中文參考資料
1.彭雲宏(民84),"集合住宅施工自動化個案研究",內政部建築研究所籌備處專題研究計畫成果報告編號: MOIS840002。
2. 彭雲宏(民88), "實質生產力績效調查與績效值標", 內政部建築研究所籌備處專題研究計畫
3. 廖慶樺(民87), "外勞管理與生產績效關係之研究", 國立台灣科技大學工程技術研究所建築設計學程碩士論 文4.先鋒新管理小組譯(民84),企業再造工程實踐法(Reengineering),渡邊純一 原箸, 合昌出版社
英文參考資料
Anglin, R. A. (1993). 'Just-in-Time, Applicability in Construction ', Thesis (M.S. in Engineering)-- University of Texas at Austin.
Bersnen, M. J., Wray, K., Bryman, A., Beardsworth, A. D., Ford, J. R. and Keil, E. T. (1985). 'The Flexibility of Recruitment in The Construction Industry: Formalisation or Re-casualisation?' Sociology, Vol. 19, No. 1 pp. 108-124.
Betts, M., Cher, L., Mathur, K., and Ofori, G. (1991). 'Strategies for the Construction Sector in the Information Technology Era ', Construction Management and Economics, No. 9 pp. 509-528.
Betts, M., and Ofori, G. (1992). 'Strategic Planning for Compeitve Advantage in Construction ', Construction Management and Economics, No. 10, pp. 511-532.
5. Cahoon, T. A. (1995). 'A Guide to the Implementation of Technology in the Construction Industry', Construction Congress, pp. 25-32.
6. Dilworth, J. M. (1993). Production and Operations Management: Manufacturing and Services 5th Edition, McGraw-Hill.
Hasegawa, F. and the Shimizu Group FS, Shimizu Corporation. (1988). Built by Japan : Competitive Strategies of the panese Construction Industry, John Wiley & Sons.
Helper, S. R. (1991). 'How Much Has Really Changed Between U.S. Automakers and Their Suppliers? ', Sloan Management Review, Summer, pp. 15-28.
Julian, Barling & Kevin, Kelloway(1998) Job and Work Design, A.T.O.B., London
Krajewski, Lee J.& Ritzman, Larry P. (1990), Operation Management Strategy and Analysis, Second Edition, Addison-Wesley Publishing Company.
Low, Sui-Pheng, and Chan, Yue-Meng. (1997). Managing Productivity in Construction: JIT Operations and Measurements, Ashgate.
Lubben, R. T. (1988). Just-In-Time Manufacturing: A Practical Approach, Mc Graw-Hill.
Maloney, W. F., and Hancher, D. E. (1997). 'Strategic Positioning for Improved Profitability for Engineering and Construction Organizations', Construction Congress 5th, pp. 92-101.
Miyatake, Y., and Kangari, R. (1993). ' Experiencing Computer Integrated Construction', Journal of Construction Engineering and Management, Vol. 119, No. 2, pp. 307-322.
Mullen, T. (1997). 'Build a Better Construction Company by Effectively Applying Continuous Process Improvement', Construction Congress 5th, pp. 149-155.
Pries, F., and Janszen, F. (1995). 'Innovation in the Construction Industry: the Dominant Role of the Environment', Construction Management and Economics, Vol. 13, pp. 43-51.
Saeki, N., and Notoya, T. (1996). ' Corrosion Protection of Reinforced Concrete Members by Using Recycled Steel ', Proceedings of the International Conference on Solid Waste Technology and Management, Nov 17-20 1996.
Salim, M., and Bernold, L. E. (1993). ' Placement-oriented Design and Delivery of Concrete Reinforcement', Journal of Construction Engineering and Management, Vol. 119, No. 2, pp. 323-335.
Salim, Md., and Bernold, L. E. (1994). 'Effects of Design-Integrated Process Planning on Productivity in Rebar Placement', Journal of Construction and Management, Vol. 120, No. 4, pp. 720-738.
Skibniewski, M. J. and Chao, Li-Chung (1998). 'Fuzzy Logic for Evaluating Alternative Construction Technology ', Journal of Construction Engineering and Management, Vol. 124, pp. 297-304.
Skibniewski, M. J. and Chao, Li-Chung (1992). 'Evaluation of Advanced Construction Technology with AHP Method', Journal of Construction and Management, Vol. 118, No. 3, pp. 577-593.
Tatum, C. B., and Mitropoulos, P. (1995). 'Process and Criteria for Technology Adoption Decisions', Construction Congress, pp. 17-24.
Tatum, C. B., and Nam, C. H. (1992). 'Strategies for Technology Push: Lessons from Construction Innovations', Journal of Construction Engineering and Management, Vol. 118, No. 3, pp. 507-524.
Tatum, C. B. (1988). 'Technology and Competitive Advantage in Civil Engineering', Journal of Professional Issues in Engineering, pp. 256-264.