論文名稱:國宅工程自動化營建管理系統與估價/估驗資訊整合模式建立
論文名稱(外文):Integrated Construction Information System
指導教授:鄭明淵鄭明淵引用關係
指導教授(外文):Min-Yuen Cheng
學位類別:碩士
校院名稱:國立台灣工業技術學院
系所名稱:營建工程技術研究所
學門:工程學門
學類:土木工程學類
論文種類:學術論文
論文出版年:1997
畢業學年度:85
語文別:中文
論文頁數:180
中文關鍵詞:結構化系統分析資料庫管理系統編碼連結地理資訊系統資訊傳遞工程估價
外文關鍵詞:Structural AnalysisDataBase SystemBar Code LinkGISData Flow DiagramCost Estimates
相關次數:
  • 被引用被引用:5
  • 點閱點閱:334
  • 評分評分:系統版面圖檔系統版面圖檔系統版面圖檔系統版面圖檔系統版面圖檔
  • 下載下載:0
  • 收藏至我的研究室書目清單書目收藏:2
本研究主要是針對國宅工程施工階段之工地資料管理,利用結構化之分析
方法,開發建置國宅工程營建管理系統,系統涵蓋日常工程管理作業所需
之功能模組,包括:預算編列、契約管理、圖說管理、發包定價、人事管
理、工地管理、日報管理、工程進度控制、預算執行控制、估驗計價及變
更設計十一個模組;然後再就工程估價/估驗資料整合傳遞模式作進一步
之分析探討,評估估價與估驗不同階段資料整合應用之可行性。
This research focuses on developing an integrated information
management system for construction site data management. Site
data collection and management is a daily and major construction
management task that can either enhance or adversely affect
construction efficiency. An effective site data management with
the aid of computer technology can not & 櫏 reduce the
repetitive works for data input, but also improve the
construction productivity. In the development of the system,
two major aspects of information management are concerned,
namely management of construction site data and data integration
of cost estimates with progress payment measuring.For
construction information management, the site data framework and
procedures for passing the data are identified using data flow
diagram and structural database analysis. Eleven system
functional modules including budget preparation, contract
administration, design drawings management, bidding and award,
personnel management, construction records, construction daily
reports, schedule controls, cost controls, measuring progress
payment, and change orders are developed for site management.
Integrating estimating data with progress payment measuring is
applied in this study to reduce the repetitive works for
quantity calculation. Traditionally, the detailed estimates is
conducted based on the detail design to calculate a careful
tabulation of all the quantities of the project. This research
creates a new way of thinking by integrating the graphical
features of detail design with the related estimating
quantities. The integrated information is used in construction
phase for measuring the progress payments. Using GIS, the
quantities of completed works can be input to the daily reports
by selecting the related graphic features and then, the monthly
or semimonthly payment quantities are obtained by summarizing
the daily reports. Moreover, the construction progress can be
represented in graphics with different colors.