|
1.Aberdeen Group (2000). Beating the Competition with Collaborative Product Commerce, Aberdeen Group, Inc. 2.Aberdeen Group (2003). Data Visualization: Foundation for PLM Success. Aberdeen Group, Available from: http://www.aertia.com/docs/cimmetry/Aberdeen-Cimmetry_Whitepaper.pdf 3.Aberdeen Group (2005). Product Innovation Agenda Benchmark Report, Aberdeen Group, Inc. 4.Aberdeen Group (2006), Product Portfolio Management Benchmark Report, Aberdeen Group, Inc. 5.Aberdeen Group (2007).The Configuration Management Report: Formalizing and Extending CM to Drive Quality,February, 2007 6.Alavi, M., & Carlson, P. (1992). A Review of MIS Research and Disciplinary Development. Journal of Management Information Systems, 8(4), 45-62. 7.Allan, G. (1997). Configuration Management and Its Impact on Businesses that Use Computer Platforms. International Journal of Project Management, 15(5), 321-330. 8.ANSI/EIA-649-A:2004 National Consensus Standard for Configuration Management. American National Standards Institute (ANSI).t, Washington, USA. 9.Babbie, E., & Mouton, J. (1998). The Practice of Social Science Research.. Belmont, CA: Wadsworth Publishing 10.Bagchi, S., Kanungo, S., & Dasgupta, S. (2003). Modeling Use of Enterprise Resource Planning Systems: A Path Analytic Study. European Journal of Information Systems, 12(2), 142-158. 11.Balcerak, K. J., & Dale, B. G. (1992). Engineering Change Administration: The Key Issues. Computer Integrated Manufacturing Systems, 5(2), 125-132. 12.Barzizza, R., Caridi, M., & Cigolini, R. (2001). Engineering Change: a Theoretical Assessment and a Case Study. Production Planning & Control, 12(7), 717-726. 13.Bayrak, T. (2013). A Decision Framework for SME Information Technology (IT) Managers: Factors for Evaluating Whether to Outsource Internal Applications to Application Service Providers. Technology in Society, 35(1), 14-21. 14.Bayus, B. L. (1998). An Analysis of Product Lifetimes in a Technologically Dynamic Industry. Management Science, 44(6), 763-775. 15.Bidgoli, H. (2004). The Internet Encyclopedia (Vol. 3). John Wiley & Sons., p. 707. 16.Botta-Genoulaz, V., & Millet, P. A. (2006). An Investigation Into the Use of ERP Systems in The Service Sector. International Journal of Production Economics, 99(1), 202-221. 17.Brown, J., & Boucher, M. (2007). Engineering Change Management 2.0: Better Business Decisions From Intelligent Change Management. Aberdeen Group, A Harte-Hanks Company, Technical Report. 18.Buckley, F. J. (1993). Implementing Configuration Management Hardware, Software and Firmware. The Institute of Electrical and Electronics Engineers. Inc, New York. 19.Burgess, T. F., McKee, D., & Kidd, C. (2005). Configuration Management in The Aerospace Industry: A Review of Industry Practice. International Journal of Operations & Production Management, 25(3), 290-301. 20.Chang, A. T., Shih, J. S., & Choo, Y. S. (2011). Reasons and Costs for Design Change During Production. Journal of Engineering Design, 22(4), 275-289. 21.Cheng, F. T., Chen, Y. L., and Chang, J. Y. –C., 2012. Engineering Chain: A Novel Semiconductor Engineering Collaboration Model. IEEE Transactions on Semiconductor Manufacturing, 25(3), 394-407. 22.CIMdata (2002). Product Lifecycle Management (PLM) Definition., CIMData available at www.cimdata.comen/resources/complimentary-reports-research/white-papers 23.CIMdata Report (2005). PLM and ERP Integration: Business Efficiency and Value. CIM Data. Ann Arbor, Michigan, USA 24.CIMdata. (2002). Product Lifecycle Management: Empowering the Future of business. CIMdata report, available at www.cimdata.com. 25.Collaborative Visions (2003), PLM A-C-T-I-O-N, Collaborative Visions 26.Connolly, J.(2002), PLM Taking Technologies to New Heights, Time Compress 27.Cooper, D.R. & C.W. Emory (1995). Business Research Methods, 5th ed., Richard D. Irwin Inc. , p.141. 28.Cummings, Thomas, Edgar Huse (2009). Organizational Development and Change, New York, West Pub. 29.Davenport, T. H., & Short, J. E. (1990). The New Industrial Engineering: Information Technology and Business Process Redesign. Sloan Management Review, 31(4). 30.Dean. J.(1950) Pricing Policies for New Products. Harvard Business Review. ,28(6):45-53 31.Diprima, M. (1982). Engineering Change Control and Implementation Considerations. PRODUCT. & INVENT. MGMT., 23(1), 81-87. 32.Dori, D., Gal, A., & Etzion, O. (1996). A Temporal Database with Data Dependencies: A Key to Computer Integrated Manufacturing. International Journal of Computer Integrated Manufacturing, 9(2), 89-104. 33.Drucker, P. F. (1995). People and performance: The best of Peter Drucker on Management. Routledge. 34.Eckert, C., Clarkson, P. J., & Zanker, W. (2004). Change and Customisation in Complex Engineering Domains. Research in Engineering Design, 15(1), 1-21. 35.Eisenhardt, K. M. (1989). Building Theories From Case Study Research. Academy of Management Review, 14(4), 532-550. 36.Fine, C. H., & Whitney, D. E. (2002). Is the Make-Buy Decision Process a Core Competence?.. MIT Center for Technology, Policy, and Industrial Development. 37.Gartner Group, Inc.(2010), Brant, Kenneth F. and Halpern, Marc; Findings: PLM’s Business Value Is Fundamental, Yet Still Not Well-Understood, April 1, 2010. 38.Gmelin, H., & Seuring, S. (2014). Achieving Sustainable New Product Development by Integrating Product Life-cycle Management Capabilities. International Journal of Production Economics. , (ahead-of-print) 39.Goffin, K. (2000). Design for Supportability: Essential Component of New Product Development. Research-Technology Management, 43(2), 40-47. 40.Gordon, SR, & Gordon, JR, (1996). Information Systems A Management Approach,NY: Harcourt Brace and Company 41.Grover, V., & Goslar, M. D. (1993). The Initiation, Adoption, and Implementation of Telecommunications Technologies in US Organizations. Journal of Management Information Systems, 10(1), 141-163.Information Systems. pp. 141-163. 42.Grover, V., Jeong, S. R., Kettinger, W. J., &Teng, J. T. (1995). The Implementation of business Process reengineering. Journal of Management Information Systems, vol. 12(1), pp: 109-144. 43.Grover, V., Teng, J.T. C, Fiedler, K. D.,(1993),Information Technology Enabled business Process redesign: an Integrated Planning Framework, Omega Int. J of Mgmt Sci. Vol.21 No.4 P.433~P.447 . 44.Guess, V. C. (2002). CMII of Business Process Infrastructure. Hollis Publishing Company. 45.Hammer, M. (1990). Reengineering Work: Don't Automate, Obliterate. Harvard business review, 68(4), 104-112. 46.Hardwick, M., Downie, B. R., Kutcher, M., & Spooner, D. L. (1995). Concurrent Engineering with Delta Files. Computer Graphics and Applications, IEEE, 15(1), 62-68. 47.Hayes, R. H. (1988). Dynamic Manufacturing: Creating the Learning Organization. Simon and Schuster. The Free Press, New York 48.Huang, G. Q., & Mak, K. L. (1999). Current Practices of Engineering Change Management in UK Manufacturing Industries. International Journal of Operations & Production Management, 19(1), 21-37. 49.Huang, G. Q., Yee, W. Y., & Mak, K. L. (2003). Current Practice of Engineering Change Management in Hong Kong Manufacturing Industries. Journal of Materials Processing Technology, 139(1), 481-487. 50.ICM (Institute of Configuration Management) 2002. CMⅡ for Business Process Infrastructure. Holly Publishing Company, Phoenix, Arizona, USA 51.Information Resources Management Association. (2006). Emerging Trends and Challenges in Information Technology Management: 2006 Information Resources Management Association International Conference, Washington, DC, USA, May 21-24, 2006 (Vol. 1). M. Khosrowpour (Ed.). IGI Global. 52.Innes JG (1994) Achieving Successful Product Change: Financial Times/ Pitman Publishing Management Series). Trans-Atlantic Publications, Pennsylvania, USA 53.Institute of Configuration Management (2009). CMⅡ Standard for Configuration Management —Basis for CMⅡ Traning and Five Levels of Certification, CMⅡ: The Path to Integrated Process Excellence. Institute of Configuration Management (ICM). Phoenix,Arizona,USA 54.Institute of Configuration Management (2012). CMII-100F: CMII Standard for Integrated Process Excellence and Configuration Management. Institute of Configuration Management (ICM). Phoenix,Arizona,USA 55.International Standard Organization (2000), ISO 9001, Quality Management Systems-Requirements, Geneva, Switzerland. 56.International Standard Organization (2003), ISO 10007, Quality Management guidelines for Configuration Management, Geneva, Switzerland. 57.Jackson, C. K. (2006). The Mechatronics System Design Benchmark Report–Coordinating Engineering Disciplines. Boston: The Aberdeen Group. 58.Jarratt, T. A. W., Eckert, C. M., & Caldwell, N. H. M., (2011). Engineering Change: An Overview and Perspective on the Literature. Research Engineering Design, 22, 103-124. 59.John Leonard (1999),Systems Engineering Fundamentals; Deffense Systems Management College Press 60.Keen, Peter G.W.(1991), Shaping the Future: Business Design Through Information Technology Harvard Business School Press. Boston, MA 61.Klaus, H., Rosemann, M., & Gable, G. G. (2000). What is ERP?. Information Systems Frontiers, 2(2), 141-162. 62.Lacy, J.A.(1992), Management of System Engineering, Mcgraw-Hill, Inc.. 63.Levirt. T.(1965) Exploit the Product Life Cycle. Harvard Business Review. ,43(6):81-94 64.Lincke,W. (1995), Simultaneous Engineering, Hamburg, Germany: Hanser. 65.Loch,C.H.,Terwiesch,C(1999).:Managing the Process of Engineering Change Orders: the Case. J. Prod. Innov. 16(2), 160–172 66.Markus, L.M. & D. Robey. (1998), Information Technology and Organizational Change: Causal Structure in Theory and Research, Management Science, 34: 5, pp. 583-598. 67.Martini, W. J. (1996). The Electronic Change request: Applying TQM to the Creative Design Process. Production and Inventory Management Journal, 37, 1-6. 68.Miller, E. (1999). Integrating PDM and ERP. Computer-Aided Engineering, 18(3), 69. 69.MIL-HDBK-61A.(2001).,Configuration Management Guidance 70.MIL-STD-973. (1992). Configuration Management. US Department of Defense. 71.Monfared, M. A. S., & Yang, J. B. (2007). Design of Integrated Manufacturing Planning, Scheduling and Control Systems: A New Framework for Automation. The International Journal of Advanced Manufacturing Technology, 33(5-6), 545-559. 72.Orlikowski, W. J., & Baroudi, J. J. (1991). Studying Information Technology in Organizations: Research Approaches and Assumptions. Information Systems Research, 2(1), 1-28. 73.Otto, K., & Wood, K. (2001). Product Design: Techniques in Reverse Engineering and New Product Design. Prentice Hall. 74.Pikosz, P. & Malmqvist, J. (1998) A Comparative Study of Engineering Change Management in Three Swedish Engineering Companies, Proceedings of Design Engineering Technical Conference, Atlanta 75.Plossl, G. W. (1985). Production and Inventory Control: Principles and Techniques, 2nd ed., New Jersey: Prentice Hall. 76.Reddi, K. R. & Moon, Y. B., (2011). System Dynamics Modeling of Engineering Change Management in a Collaborative Environment. International Journal of Advanced Manufacturing Technology, 55, 1225-1239. 77.Reddi, K. R., & Moon, Y. B. (2013). Modelling Engineering Change Management in a New Product Development Supply Chain. International Journal of Production Research, 51(17), 5271-5291. 78.Rink, D. R., & Swan, J. E. (1979). Product Life Cycle research: A Literature review. Journal of Business Research, 7(3), 219-242. 79.SAE Standard (2004), AS 9100 Quality Management Systems Aerospace Requirements, Rev. B. 80.Saeed, B. I., Bowen, D. M., & Sohoni, V. S. (1993). Avoiding Engineering Changes Through Focused Manufacturing knowledge. Engineering Management, IEEE Transactions on, 40(1), 54-59. 81.Schuh, G., Rozenfeld, H., Assmus, D., & Zancul, E. (2008). Process Oriented Framework to Support PLM Implementation. Computers in Industry, 59(2), 210-218. 82.Shankar, P., Morkos, B. & Summers, J.D. (2012) Reasons for Change Propagation: a Case Study in an Automotive OEM, Research in Engineering Design, pp. 1-13. 83.Shiau, J. Y. & Li, X., 2007. A Closed-loop Design Change Control Workflow in Product Data Management for Conceptual Design Phase. International Journal of Intelligent Control and Systems, 12, 24–36. 84.Shtub, A. & Bard, J. (1994), Project Management Engineering, Technology and ImplemenShtub, A., Bard, J. F., & Globerson, S. (1994). Project Management: Engineering, Technology, and Implementation. Prentice-Hall, Inc.. 85.Smith, P. G., & Reinertsen, D. G. (1991). Developing Products in Half The Time (pp. 100-106)., John Wiley & Sons. New York: Van Nostrand Reinhold. 86.Smith, R. P., & Eppinger, S. D. (1997). Identifying Controlling Features of Engineering Design Iteration. Management Science, 43(3), 276-293. 87.Soderberg,L.G.(1989),Facing Up to Engineering Gap, McKinsey Quarterly ,Spring: PP.3-23. 88.Sorrentino Joseph.(2009). Configuration Management Implementation, Principles, and Applications for Manufacturing Industries, Printed in the United States of America: Taylor & Francis Group, pp.1-97. 89.Tavčar, J. & Duhovnik, J. (2005). Engineering Change Management in Individual and Mass Production. Robotics and Computer-Integrated Manufacturing, 21, 205–215. 90.Teresko, J. (2004). Auto Report: Information Technology The PLM Revolution. INDUSTRY WEEK-CLEVELAND OHIO-, 253(2), 32-38. 91.Venkatraman, N.,(1994),IT-Enabled Business Transformation: From Automation to Business Scope Redefinition , Sloan Management Review, Winter 1994. 92.Watts, F. (1984), Engineering Changes: A Case Study, Production and Inventory Management Journal, Vol. 25 No.4, pp.55-62 93.Weill, P., & Broadbent, M. (1999). Four Views of IT Infrastructure: Implications for IT Investments. Beyond the IT Productivity Paradox, 335-369.pp335-360. 94.Whitgift, D. (1991). Methods and Tools for Software Configuration Management. J. Wiley., Chichester, England,. 95.Whitman, M. E. (1996). IT Divergence in Reengineering Support: Performance Expectations vs. Perceptions. Information & Management, 30(5), 239-250. 96.Willcox.B ,(1996),Controlling Engineering Change Notes, Action MRP Ⅱ,Sep.1996 97.Wright, I. C. (1997). A Review of Research into Engineering Change Management: Implications for Product Design. Design Studies, 18(1), 33-42. 98.Wu, W. H., Fang, L. C., Lin, T. H., Yeh, S. C., & Ho, C. F. (2012). A Novel CMII-Based Engineering Change Management Framework: An Example in Taiwan's Motorcycle Industry. Engineering Management, IEEE Transactions on,59(3), 494-505. 99.Yin, R. K. (2003). Case Study Research: Design and Methods (3rd ed.). Thousand Oaks, CA: Sage.
|