With the liberation of utility regulation by government, cogeneration system has played a more important role than before. Instead of studying on the electrical operation, the purchase price is taken into account in this paper. According to regulation, a justified pricing system should consider both capacity avoided cost and energy avoided cost in the same time. These two subjects are elaborated so that price of electricity can be helpful for cogeneration enterprises. The capacity avoided cost is calculated by using the thermal power plant construction data of Taiwan Power Company and cogeneration plant. And energy avoided cost is estimated by calculating the incremental cost of Taiwan Power Company based on the economic dispatching. Finally, a comparison of the result and the existing purchase price has found that the existing purchase price appears higher. This pricing system should be improved in the future so as to meet the requirement of fair market competition.
|