|
參考文獻董青雲,具瑕疵品與同質重製工作兩階段生產系統之最佳經濟批量研究,成功大學工業管理研究所碩士論文,民87。Agnihothri, S. R., and Kenett, R. S. 1995. The impact of defects on a process with rework. European Journal of Operational Research 80, 308-327.Akella, R., and Kumar, P. R. 1986. Optimal control of production rate in a failure prone manufacturing system. IEEE Transactions on Automatic Control 31, 116-126. Bieleckl, T., and Kumar, P. R. 1988. Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research 36, 532-541. Chern, C. C., and Yang, P. 1999. Determining a threshold control policy for an imperfect production system with rework jobs. Naval Research Logistics 46, 273-301.Groenevelt, H., Pintelon, L., and Seidmann, A. 1992a. Production lot sizing with machine breakdowns. Management Science 38, 104-123.Groenevelt, H., Pintelon, L., and Seidmann, A. 1992b. Production batching with machine breakdowns and safety stocks. Operations Research 40, 959-971.Hariga, M., and Ben-Daya, M. 1998. Note:the economic manufacturing lot-sizing problem with imperfect production processes:bounds and optimal solutions. Naval Research Logistics 45, 423-433. Heavey. C. 1993. The throughput rate of multistation unreliable production lines. European Journal of Operational Research 68, 69-89.Hong, Y., and Seong, D. 1993. The analysis of an unreliable two-machine production line with random processing times. European Journal of Operational Research 68, 228-235.Jensen, P. A., Pakath, R., and Wilson, J. R. 1991. Optimal buffer inventories for multistage production systems with failures. European Journal of Operational Research 51, 313-326.Johnson, L. A., and Montgomery, D. C., (1974), Operation Research in Production Planning, Scheduling, and Inventory Control, John Wiley & Sons, Inc.Kimemia, J., and Gershwin, S. B. 1983. An algorithm for the computer control of a flexible manufacturing system. IIE Transactions15, 353-362. Kim, C. H., and Hong, Y. 1997. An extended EMQ model for a failure prone machine with general lifetime distribution. International Journal of Production Economics 49, 215-223.Kim, C. H., and Hong, Y. 1999. An optimal production run length in deteriorating production processes. International Journal of Production Economics 58, 183-189.Kim, C. H., Hong, Y., and Chang, S. Y. 2001. Optimal production run length and inspection schedules in a deteriorating production process. IIE Transactions 33, 421-426. Klein, M. 1966. Markovian decision models for reject allowance problems. Management Science 12, 349-358.Lee, H. L., and Rosenblatt, M. J. 1987. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 33, 1125-1136.Lee, H. L., and Yano, C. A. 1988. Production control in multistage systems with variable yield losses. Operations Research 36, 269-278.Lee, H. L. 1992. Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework. Management Science 38, 1314-1328.Lee, S. D., and Rung, J. M. 2000. Production lot sizing in failure prone two-stage serial system. European Journal of Operational Research 123, 42-60. Levitan, R. E. 1960. The optimum reject allowance problem. Management Science 6, 172-186.Lin, C. S. 1999. Integrated production-inventory models with imperfect production processes and a limited capacity for raw materials. Mathematical and Computer Modelling 29, 81-89.Liu, J. J., and Yang, P. 1996. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 91, 517-527.Liu, B., and Cao, J. 1997. Production control of an unreliable manufacturing system under the assumption of no backlog. Mathematical Methods of Operations Research 46, 103-117.Maimon, O. Z., and Gershwin, S. B. 1988. Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines. Operations Research 36, 279-292. Makis, V. 1998. Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections. Naval Research Logistics 45, 165-186.Makis, V., and Fung, J. 1998. An EMQ model with inspections and random machine failures. Journal of the Operational Research Society 49, 66-76. Porteus, E. L. 1986. Optimal lot sizing, process quality improvement, and setup cost reduction. Operations Research 34, 137-144.Rosenblatt, M. J., and Lee, H. L. 1986. Economic production cycles with imperfect production processes. IIE Transactions 18, 48-55.Ross, S. M. (1996), Stochastic Processes, 2th ed., John Wiley & Sons, Inc. Sharifnia, A. 1988. Production control of a manufacturing system with multiple machine states. IEEE Transactions on Automatic Control 33, 620-625.Silver, E. A., Pyke, D. F., and Peterson, R. (1998), Inventory management and production planning and scheduling, 6th ed., John Wiley & Sons, Inc. Wang, C. H., and Sheu, S. H. 2001. Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system. Computers & Operations Research 28, 1093-1110. White, L. S. 1967. Bayes Markovian decision models for a multi-period reject allowance problem. Operations Research 15, 857-865.
|