1. 孫恭先,1999,台灣橋樑衍進史略,台灣公路工程,26卷,1期,頁17-21,7月。
2. ----,1999,現代營建,230期,頁56-61,2月。
3. 秋惠生,1998,橋樑工程技術今與昔,營建管理季刊,188期,頁31-35,9月。
4. 俞何雄,1997,底價制度與最有利標之探討,中信通訊,206期,頁8-14,4月。5. 吳茂村,1998,工程採購發包介面點與成本預算控制,立基點實業出版社,台北。
6. F.H (Bud) Griffs, 1991, “Bidding Strategy : Winning over Key Comptitors”, Journal of Construction Engineering and Management, Vol. 118, No. 2, pp.151.
7. Liyin Shen, 1999, “Optimal Bid Model For Price-Time Biparameter Construction Contracts”, Journal of Construction Engineering and Management, Vol. 125, No.5, pp.204-209。
8. Zedan Hatush, 1998,”Contractor Selection Using Multicriteria Utility Theory: An Additive Model”, Building and Environment, Vol. 33, No. 2-3, pp. 105-115。
9. Gray D Holt, 1998, “Which Contractor Selection Methodology”, International Journal of Project Management, Vol. 16, No. 3, pp. 153-164。
10. Herbsman, Z. Chen, W.T.& Epstein, W.C, 1994, “Time is Money: Innovative Contraction Method in Highway Construction”, Journal of Construction Engineering and Management, Vol. 120, No.5, pp. 273~281。
11. Herbsman, Z, 1991, “A+B Bidding Method-Hidden Sussess Story for Highway Construction”. Journal of Construction Engineering and Management, Vol. 118, No.2, pp.142-150。
12. Photio G. Loannou and Sou-Sen Leu,1993, “Average Bid Method Competitive Bidding Strategy”, Journal of Construction Engineering and Management, Vol. 119, No.1, pp.131-147。
13. 謝浩明,1999,高速鐵路與中正機場間接駁系統選擇之研究,中國土木水利工程學刊,11卷,1期,頁121-130。
14. 李家慶,1997,招標階段糾紛處理方式,營建知訊,173期,頁105-109,9月。
15. 陳雅琪,1998,公共工程投標廠商資格審查之研究,國立台灣大學,碩士論文。16. 施毅明,1998,建築工程最有利標決標模式之研究以品質工期成本量化為重點,淡江大學,碩士論文。