|
參 考 文 獻 [1] Christiaanse W. R., “Short term load forecasting using general exponential smoothing,” IEEE Trans. on Power Applications and Systems, Vol. PAS-90, No. 2, pp. 900-910, 1972. [2] Gunst R. F. and Mason R. L., Regression analysis and its applications: A data-oriented approach, Dekker, New York, 1980. [3] Papalexopoulos A. D. and Hesterberg T. C., “A regression-based approach to short-term system load forecasting,” IEEE Trans. on Power Systems, PWRS, Vol. 5, No. 4, pp. 1535-1544, 1990. [4] Ho K. L., Hsu Y. Y., Chen C. F., Lee T. E., Liang C. C., Lai T. S., and Chen K. K., “Short term load forecasting of Taiwan power system using a knowledge-based expert system,” IEEE Trans. on Power Systems, Vol. 5, pp. 1214-1221, 1990. [5] Hagan M. and Klein R., “Off-line and adaptive Box and Jenkins models for load forecasting,” Proceedings of Lawrence Systems and Decision Science, Berkeley, 1977. [6] Hagan M. and R. Klein, “On-line maximum likelihood estimation for load forecasting,” IEEE Trans. on Systems, Man, and Cybernetics, Vol. SMC-8, No. 9, pp. 711-715, 1978. [7] Huang S. R., “Short-term load forecasting using threshold autoregressive models,” IEE Proc. Electric Power Application, Vol. 144, No. 5, pp. 477-481, 1997. [8] Hagan M. and Behr S. M., “The time series approaches to short-term load forecasting,” IEEE Trans. on Power Systems, PWRS, Vol. 2, pp. 785-791, 1987. [9] Heydt G., Khotanzad A. and Farahbakhshian N., “A method for the forecasting of the probability density function of power system loads,” IEEE Trans. on Power Applications and Systems, Vol. PAS-100, No. 2, pp. 5002-5010, 1981. [10] Lu Q. C., Grady W. M., Crawford M. M. and Anderson G. M., “An adaptive nonlinear predictor with orthogonal escalator structure for short-term load forecasting,” IEEE Trans. on Power Systems, Vol. PWRS-4, No. 1, pp. 158-165, 1989. [11] Bakirtzis A. G., Peprldls V., Klartzis S. J., Alezladls M. C. and Malssls A. H., “A neural network short term load forecasting model for the Greek power systems,” IEEE Trans. on Power Systems, Vol. 11, No. 2, pp. 858-863, 1996. [12] Connor J., Atlas L. E. and Martin D., “Recurrent neural networks and load forecasting,” Proc. of First International Forum on Applications of Neural Networks to Power System, pp. 211-215, 1991. [13] Dillon T. S., Sestito S. and Leuang S., “Short term load forecasting using an adaptive neural network,” International Journal of Electrical Power & Energy Systems, Vol. 13, No. 4, pp. 186-192, 1991. [14] Chen S. T., Yu D. C. and Moghaddamjo A. M., “Weather sensitive short term load forecasting using non-fully connected artificial neural networks,” IEEE Trans. on Power Systems, Vol. 7, No. 3, pp. 1098-1105, 1992. [15] Khotanzad A., Hwang R. C., Abaye A. and Maratukulam D., “An adaptive modular artificial neural network hourly load forecaster and its application at electric utilities,” IEEE Trans. on Power Systems, Vol. 10, No. 3, pp. 1716-1722, 1995. [16] Chow M. Y., Zhu J. and Tram H., “Application of fuzzy multi-objective decision making in spatial load forecasting,” IEEE Trans. on Power Systems, Vol. 13, No. 3, pp. 1185-1190, 1998. [17] Daneshdoost M., Lotfalian M., Bumroonggit G. and Ngoy J. P., “Neural network with fuzzy set-based classification for short-term load forecasting,” IEEE Trans. on Power Systems, Vol. 13, No. 4, pp. 1386-1391, 1998. [18] Dash P. K., Satpathy H. P. and Liew A. C., “A real-time short-term peak and average load forecasting system using a self-organizing fuzzy neural network,” Engineering Applications of Artificial Intelligence, Vol. 11, pp. 307-316, 1998. [19] Hwang R. C., Huang H. C. and Hsieh J. G., “Short-term power load forecasting by neural network with modified back-propagation learning algorithm,” IEEE Winter Power Meeting, Singapore, 2000. [20] 王進德. 蕭大全 , “類神經網路與模糊控制理論入門”,全華科技圖書股份有限公司,1999.
|