1. Carr, R. I., Simulation of construction project duration, Journal of the Construction Division, CO2, pp.117-128, 1979.
2. AbouRizk, S. M. and Wales, R. J., Combined discrete-event/continuous simulation for project planning, Journal of Construction Engineering and Management, 123(1), pp.47-64, 1997.
3. Dawood, N., Estimating project and activity duration: a risk management approach using network analysis, Construction Management and Economics, 16, pp. 41-18, 1998.
4. Shi, J. J., A neural network based system for predicting earthmoving production, Construction Management and Economics, 17, pp.463-471, 1999.
5. J.H.M TAH and V.CARR, A proposal for construction project risk assessment using fuzzy logic, Construction Management and Economics,18, pp.491-500, 2000.
6. 郭斯傑,李岳能,「降雨因素影響下之工期預測」,中國土木水利工程學刊,第十卷,第四期,10,4,pp.743-751,1998。7. 張順傑,「以模糊推論解析降雨對道路施工作業時間之影響」,國立台灣科技大學營建工程研究所,民國89年。8. Zhang, G. and Hu, M. Y., Neural network forecasting of the British Pound/US Dollar exchange rate, Omega, 26, pp. 495-506, 1998.
9. 「施工標準規範」,交通部台灣區國道高速公路局,民國76年3月。
10. Braja M. Das., Introduction to soil mechanics, Ames :Iowa State University Press, 1979.