|
[1]Korve, H. W., Farran, J. I., Mansel, D. M., Levinson, H. S., Chira-Chavala, T., & Ragland, D. R. (1996). Integration of Light Rail Transit into City Streets (No. Project A-5 F Y''93). [2]Vuchic, V. R. (2007). Urban Transit Systems and Technology. John Wiley & Sons. [3]FOX, GERALD D. Light Rail/Traffic Interface in Portland: The First Five Years. Transportation Research Record, 1992, 176-176. [4]Saffer, H. G., & Wright, T. (1994). The Development of LRT Signal Control Techniques for the Sheffield Supertram System. [5]Tighe, W. A., & Patterson, L. A. (1985). Integrating LRT into Flexible Traffic Control Systems. State-of-the-Art Report. [6]Nelson, J. D., Brookes, D. W., & Bell, M. G. (1993). Approaches to the Provision of Priority for Public Transport at Traffic Signals: A European Perspective. Traffic Engineering & Control, 34(9). [7]Sunkari, S. R., Beasley, P. S., Urbanik, T., & Fambro, D. B. (1995). Model to Evaluate the Impacts of Bus Priority on Signalized Intersections. Transportation Research Record, 117-123. [8]Yangfan Zhou, Shunping Jia , Sijia Zhang, Wei Wei. (2016). Study on Detecting Location for Bus Rapid Transit with Signal Priority. International Conference on Computer and Information Technology Application. [9]Jaeseok Kwon, Youngje Jeong, Hyerim Cho & Youngchan Kim (2016). Mathematical Solution and Simulation for Detection Location of Bus Signal Priority. International Conference on Applied Mathematics, Simulation and Modelling. [10]Liu, H., Skabardonis, A., Zhang, W. B., & Li, M. (2004). Optimal Detector Location for Bus Signal Priority. Transportation Research Record: Journal of the Transportation Research Board, (1867), 144-150. [11]Zhou, G., Gan, A., & Zhu, X. (2006). Determination of Optimal Detector Location for Transit Signal Priority with Queue Jumper Lanes. Transportation Research Record: Journal of the Transportation Research Board, (1978), 123-129. [12]Dreher, F., Ahuja, S., van Vuren, T., & Smith, J. (2005). Innovative modelling and design of integrated light rail transit priority systems-case study of LRT in Nottingham, UK. PROCEEDINGS OF ETC 2005, STRASBOURG, FRANCE 18-20 SEPTEMBER 2005-TRANSPORT POLICY AND OPERATIONS-TRAFFIC ENGINEERING AND STREET MANAGEMENT-INNOVATIONS IN URBAN TRAFFIC MANAGEMENT AND CONTROL. [13]PTV AG, VISSIM 5.40 User Manual, Germany, 2012. [14]Koonce, P. (2008). Traffic Signal Timing Manual (No. FHWA-HOP-08-024). United States. Federal Highway Administration. [15]Naznin, F., Currie, G., & Logan, D. (2016, November). Exploring the Key Challenges in Tram Driving and Crash Risk Factors on the Melbourne Tram Network: Tram Driver Focus Groups. In Australasian Transport Research Forum (ATRF), 38th, 2016, Melbourne, Victoria, Australia. [16]Grote, W., & Yu, J. C. (1985). Analysis of Light Rail Vehicle Clearance Time at Intersections (No. HS-039 129). [17]Brilon, W., & Laubert, W. (1994). Priority for Public Transit in Germany. Journal of Advanced Transportation, 28(3), 313-340. [18]新北市政府. 「安坑線輕軌暨周邊土地開發綜合規劃報告書」,民國104年6月。 [19]陳諭嫺. 整合輕軌電車優先號誌時制之模擬研究. 臺灣大學土木工程學研究所學位論文, 2013, 1-144. [20]林胤宏. 輕軌運輸系統交通控制策略之模擬研究. 臺灣大學土木工程學研究所學位論文, 2001,。 [21]交通部運輸研究所,「輕軌與公車捷運系統納管之研析(II)」,民國96年11月。 [22]交通部運輸研究所、立皓科技股份有限公司,「台北市公車優先號誌之研發與示範(二)」,民國92年。 [23]李文騫. (2003). 國家智慧型運輸系統標準通訊協定 (NTCIP) 整合式通訊平台之研究, 開發與實作 (4). 公車觸動號誌系統之研發與實作 [24]許添本, & 林胤宏. (2003). 輕軌運輸系統交通控制策略之模擬分析. 都市交通, 18(4), 65-85. [25]交通部高速鐵路工程局,「輕軌運輸系統平面運行交通管制策略之研究」,民國95年4月。 [26]許添本等,「VISSIM與NETSIM於國內應用的飽和流量驗證比較分析」,中華民國運輸學會第15屆學術論文研討會論文集,中華民國運輸學會,民國89年12月,頁97-106。 [27]台北市交通管制工程處,「101年交通改善措施微觀車流模擬成效評估案」,民國101年6月。 [28]萊瑞國際交通運輸工程顧問公司,「微觀交通模擬程式VISSIM簡介」,萊瑞國際交通運輸工程顧問公司,民國88年。 [29]新北市政府捷運工程局,期末設計工程細部設計圖說D版,民國107年,1月 [30]新北市政府捷運工程局、中國鋼鐵股份有限公司,輕軌號誌與平面道路號誌整合分析報告(C版),民國107年,1月 [31]新北市政府捷運工程局、新亞建設開發股份有限公司,安坑輕軌運輸系統計畫土建統包工程施工交通維持計畫書,民國106年,4月 [32]交通部運輸研究所,「交通號誌規畫手冊」,民國75年。 [33]交通部運輸研究所,「臺灣地區公路容量手冊」,民國100年。
|