|
Abba, 1997. Earned value management: reconciling government and commercial practices. Program Manager. Bao, Y.K. , Liy, Z.T., Guo, L., & Wang, W. (2005). Forecasting Composite Index by Fuzzy Support Vector Machines Regression. In: Proceedings of Fourth International Conference on Machine Learning and Cybernetic (pp. 3535-3540). Guangzhou. Bilongo, R., Carbone, R. 2003 Adaptive model-based seasonal adjustment of time series : An Empirical Comparison with XII-ARIMA and SIGEX. International Journal of Forecasting Volume 1, Issue 2, 1985, Pages 165-177 Bojadziev, G., Bojadziev, M., 2007. Fuzzy logic for business, finance, and management, second ed. World Scientific, Singapore. Bolles, D., Fahrenkrog, S., 2004. A Guide to the Project Management Body of Knowledge (PMBOK Guide), 3rd Ed, Project Management Institute, Newtown Square. Chang, C. C., Lin., C.J., 2001. LIBSVM : a library for support vector machines, Software available at http://www.csie.ntu.edu.tw/~cjlin/libsvm Chakraborty, K., Mehrotra, K., Mohan, K., Ranka, S., 1992. Forecasting the behavior of multivariate time series using neural networks. Neural Networks Volume 5, Issue 6, November-December 1992, Pages 961-970 Chen , T. L., 2008. Estimate at Completion for Construction Projects using Evolutionary Fuzzy Neural Inference Model. MS Thesis, Department of Construction Engineering, National Taiwan University of Science and Technology, Taipei, Taiwan, (in Chinese). Cheng, M.Y., Peng, H.S., Wu, Y.W., Chen, T.L., 2010. Estimate at completion for construction projects using evolutionary support vector machine inference model, Automation in Construction 19, 619-629 Cheng, M.Y., Roy, A.F.V., 2010. Evolutionary fuzzy decision model for cash flow prediction using time-dependent support vector machines, International Journal of Project Management, article in Press. Cheng, M.Y., Tsai, H.C., Liu, C.L., 2009. Artificial intelligence approaches to achieve strategic control over project cash flows. Automation in Construction 18 (4), 386-393 Cheng, M.Y., Wu, Y.W., 2009. Evolutionary support vector machine inference system for construction management, Automation in Construction 18 (5), 597-604 Chou, J.S., Chen, H.M., Hou, C.C., Lin, C.W., 2010. Visualized EVM system for assessing project performance, Automation in Construction 19, 596–607. Christensen, D.S., 1993. Determining an accurate Estimate at Completion, National Contract Management Journal 25, 7-25 Christensen, D.S., Antolini, R.C., McKinney, J.W., 1995. A review of estimate at completion research. Journal of Cost Analysis and Management, 41-62. Deb, K., Goldberg, D.E., 1991. mGA in C: A Messy Genetic Algorithm in C. IlliGAL Technical Report 91008, Department of General Engineering, University of Illinois at Urbana-Champaign, Urbana, Illinois. Fan, H., Ramamohanarao, K., 2005. A weighting scheme based on emerging patterns for weighted support vector machines. In: Proceeding IEEE International Conference on Granular Computing, 2 (2), 435- 440 Feng, C. W., Wu, H.T., 2006. Integrated fmGA and CYCLONE to Optimize Schedule of Dispatching RMC Trucks. Automation in Construction 15,186-199 Gen, M., Cheng, R., 1997. Genetic Algorithms and Engineering Design. John Wiley & Sons, New York. Hussain, A., Knowles, A., Lisboa, P., El-Deredy, Al-Jumeily, 2008, Financial time series prediction using polynomial pipelined neural networks. Expert Systems with Applications: An International Journal Volume 35, Issue 3 (October 2008), 1186-1199 Ishigami, H., Fukuda, T., Shibata, T., Arai, F., 1995. Structure optimization of fuzzy neural network by genetic algorithm. Fuzzy Sets and Systems 71, 257-264 Jagdisha Hiray, 2008. Time-series methods of forecasting. All about Business and management. Kharbanda, O. P., 1980. Project cost control in action. Gower Publisher. Khemchandani R., Jayadeva, Chandra S., 2009. Regularized least square fuzzy support vector regression for financial time series forecasting. Expert System with Applications 36 (1), 132-138 Khosrowshahi, Farzad, Alani, Amir (2003). A model for smoothing time-series data in construction. Construction Management and Economics, 21: 5, 483 — 494 Klir, G. J., Yuan, B., 1995. Fuzzy sets and fuzzy logic: Theory and applications. Prentice Hall PTR, Upper Saddle River, New Jersey. Knight K., Fayek A.R., 2002. Use of Fuzzy Logic for Predicting Design Cost Overruns on Building Projects. Journal of Construction Engineering and Management, 128 (6), 503-512 Ko, C. H., 2002. Evolutionary Fuzzy Neural Inference Model (EFNIM) for Decision-Making in Construction Management, Ph.D. Thesis, Department of Construction Engineering, National Taiwan University of Science and Technology, Taipei, Taiwan. Kumar V. S. S., Reddy, G.C.S., 2005. Fuzzy logic approach to forecast duration in construction projects. In: Proceeding Construction Research Congress: Boarding Perspective, American Society of Civil Engineers. Li J., Moselhi O., Alkass S., 2006. Forecasting Project Status by Using Fuzzy Logic. Journal of Construction Engineering and Management 132 (11), 1193–1202. Lin, C.F., Wang, S.D., 2002. Fuzzy Support Vector Machines. IEEE Transactions on Neural Networks 13 (2), 464-471 Martinez, C., Castillo, O., Montiel, O., 2008. Comparison between Ant Colony and Genetic Algorithms for Fuzzy System Optimization. Soft Computing for Hybrid Intel. Systems. Springer-Verlag, Berlin Heidelberg. pp. 71-86. Muller, K., Smola, J., Ratsch, G., Scholkopf, B., Kolhmorgen, J., Vapnik,. V., 1997. Predicting time series with support vector machine. Proceedings of ICANN 97, Springer LNCS, p. 999-1004. Nicholas I. Sapankevych et al., 2009. Time Series Prediction Using Support Vector Machine A Survey, Computational Intelligence Magazine. Vol 4, No 2, p. 24-38. Schlkopf, B., Smola, A.J., 2002. Learning with Kernels: Support Vector Machines, Regularization, Optimization, and Beyond (Adaptive Computation and Machine Learning), Cambridge-Massachusetts: MIT-Press. Smola, A.J., Schölkopf, B., 2004. A tutorial on support vector regression, Statistics and Computing 14, 199-222 Tah, J.H.M., Carr V., 2000. A proposal for construction project risk assessment using fuzzy logic, Construction Management and Economics 18 (4), 491–500 Vandevoorde, S., Vanhoucke, M., 2005. A comparison of different project duration forecasting methods using earned value metrics, Vlerick Leuven Gent Working Paper Series 2005/16. Zeng, J, An, M., Smith, N.J., 2007. Application of a fuzzy based decision making methodology to construction project risk assessment. International Journal of Project Management 25, 589–600
|