Moselhi, Osama and Khaled El-rayes, ''Scheduling of
Repetitive Projects with Cost Optimization,'''' {\it
Journal of Construction Engineering and Management,
ASCE,} Vol. 119, No. 4, pp. 681-688 (December, 1993).
O''Brien, J.\ J., ''VPM Scheduling for High-Rise Buildings,''''
{\it Journal of the Construction Division, ASCE},
Vol. 101, No. CO4, pp. 895-905 (December, 1975).
Reda, Rehab M., ''RPM: Repetitive Project Modeling,''''
{\it Journal of Construction Engineering and Management,
ASCE,} Vol. 116, No. 2, pp. 316-330 (June, 1990).
Chehayeb, Nader N.\ and Simman M.\ AbouRizk,
''Simulation-Based Scheduling with Continuous Activity
Relationships,'''' {\it Journal of Construction
Engineering and Management, ASCE,} Vol. 124, No. 2,
pp. 107-115 (March, 1998).
郭斯傑、李岳能,「降雨因素影響下之工期預測」,
中國土木水利工程學刊,第十卷,第四期,第742-751頁,
民國八十七年。
Lumsden, P., ''The Line-of-Balance Method,''''
Pergamon Press Limited, London, p. 1 (1968).
O''Brien, James J., ''Scheduling Handbook,'''' McGraw-Hill,
New York, p.247 (1969).
Stradal, Oldrich and Josef Cacha, ''Time Space Scheduling
Method,'''' {\it Journal of the Construction Division, ASCE},
Vol. 108, No. CO3, pp. 445-457 (September, 1982).
Suhail, Saad A.\ and Richard H.\ Neale, ''CPM/LOB: New
Methodology to Integrate CPM and Line of Balance,''''
{\it Journal of Construction Engineering and Management,
ASCE,} Vol. 120, No. 3, pp. 667-684 (September, 1994).
Thabet, Walid T.\ and Yvan J.\ Beliveau,
''HVLS: Horizontal and Vertical Logic Scheduling for
Multistory Projects,'''' {\it Journal of Construction
Engineering and Management, ASCE,} Vol. 120, No. 4,
pp. 875-892 (December, 1994).
Thabet, Walid Y.\ and Yvan J.\ Beliveau, ''SCaRC:
Space-Constrained Resource-Constrained Scheduling System,''''
{\it Journal of Computing in Civil Engineering, ASCE,}
Vol. 11, No. 1, pp. 48-59 (January, 1997).
Khisty, C.\ J., ''The Application of the ''Line of Balance''
Technique to the Construction Industry,'''' {\it Indian
Concrete Journal,} Vol. 44, No. 7, pp. 319-320 (July, 1970).
Peer, Shlomo, ''Network Analysis and Construction
Planning,'''' {\it Journal of the Construction Division,
ASCE}, Vol. 100, No. CO3, pp. 203-210 (September, 1974).
Carr, Robert I. and Walter L. Meyer, ''Planning
Construction of Repetitive Building Units,''''
{\it Journal of the Construction Division, ASCE},
Vol. 100, No. CO3, pp. 403-412 (September, 1974).
蔣維夏,「線平衡法施工計劃簡介」,土木水利,第九卷,第一期 ,第23-29頁,民國七十一年。徐曾傑,「LSM管理方法於公路工程上之應用」,
中華工程技術期刊,第二期,第72-76頁,民國七十八年。
Lutz, James D.\ and Adib Hijazi, ''Planning Repetitive
Construction: Current Practice,'''' {\it Construction
Management and Economics,} Vol. 11, pp. 99-110 (1993).
Sebestyen, Gyula, ''Planning Repetitive Construction:
Comment,'''' {\it Construction Management and Economics,}
Vol. 11, pp. 487-488 (1993).
Johnston, David W., ''Linear Scheduling Method for Highway
Construction,'''' {\it Journal of the Construction
Division, ASCE}, Vol. 107, No. CO2, pp. 247-261
(June, 1981).
O''Brien, James J.\ and Fred C. Kreitzberg, and Wesley F. Mikes, ''Network Scheduling Variations for Repetitive
Work,'''' {\it Journal of Construction Engineering
and Management, ASCE,} Vol. 111, No. 2, pp. 105-116
(June, 1985).
Arditi, David and M.\ Zeki Albulak, ''Line-of-Balance
Scheduling in Pavement Construction,'''' {\it Journal of
Construction Engineering, ASCE}, Vol. 112, No. 3,
pp. 411-424 (September, 1986).
Chrzanowski, Edmund N.\ and David W.\ Johnston,
''Application of Linear Scheduling,'''' {\it Journal of
Construction Engineering, ASCE}, Vol. 112, No. 4,
pp. 476-491 (December, 1986).
Cole, L.\ J.\ R., ''Construction Scheduling: Principles,
Practices, and Six Case Studies,'''' {\it Journal of
Construction Engineering and Management, ASCE,} Vol. 117,
No. 4, pp. 579-588 (December, 1991).
Birrell, Georeg S., ''Construction Planning---Beyond
the Critical Path,'''' {\it Journal of the Construction
Division, ASCE}, Vol. 106, No. CO3, pp. 385-407
(September, 1980).
Thabet, Walid Y.\ and Yvan J.\ Beliveau, ''Modeling Work
Space to Schedule Repetitive Floors in Multistory
Buildings,'''' {\it Journal of Construction Engineering
and Management, ASCE,} Vol. 120, No. 1, pp. 96-116
(March, 1994).
Harmelink, David J.\ and James E.\ Rowings, ''Linear
Scheduling Model: Development of Controlling Activity
Path,'''' {\it Journal of Construction Engineering and
Management, ASCE,} Vol. 124, No. 4, pp. 263-268
(July, 1998).
Harris, Robert B.\ and Photios G.\ Ioannou, ''Scheduling
Projects with Repeating Activities,'''' {\it Journal of
Construction Engineering and Management, ASCE,} Vol. 124,
No. 4, pp. 269-278 (July, 1998).
Selinger, Shlomo, ''Construction Planning for Linear
Projects,'''' {\it Journal of the Construction Division,
ASCE}, Vol. 106, No. CO2, pp. 195-205 (June, 1980).
Russell, Alan D.\ and William F.\ Caselton, ''Extensions
to Linear Scheduling Optimization,'''' {\it Journal of
Construction Engineering and Management, ASCE,} Vol. 114,
No. 1, pp. 36-52 (March, 1988).
Moselhi, Osama and Khaled El-Rayes, ''Least Cost
Scheduling for Repetitive Projects,'''' {\it Canadian Journal
of Civil Engineeriing,} Vol. 20, No. 5, pp. 834-843 (1993).
Eldin, Neil N.\ and Ahmed B.\ Senouci, ''Scheduling
and Control of Linear Projects,'''' {\it Canadian Journal
of Civil Engineeriing,} Vol. 21, No. 2, pp. 219-230 (1994).
Senouci, Ahmed B.\ and Neil N.\ Eldin, ''Dynamic
Programming Approach to Scheduling of Nonserial Linear
Project,'''' {\it Journal of Computing in Civil Engineering,
ASCE,} Vol. 10, No. 2, pp. 106-114 (April, 1996).
Wang, Ching-Hwang and Yu-Chun Huang, ''Controlling
Activity Interval Times in LOB Scheduling,'''' {\it
Construction Management and Economics,} Vol. 16, pp. 5-16
(1998).
王慶煌、吳旻謙,「以多階段遞迴建立重複性工程排程規劃
模式」,中國土木水利工程學刊,第十卷,第一期,第17-30頁
,民國八十七年。
Ashley, David B., ''Simulation of Repetitive-Unit
Construction,'''' {\it Journal of the Construction Division,
ASCE}, Vol. 106, No. CO2, pp. 185-194 (June, 1980).
Kavanagh, Donncha P., ''SIREN: A Repetitive Construction
Simulation Model,'''' {\it Journal of Construction Engineering
and Management, ASCE,} Vol. 111, No. 3, pp. 308-323
(September, 1985).
Lutz, James D., Daniel W.\ Halpin and James R.\ Wilson,
''Simulation of Learning Development in Repetitive
Construction,'''' {\it Journal of Construction Engineering
and Management, ASCE,} Vol. 120, No. 4, pp. 753-773
(December, 1994).
Shi, Jingsheng and Simaan Abourizk, ''Continuous and
Combined Event-Process Models for Simulating Pipeline
Construction,'''' {\it Construction Management and Economics,}
Vol. 16, pp. 489-498 (1998).
Handa, V.\ K.\ and R.\ M.\ Barcia, ''Linear Scheduling Using
Optimal Control Theory,'''' {\it Journal of Construction
Engineering, ASCE}, Vol. 112, No. 3, pp. 387-393
(September, 1986).
Mattila, Kris G.\ and Duley M.\ Abraham, ''Resource
Leveling of Linear Schedules Using Integer Linear
Programming,'''' {\it Journal of Construction
Engineering and Management, ASCE,} Vol. 124, No. 3,
pp. 232-244 (May, 1998).
Dressler, Joachim, ''Stochastic Scheduling of Linear
Construction Sites,'''' {\it Journal of the Construction
Division, ASCE}, Vol. 100, No. CO4, pp. 571-587 (December,
1974).
Sarraj, Zohair M.\ Al, ''Formal Development of
Line-of-Balance Technique,'''' {\it Journal of Construction
Engineering and Management, ASCE,} Vol. 116, No. 4,
pp. 689-704 (December, 1990).
Vorster, Michael C.\ and Tarun Bafna, ''Formal Development
of Line-of-Balance Technique: Discussion,''''
{\it Journal of Construction Engineering and Management,
ASCE,} Vol. 118, No. 1, pp. 210-211 (March, 1992).
Kleinfeld, Ira H., ''Manpower Use in High-Rise Residential
Construction,'''' {\it Journal of the Construction Division,
ASCE}, Vol. 102, No. CO2, pp. 379-383 (June, 1976).
Perera, Srilal, ''Resource Sharing in Linear
Construction,'''' {\it Journal of Construction Engineering
and Management, ASCE,} Vol. 109, No. 1, pp. 102-111
(March, 1983).
El-Rayes, Khaled and Osama Moselhi, ''Resource-Driven
Scheduling of repetitive Activities,'''' {\it Construction
Management and Economics,} Vol. 16, pp. 433-446 (1998).
Schoderbek, Peter P.\ and Lester A.\ Digman, ''Third
Generation, PERT/LOB,'''' {\it Harvard Business Review,}
Vol. 45, No. 5, pp. 100-110 (September, 1967).
王慶煌、吳旻謙、方炤琮、黃裕鈞,「以直接成本分配為基礎建立
營建工期最佳化模式」,中國土木水利工程學刊,第十卷,
第四期,第731-741頁,民國八十七年。
王慶煌、黃裕均、吳旻謙,「以時間分配為基礎解析營建工期與
直接成本最佳組合問題」,中國土木水利工程學刊,第七卷,
第四期,第511-521頁,民國八十四年。
Ostwald, P.\ E., {\it Engineering Cost Estimating},
Prentice Hall, New Jersey, pp. 352-354(1992).
Pilcher, R., {\it Project Cost Control in Construction},
Willion Collins Sons \& Co., London, pp. 332-333(1985).