參考文獻
1.蔡文鎗(1989),「圓柱型橋墩之沖刷研究」,國立成功大學水利及海洋工程研究所碩士論文。2.劉長齡、王自成(1990),「防沙壩魚梯佈置及進水口型之水理研究(二)」,農委會補助研究計畫總報告。
3.劉長齡、王自成(1991),「防沙壩魚梯佈置及進水口型之水理研究(三)」,農委會補助研究計畫總報告。
4.吳建民(1991),「泥沙運行學」,中國土木水利工程學會。
5.叢興魯(1992),「工程結構物局部沖刷之研究」,國立成功大學水利及海洋工程研究所碩士論文。6.郭丁元(1994),「表層隔板對橋墩沖刷保護之研究」,國立成功大學水利及海洋工程研究所碩士論文。7.邱銘鴻(1998),「隔板對泥沙導流及局部沖刷之試驗研究」,國立成功大學水利及海洋工程研究所碩士論文。8.陳逸勳(1999)「梯形渠道橋台局部沖刷與設置漸變段影響」,國立成功大學水利及海洋工程研究所碩士論文。9.石鎮源(2000),「隔板對泥沙導流形成底床局部沖淤之試驗研究」,國立成功大學水利及海洋工程研究所碩士論文。10.吳俊鋐(2000),「複合渠道設置漸變段的局部沖刷與流速分佈研討」,國立成功大學水利及海洋工程研究所碩士論文。11. P. A. Johnson, R. D. Hey, M. Tessier, and D. L. Rosgen(2001) “USE OF VANES FOR CONTROL OF SCOUR AT VERTICAL WALL ABUTMENTS” Journal of Hydraulic Engineering pp.772-778.
12.B. W. Melville(1991). “Local Scour At Bridge Abutments”. Journal of Hydraulic Engineering pp.615-631.
13.Siow-Yong Lim.”EQUILIBRIUM CLEAR-WATER SCOUR AROUND AN ABUTMENT” (1997) Journal of Hydraulic Engineering pp.237-243.
14.Asono, T., Odgaard, A. J. and Kennedy, J. F.(1984). “Prevention of Local Scouring at River-Bend by Iowa Vanes,” Journal of Hydroscience and Hydraulic Engineering, Vol. 2, pp.1-13.
15.Barkdoll, B. D., Ettema, R., Odgaard, A. J.(1999), “Sediment Control at Lateral Diversions:Limits and Enhancements to Vane Use,” Journal of Hydraulic Engineering,Vol. 125, No. 8, pp.862-870.
16.Barkdoll, B. D. , Hagen, B. L. and Odgaard, A. J. (1995). “Sediment Exclusion at Hydropower Intakes Using Submerged Vanes,” Waterpower-Proceedings of the International Conference on Hydropower, ASCE, Vol. 3, pp.1915-1924.
17. Liu. C. L. and Hwang. J. K. (1996). “Experimental Study on Surface Panel Effect to Flow Field and Bed Variation,” Proceedings of the Second International Conference on Hydrodynamics, Vol. 2, pp.1155-1159.
18.Discussion by Barkdoll, B.(1999), “Experimental Investigation of Flow Past Submerged Vanes,” Journal of Hydraulic Engineering,pp.896-898.
19.Drain, M. A. , Hotchkiss, R. H. , Hendrickson, M. C. and Holloway, R. E. (1995). “Hydraulic Model Investigation of Submerged Vanes for the Intake Structure at Fort Calhoun Station,” International Water Resources Engineering Conference- Proceedings, ASCE, Vol. 2, pp.1234-1238.
20.Fukuoka, S.(1989). “Groins and Vanes Developed Based upon a New Concept of Bank Protection,” Proceedings of the 1989 National Conference on Hydraulic Engineering, ASCE, pp.224-229.
21.Marelius, F.,Sinha, S. K. (2000), “Analysis of Flow Past Submerged Vanes,” Journal of Hydraulic Research, Vol. 38, No. 1, pp.65-71.
22.Marelius, F.,Sinha, S. K.(1998), “Experimental Investigation of Flow Past Submerged Vanes,” Journal of Hydraulic Engineering, Vol. 124, No. 5, pp.542-545.
23.Nakato, T. ,Ogden, F. L.(1998), “Sediment Control at Water Intakes Along Sand-Bed Rivers,” Journal of Hydraulic Engineering,Vol. 124, No. 6, pp.589-596.
24.Odgaard, A. J., Wang, Y.(1991), “Sediment Management With Submerged Vanes. I: Theory,” Journal of Hydroscience and Hydraulic Engineering, ASCE, Vol. 117, No.3, pp.276-283
25. Bruce. W. Melville(1997).”PIER AND ABUTMENT SCOUR : INTEGRATED APPROACH” Journal of Hydraulic Engineering,pp.125-136.