[1]英華威公司,「彰濱風場併聯計畫及系統衝擊分析報告」,2005年。
[2]英華威公司,「鹿港風場併聯計畫及系統衝擊分析報告」,2005年。
[3]余勝雄、張燕全,「我國風力發電應用現況及展望」,中國工程師學會會刊,第七十八卷,第五期,第17∼26頁,民國九十四年。[4]Global Wind Energy Council (GWEC), “Record Year for Wind Energy:Global Wind Power Market Increased by 43% in 2005,” February 2006. Avaliable: http://www.gwec.net/uploads/media/06-02_PR_Global_Statistics_2005.pdf
[5]GWEC, Wind Force 12 “A Blueprint to Achieve 12% of The World’s Electricity from Wind Power by 2020,” June 2005. Avaliable: http://www.gwec.net/fileadmin/documents/Publications/wf12-2005.pdf
[6]European Wind Energy Association (EWEA), “Future Prospects for Wind Power Markets,” Nov. 2004. Avaliable: http://www.ewea.org/fileadmin/ewea_documents/documents/publications/factsheets/factsheet_future2.pdf
[7]陳在相、辜志承,「風力發電機與市電系統併聯之衝擊及其分析與模擬技術之研究」,民國九十四年四月。
[8]王清平、何秉衡,「風力發電對澎湖系統之影響探討」,民國九十三年。
[9]許時棋,「風力發電機倂接於配電系統防止孤島運轉之研究」,碩士論文,國立台灣科技大學,民國九十五年。[10]郭誌原,「風力發電與電力系統併聯影響研究」,碩士論文,國立中山大學,民國九十三年。[11]M. A. PÖller, “Doubly-Fed Induction Machine Models for Stability Assessment of Wind Farm,” DIgSILENT, 2003. Avaliable: http://www.digsilent.de/Consulting/Publications/DFIG_Modeling.pdf
[12]L. Holdsworth, X. G. Wu, J. B. Ekanayake, N. Jenkins, “Comparision of Fixed Speed and Doubly-Fed Induction Wind Turbines During Power System Disturbances,” IEE Proc-Gener. Trans. Distri, pp. 343-352, Vol. 150, No. 3, May 2003.
[13]T. Thiringer, A. Peterson, T. Petru, “Grid Disturbance Response of Wind Turbines Equipped with Induction Generator and Doubly-Fed Induction Generator,” Power Engineering Society General Meeting, Vol.3, pp.13-17, July 2003.
[14]S. Achilles, M. A. PÖller, “Direct Drive Sychronous Machines Models for Stability Assessment of Wind Farms,” DIgSILENT. 2003. Avaliable: http://www.digsilent.de/Consulting/Publications/DirectDrive_Modeling.pdf
[15]M. A. PÖller, Sebastian Achilles, “Aggregated Wind Park Models for Analyzing Power System Dynamics,” DIgSILENT, 2004. Avaliable: http://www.digsilent.de/Consulting/Publications/WindParkModeling.pdf
[16]經濟部能源局,「提昇我國電力系統穩定度之分析規劃」,民國九十四年三月。
[17]PTI., “Online Documentation PSS/E-29,”October 2002.
[18]E. Muljadi, C. P. Butterfield, J. Conto, K. donoho, “ERCOT’s Dynamic Model of Wind Turbine Generators,” WindPower 2005, Denver, Colorado, May 2005.
[19]http://www.pti-us.com/
[20]Y. Kazachkov, “GE Wind 1.5MW and 3.6MW Wind Turbine Generators,” PSS/E Dynamic Models Documentation, Shaw Power Technologies, Inc., June 2004.
[21]Y. Kazachkov, S. Stapleton, “Vestas V47 Wind Turbine Generators,” PSS/E Dynamic Models Documentation, Shaw Power Technologies, Inc., May 2004.
[22]Y. Kazachkov, S. Stapleton, “Vestas V80 Wind Turbine Generators,” PSS/E Dynamic Models Documentation, Shaw Power Technologies, Inc., May 2004.
[23]http://www.vestas.dk/
[24]Y. Kazachkov, J. W. Feltes, R. Zavadil, “Modeling Wind Farms for Power System Stability Studies,” IEEE Power Engineering Society Summer Meeting, Vol. 3, July 2003.
[25]江榮城、張嘉文、陳清嚴,「風力廠址規劃與併聯衝擊評估」,電機技師會刊,第一百一十三期,第72∼84頁,民國九十四年。
[26]台灣電力公司再生能源發電系統併聯技術要點,台灣電力公司,民國九十一年。
[27]楊昇霖,「風力發電系統之暫態分析」,碩士論文,國立台灣科技大學,民國九十四年。[28]輸電系統規劃準則,台灣電力公司,民國八十七年。
[29]台灣電力公司,「尖山發電廠機組頻率反應特性及最佳運轉模式之研究」,民國九十三年十二月。
[30]張偉能、江榮城,「風場之系統暫態穩定度衝擊模擬」,第二十六屆電力研討會,第199∼204頁,民國九十四年。
[31]台灣電力公司,「強化台灣電力系統穩定度研究」,民國九十三年七月。
[32]J. B. Ekanayake, L. Holdsworth, X. G. Wu, N. Jenkins, “Dynamic Modeling of Doubly Fed Induction Generator Wind Turbine,” IEEE Transaction on Power Systems, Vol. 18, No. 2, May 2003.