[1].Abba, W., “How Earned Value Got to Prime Time: A Short Look Back and Glance Ahead,” EVMS Track Presentations from PMI connections, 2000, Houston.
[2].Alexander, S., “Earned Value Management Systems (EVMS): Basic Concepts,” U.S. Department of Energy, 1998, Washington, D. C. Chapter.
[3].AVM Brian J. Graf, “The Development of C/SCSC, Using Performance Measures as an Agent of Change in Mining Conference,” 1997, Sydney.
[4].Fleming, Q. W., “Put Earned Value Into Your Management Control System,” Columbus, Ohio: Publishing Horizons, Inc, 1983.
[5].Gansler, J. S., Industry standard "Earned Value Management Standard", Policy Memorandum, Undersecretary of Defense (Acquisition and Technology), August 17, 1999.
[6].Kathy Schwable, “Information Technology Project Management,” 5th ed., Thomson, 2008.
[7].Kerzner, H., “Project Management:A Systems Approach to Planning, Scheduling and Controlling,” 6th ed., John Wiley & Sons, Inc., 2001.
[8].Mandatory Procedures for Major Defense Acquisition Programs (MDAPs) and Major Automated Information System (MAIS) Acquisition Programs, DoD Regulation 5000.2-R (change 2), October 6, 1997, Appendix VI.
[9].Meredith, J. R., and Mantel, S. I., “ Project Management,” John Wiley & Sons, Inc., 1989, New York.
[10].Newman, W. H., Warren, E. K., and McGill, A. R., “The Process of Management: Strategy, Action, Results,” 6th ed., Englewood Cliffs, NJ: Prentice Hall 1987, p.140 Reprinted by permission.
[11].Nicholas John M., “Project Management for Business and Technology,” Ohio: Prentice Hall, Inc., 2001.
[12].Project Management Institute Standards Committee, “A Guide to the Project Management Body of Knowledge,” 3rd ed., 2004.
[13].Reeser, C., “Management: Function and Modern Concepts,” Foreman and Company, Scott, 1973.
[14].Rory Burke, “Project Management-Planning and Control Techniques,” 3rd ed., John Wiely & Sons, Ltd, 1999.
[15].Stevenson W. J., “Production and Operations Management,” 5th ed., IRWIN, 1996.
[16].Strauss, H., McClure, D., and White, R., “What Every Government IT Professional Should Know About Earned Value Management,” Gartner, January, 2006.
[17].Wysocki, R. K., Beck, R. Jr., and Crane, D. B., “Effective Project Management: How to Plan, Manage, and Deliver Projects on Time and within Budget,” New York, John Wiley & Sons, 1995, pp. 38.
[18].王慶富,「專案管理」,台北聯經,1996,P.1~18,192~205。
[19].曹延傑,「專案管理」,格致圖書有限公司,2000。
[20].許成績,「現代專案管理教材」,博碩文化(股)公司,2005,初版二刷。
期刊論文
[21].Barr, Z., “Earned Value Analysis: A Cast Study,” PM Network, December, 1996 pp. 31 – 37.
[22].Blackmore, M., “EVM-The UKMoD Perspective, Management of Projects Seminar,” Stockholm, June 8-9, 1998, Sweden.
[23].Brown, J. W., “Evaluation of Projects Using Critical Path Analysis and Earned Value in Combination,” Project Management Journal, Vol. 16, August, 1985.
[24].Bygstad, B., and Lanestedt, G., “ICT based service innovation – A challenge for project management,” International Journal of Project Management, Vol. 27, No. 3, 2009, pp. 234–242.
[25].Chen, H. G., Jiang, J. J., Klein, G., and Chen, J. V., “Reducing software requirement perception gaps through coordination,” The Journal of Systems and Software, Vol. 82, No. 4, 2009, pp. 650-655.
[26].Christensen, D. S., and Ferens, D., “Using Earned Value on Software Development Projects,” Acquisition Review Quarterly, Vol. 2, Spring, 1995, pp. 155-171.
[27].Christensen, D. S., and Payne, K., “CPI Stability-Fact or Fiction?” Journal of Parametric, Vol. 10, April, 1992, pp. 27-40.
[28].Christensen, D. S., and Rees, D., “Is the Cumulative CPI based EAC a Lower Bound to Final Cost on Post-A12 Contracts?” Journal of Cost Analysis and Management, Winter, 2002, pp. 55-65.
[29].Christensen, D. S., and Templin, C., “EAC Evaluation Methods: Do They Still Work?” Acquisition Review Quarterly, Vol. 9, Spring, 2002, pp. 105-116.
[30].Fleming, Q. W., and Koppelman, J. M., "Earned Value Project Management: A Powerful Tool for Software Projects," CROSSTALK, The Journal of Defense Software Engineering, Vol. 7, No. 10, July 1998, pp. 19-23.
[31].Fleming, Q. W., and Koppelman, J. M., "What''s Your Project''s Real Price Tag?" Harvard Business Review, September, 2003, pp. 20-22.
[32].Fleming, Q. W., and Koppelman, J. M., “Earned Value Management,” Project Management, Vol. 11, Mar-Apr, 2002, pp. 90-95.
[33].Grant, R. M., “Toward a knowledge-based theory of the firm,” Strategic Management Journal, Vol. 17, Winter Special Issue, 1996, pp. 109–22.
[34].Howes, R., “Improving the Performance of Earned Value Analysis as A Construction Project Management Tool,” Engineering Construction & Architectural Management, Vol. 7, 2000, pp. 399-411.
[35].Kim, E.H., Wells,W.G., and Duffey, M. R., “A model for effective implementation of Earned Value Management methodology,” International Journal of Project Management, Vol. 21, No. 5, 2003, pp. 375-382.
[36].Kim, Y. W., and Glenn, B., “Earned Value Method And Customer Earned Value,” Journal of Construction Research, Vol. 3, pp. 55-66.
Kwak, Y. H., and Anbari, F. T., “Analyzing project management research: Perspectives from top management journals,” International Journal of Project Management, Vol. 27, No. 5, 2009, pp. 435–446.
[37].Mota, C. M. M., Almeida, A. T., and Alencar, L. H., “A multiple criteria decision model for assigning priorities to activities in project management,” International Journal of Project Management, Vol. 27, No. 2, 2009, pp. 175–181.
[38].Napier, N. P., Keil, M., and Tan, F. B., “IT project managers'' construction of successful project management practice: A repertory grid investigation,” Info Systems J, Vol. 19, No. 3, 2009, pp. 255–282.
[39].Plaza, M., “Team performance and information system implementation -- Application of the progress curve to the earned value method in an information system project,” Inf Syst Front, Vol. 10, 2008, pp. 347–359.
[40].Ralph Currier Davis, “The Foundations of Top Management,” New York, Harper, 1951, pp. 269.
[41].Shtub, A., “Evulation of Two Schedule Control Techniques for The development and Implementation of New Technologies: A Simulation Study,” R&D Management, Vol. 22, No. 1, 1992, pp. 81-87.
[42].Tesch, D., Sobol, M. G., Klein, G., and Jiang, J. J., “User and developer common knowledge: Effect on the success of information system development projects,” International Journal of Project Management, Vol. 27, No. 7, 2009, pp. 657–664.
[43].Thomas, R., “The ABCs of EVM: Using Earned Value on Your Own Project”, The Air Force Acquisition Reform Newsletter, Vol. 3, No. 1, January/February 2000, pp. 1-2.
[44].Verner, J. M., and Evanco, W. M., “In-house software development: what project management practices lead to success?” IEEE Software, Vol. 22, No. 1, 2005, pp. 86–93.
會議論文
[45].Abba, W., “Keynote Address, the 15th Annual International college of Performance Management Conference,” St. Paul, Minnesota, May, 1999.
[46].Chen, M. T., “Applying Earned Value Procedure to Engineering Management,” AACE Transactions, 1991, O.4.1- O.4.5.
學位論文
[47].毛格民,「多專案實獲值績效分析機制之建立」,碩士論文,逢甲大學工業工程學所,台中,2003。[48].王斐生,「實獲值管理在專案管理上運用之設計」,碩士論文,國防管理學院後勤管理研究所,台北,2002。[49].王煇騰,「探討資訊軟體專案開發有效結案之研究」,碩士論文,中原大學資訊管理研究所,桃園,2007。[50].吳聰敏,「實獲值管理應用於營建工程專案成本管控之研究」,碩士論文,台灣大學土木工程學研究所,台北,2006。[51].林蒼裕,「實獲值管理在工程專案管理之應用-以A機電工程公司工程專案為例」,碩士論文,中央大學高階主管企管碩士班,桃園,2006。[52].李宗憲,「實獲值管理在工程專案管理之應用改進研究」,碩士論文,成功大學高階管理碩士在職專班,台南,2007。[53].沈明恩,「實獲值管理(EVM)在大型研發組織導入之研究-以中科院試行規劃為例」,碩士論文,國防管理學院後勤管理研究所,台北,2003。[54].張惠敏,「應用實獲值分析與風險辨識建構專案管理模式」,碩士論文,逢甲大學經營管理碩士在職專班,台中,2007。[55].黃鵬龍,「不同要徑特性下,專案緩衝對實獲值影響之研究」,碩士論文,國防管理學院後勤管理研究所,台北,2004。[56].楊智評,「專案時程與成本績效指標之建構」,碩士論文,中華大學科技管理研究所,新竹,2004。[57].廖志寬,「企業專案管理系統 - 提升專案即時資訊透通性及其效益分析」,碩士論文,中央大學資訊管理學系碩士在職專班,桃園,2007。[58].廖國良,「實獲值管理於專案管理之應用研究--以A工程公司石化建廠為例」,碩士論文,中正大學企業管理所,嘉義,2006。[59].賴建瑞,「實獲值管理於工程實務之應用研究」,碩士論文,逢甲大學土木工程所,台中,2006。其他
[60].The Standish Group: http: //www.standishgroup.com/newsroom/chaos_2009.php
[61].Planning and Control Guide
[62].TimGlobe台灣資訊服務業商情網: http://www.timglobe.com.tw/group/application/hansy/index.php
[63].汪家琪,「高等專案管理」,華樊大學資管所高等專案管理講義,2004。
[64].周祥東,「實獲值管理:基礎篇」,中華專案管理學會電子報專案管理專欄,第37 期,2003。