fuzzy Earned Value Indices and Estimates by Applying Alpha Cuts," Expert Systems with Applications, vol. 38, no. 7, pp. 8193-8198, 2011. [26]L. M. Naeni and A. Salehipour, "Evaluating fuzzy earned value indices and estimates by applying alpha cuts," Expert systems with Applications, vol. 38, no. 7, pp. 8193-8198, 2011. [27]J. Batselier and M. Vanhoucke, "Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management," International Journal of Project Management, vol. 33, no. 7, pp. 1588-1596, 2015. [28]M.-Y. Cheng and A. F. Roy, "Evolutionary fuzzy decision model for cash flow prediction using time-dependent support vector machines," International journal of project management, vol. 29, no. 1, pp. 56-65, 2011. [29]J. Pajares and A. Lopez-Paredes, "An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index," International Journal of Project Management, vol. 29, no. 5, pp. 615-621, 2011. [30]L.-P. Kerkhove and M. Vanhoucke, "Extensions of earned value management: Using the earned incentive metric to improve signal quality," International Journal of Project Management, vol. 35, no. 2, pp. 148-168, 2017. [31]W. Pewdum, T. Rujirayanyong, and V. Sooksatra, "Forecasting final budget and duration of highway construction projects," Engineering, Construction and Architectural Management, vol. 16, no. 6, pp. 544-557, 2009. [32]D. S. Jacob and M. Kane, "Forecasting schedule completion using earned value metrics revisited," The Measurable News, vol. 1, no. 1, pp. 11-17, 2004. [33]L. M. Naeni, S. Shadrokh, and A. Salehipour, "A fuzzy approach for the earned value management," International Journal of Project Management, vol. 29, no. 6, pp. 764-772, 2011. [34]M. N. Leila, S. Shahram, and S. Amir, "A Fuzzy Aproach for the Earned Value Management," International Journal of Project Management, vol. 29, no. 6, pp. 764-772, 2011. [35]PMI, A Guide to the Project Management Body of Knowledge. Newtown Square, Pennsylvania: Project Management Institute, 2017. [36]R. Elshaer, "Impact of sensitivity information on the prediction of project's duration using earned schedule method," International Journal of Project Management, vol. 31, no. 4, pp. 579-588, 2013. [37]M. Picornell, E. Pellicer, C. Torres-Machí, and M. Sutrisna, "Implementation of earned value management in unit-price payment contracts," Journal of Management in Engineering, vol. 33, no. 3, pp. 1-7, 2016. [38]A. Naderpour and M. Mofid, "Improving construction management of an educational center by applying earned value technique," Procedia engineering, vol. 14, pp. 1945-1952, 2011. [39]J. Batselier and M. Vanhoucke, "Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting," International journal of project management, vol. 35, no. 1, pp. 28-43, 2017. [40]R. Howes, "Improving the performance of Earned Value Analysis as a construction project management tool," Engineering, Construction and Architectural Management, vol. 7, no. 4, pp. 399-411, 2000. [41]J. Kim, C. Koo, C.-J. Kim, T. Hong, and H. S. Park, "Integrated CO2, cost, and schedule management system for building construction projects using the earned value management theory," Journal of Cleaner Production, vol. 103, pp. 275-285, 2015. [42]T. Khesal, A. Saghaei, M. Khalilzadeh, M. Rahiminezhad Galankashi, and R. Soltani, "Integrated cost, quality, risk and schedule control through earned value management (EVM)," Journal of Engineering, Design and Technology, vol. 17, no. 1, pp. 183-203, 2019. [43]E. Elbeltagi and M. Dawood, "Integrated visualized time control system for repetitive construction projects," Automation in Construction, vol. 20, no. 7, pp. 940-953, 2011. [44]S. El-Omari and O. Moselhi, "Integrating automated data acquisition technologies for progress reporting of construction projects," Automation in Construction, vol. 20, no. 6, pp. 699-705, 2011. [45]H. Alzraiee, "Integrating BIM and Earned Value Management System to Measure Construction Progress," in Construction Research Congress 2018, pp. 684-693. [46]Y. W. Kim and G. Ballard, "Is the earned value method an enemy of work flow?," Califirnia, 2000. [47]Y.-W. Kim and G. Ballard, "Management thinking in the earned value method system and the last planner system," Journal of management in engineering, vol. 26, no. 4, pp. 223-228, 2010. [48]M. Vanhoucke, "Measuring the efficiency of project control using fictitious and empirical project data," International journal of project management, vol. 30, no. 2, pp. 252-263, 2012. [49]E. H. Kim, W. G. Wells Jr., and M. R. Duffey, "A Model for Effective Implementation of Earned Value Management Methodology," International Journal of Project Management, vol. 21, no. 5, pp. 375-382, 2003. [50]L.-C. Chao and C.-F. Chien, "A model for updating project S-curve by using neural networks and matching progress," Automation in Construction, vol. 19, no. 1, pp. 84-91, 2010. [51]R. Aliverdi, L. M. Naeni, and A. Salehipour, "Monitoring project duration and cost in a construction project by applying statistical quality control charts," International Journal of Project Management, vol. 31, no. 3, pp. 411-423, 2013. [52]F. Acebes, J. Pajares, J. M. Galán, and A. López-Paredes, "A new approach for project control under uncertainty. Going back to the basics," International Journal of Project Management, vol. 32, no. 3, pp. 423-434, 2014. [53]M. Vanhoucke and J. Colin, "On the use of multivariate regression methods for longest path calculations from earned value management observations," Omega, vol. 61, pp. 127-140, 2016. [54]P. M. Wale, N. D. Jain, N. R. Godhani, S. R. Beniwal, and A. A. Mir, "Planning and Scheduling of Project using Microsoft Project (Case Study of a building in India)," Journal of Mechanical and Civil Engineering, pp. 57-63, 2015. [55]PMI, Practice Standard for Earned Value Management. Newtown Square, Pensylvinia: Project Management Institute, Inc, 2005. [56]L. Walt, Z. Ofer, H. Kym, and A. Frank, "Prediction of Project Outcome The Application of Statistical Methods to Earned Value Management and Earned Schedule Performance Indexes," International Journal of Project Management, vol. 27, no. 4, pp. 400-407, 2009. [57]W. Lipke, O. Zwikael, K. Henderson, and F. Anbari, "Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes," International journal of project management, vol. 27, no. 4, pp. 400-407, 2009. [58]B.-C. Kim, "Probabilistic evaluation of cost performance stability in earned value management," Journal of Management in Engineering, vol. 32, no. 1, pp. 1-13, 2015. [59]B.-C. Kim and K. F. Reinschmidt, "Probabilistic forecasting of project duration using Kalman filter and the earned value method," Journal of Construction Engineering and Management, vol. 136, no. 8, pp. 834-843, 2010. [60]A. Maravas and J.-P. Pantouvakis, "Project cash flow analysis in the presence of uncertainty in activity duration and cost," International journal of project management, vol. 30, no. 3, pp. 374-384, 2012. [61]S. T. H. Mortaji, R. Noorossana, and M. Bagherpour, "Project completion time and cost prediction using change point analysis," Journal of Management in Engineering, vol. 31, no. 5, p. 04014086, 2014. [62]H. Khamooshi and A. Abdi, "Project duration forecasting using earned duration management with exponential smoothing techniques," Journal of Management in Engineering, vol. 33, no. 1, pp. 1-11, 2016. [63]M. J. Liberatore, B. Pollack-Johnson, and C. A. Smith, "Project management in construction: Software use and research directions," Journal of construction engineering and management, vol. 127, no. 2, pp. 101-107, 2001. [64]S. S. Leu and Y. C. Lin, "Project Performance Evaluation Based on Statistical Process Control Techniques," Journal of Construction Engineering and Management, vol. 134, no. 10, pp. 813-819, 2008. [65]S.-S. Leu and Y.-C. Lin, "Project performance evaluation based on statistical process control techniques," Journal of Construction Engineering and Management, vol. 134, no. 10, pp. 813-819, 2008. [66]H. Abdul-Rahman, C. Wang, and N. a. B. Muhammad, "Project performance monitoring methods used in Malaysia and perspectives of introducing EVA as a standard approach," journal of civil engineering and management, vol. 17, no. 3, pp. 445-455, 2011. [67]S.-c. Kim, "Project success indicators focusing on residential projects: Are schedule performance index and cost performance index accurate measures in earned value?," Canadian Journal of Civil Engineering, vol. 36, no. 11, pp. 1700-1710, 2009. [68]Ö. Hazır, "A review of analytical models, approaches and decision support tools in project monitoring and control," International Journal of Project Management, vol. 33, no. 4, pp. 808-815, 2015. [69]W. Lipke, "Schedule is different," The Measurable News, vol. 10, no. 3, pp. 1-10, 2003. [70]L. A. Townsend, T. A. Mazzuchi, and S. Sarkani, "A schedule-performance approach for level-of-effort tasks," Engineering Management Journal, vol. 26, no. 1, pp. 21-30, 2014. [71]M. Vanhoucke and S. Vandevoorde, "A simulation and evaluation of earned value metrics to forecast the project duration," Journal of the Operational Research Society, vol. 58, no. 10, pp. 1361-1374, 2007. [72]R. J. Hyndman, A. B. Koehler, R. D. Snyder, and S. Grose, "A state space framework for automatic forecasting using exponential smoothing methods," International Journal Forecasting, vol. 18, no. 3, pp. 439-454, 2004. [73]W. Mathieu and V. Mario, "Study of the Stability of Earned Value Management Forecasting," Journal of Construction Engineering and Management, vol. 141, no. 4, pp. 1-11, 2014. [74]R. A. Marshall. (2008, August 21) Top ten secrets of earned value management. Governement Technology. [75]Y. Turkan, F. Bosché, C. T. Haas, and R. Haas, "Toward automated earned value tracking using 3D imaging tools," Journal of construction engineering and management, vol. 139, no. 4, pp. 423-433, 2012. [76]J. Ponto, "Understanding and Evaluating Survey Research," Journal of the Advanced Practioner in Oncology, vol. 6, no. 168, pp. 168-171, 2015. [77]M. Vanhoucke, "Using activity sensitivity and network topology information to monitor project time performance," Omega, vol. 38, no. 5, pp. 359-370, 2010. [78]P. A. de Andrade, A. Martens, and M. Vanhoucke, "Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities," Automation in Construction, vol. 99, pp. 68-78, 2019. [79] W. Fleming, Quentin and M. Koppelman, Joel., "Project teams: The role of the project office," Cost Engineering, vol. 40, pp. 33-36,1998. [80] K. B. Sagar, V. Gayatri, "Cost Controlling Using Earned Value Analysis in Construction Industries," International Journal of Engineering and Innovative Technology (IJEIT), vol. 1, no. 4, pp. 324-332, 2012.
|