參考文獻
1.Campbell.H.G.,Dudek,R.A. and Smith.M.L.,1970,”A heuristic Algorithm for n-job,m-machine sequencing. problem”,Management Science,Vol.16,pp.B630-B637.
2.Ho,J.C.,1995,”Flowshop Sequencing with mean flowtime objective”,European Journal of Operational Research,Vol.81, pp.571-578.
3.Baker,K,R.,Introduction to Sequencing and Scheduling,John Wiley and Sons,Inc.,New York,1974.
4.Gelders ,L.F.and Sambandam,N.,1978,”Four simple heuristics for scheduling a flow shop”,International Journal of Production Research,Vol.16,pp.221-231.
5.Murata,T.,Ishibuchi,H., and Tanak H., Computers and Industrial Engineering.
6.Cheng,R.Gen,M.Tsujimura,Y.,1999,”A tutorial survey of job-shop scheduling problems using Genetic Algorithms,partII:hybrid genetic search strategies.”,Computers and Operations Research, Vol.36, pp.343-364.
7.鄧振源,曾國雄 (1989a)層級分析法(AHP)的內涵特性與應用(上),中國統計學報,27(6),頁6-22。8.Belten,V.&Gear,A.E.(1985),”The Legitimacy of Rank Reversal-A Comment”,Omega,Vol.13,NO.3,pp.227-230.
9.張有恆,徐村和(1993),模糊度量AHP法-交通運輸計劃評估新模式,中華民國第一屆模糊理論與應用研討會,頁365-371。
10.何毓芬,”模糊理論與成本效益分析方法之整合運用”,國立交通大學交通運輸研究所碩士論文,民國89年6月。11.鄧浩敦,”基因演算法於排程問題之應用”,私立逢甲大學工業工程研究所碩士論文,民國89年1月。
12.陳建安,”整合類神經網路與遺傳演算法為輔之模糊神經網路於智慧型訂單選取之應用”,國立台北科技大學生產系統工程與管理研究所碩士論文,民國89年6月。13.吳彥輝,”運用模糊層級分析法與管理才能評鑑模式之研究”,國立中山大學人力資源管理研究所碩士論文,民國88年6月。14.王文俊(2001.9),認識Fuzzy,全華科技圖書股份有限公司。
15.陳德生,”基於基因演算法的標準元件排列置放”,私立逢甲大學資訊工程研究所碩士論文,民國89年6月。