(1)Arnold J. R. Tony,“Introduction to Materials Managrment,”Second Edition, NJ : Printice-Hall, 1996.
(2)Dr. Donald P. Martin,“How Low The Law of Unanticipated Consequences can Nullify the Theory of Constraints the Case for Balanced Capacity in a Semiconductor Manufacturing Line, ”IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 380-385(1997).
(3)Dave Kyton, “Fab with-Reentrant-Bottleneck," IEEE/CPMT Intl Electrinics Manfacturing Technology Symposium, 352-357, 1998.
(4)John Konpka Walt Trybula,“Utilizing Production Data to Increase Factory Capacity," IEEE/CPMT Intl Electronics Manufacturing Technology Symposium, .292-294(1995).
(5)Pan Yirn-Sheng, Tseng Horng-Huei, Kuo Chun-Yen, Lin Jeng-Tyan,”Capacity Loss Control Method for Preventative Maintenance in IC Plant,” United States Patent 5940298, Aug. 17(1999).
(6)Schmenner, Roger W, “Service Operations Managrment,”NJ : Printice- Hall Edition, NJ, Printice-Hall(1996).
(7)SEMATECH, “Overall Equipment Effectiveness (OEE) Guidebook Revision 1.0, ”SEMATECH Technical Reports(1995).
(8)SEMI, “Standard for Definition and Measurement of Equipment Reliability, Availability, and Maintainability (RAM),”SEMI E10(1996).
(9)Semiconductor Industry Association(SIA),“The National Technology Roadmap for Semiconductors, ”Semiconductor Industry Association(SIA), 114-132(1997)
(10)Stephan J. Shea , John A. La Freniere,“Development and Implementation the Range Management System in a Multi-flow Fabricator,”, IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 398-404, 1997.
(11)Tokutaro Suzuki, “TPM in process industries, Productivity Press,”1-20, 363-378(1994).
(12)Tomohito Naakata, Koichi Matsui, Yasuhisa Miyake, and Kysaku Nishioka, “Dynamic Bottleneck Control in Wide Variety Production Factory, IEEE Transactions on Semiconductor Manufacturing,” Vol. 2. No. 3, pp.(1999)
(13)「製造業管理辭典」,達太顧問公司(1993)。
(14)馮鈺敏,指導教授 李榮貴,「慮晶圓製造廠整廠績效之組合式即時派工法則」,交通大學工業工程與管理學系,碩士論文(1996)。(15)財團法人中衛發展中心,「TPM簡介資料-Total Productive Maintenance」,財團法人中衛發展中心(1997)。
(16)李榮貴、吳鴻輝著,「限制驅導式現場排程管理技術」全華科技圖書(1998)。
(17)張盛鴻、馮鈺敏、馮鈺敏、杜瑩美,黃承龍與李榮貴,「以限制理論為基礎之晶圓製造廠派工法則」,中國工業工程期刊,第十六卷,第二期,209-220(1999)。
(18)吳振寧 指導教授 許棟樑 ,「台灣半導體廠設備管理指標模型建立與評比」,清華大學工業工程研究所論文(1998)
(19)吳鴻輝,林則孟與吳凱文,「限制驅導式管理系統於半導體封裝廠之應用」,中國工業工程期刊,第十六卷,第一期,13-37(1999)。
(20)鄭又達、陳盈彥 指導教授 許棟樑,「直線式生產瓶頸指分析研究」,清華大學工業工程系畢業專題(2000)。
(21)戴君彥,指導教授 陳建良,「晶圓製造動態因應狀態派工」,中原大學工業工程系,碩士論文(2000)。(22)李婉如,指導教授 李榮貴,「晶圓代工廠之機台當機影響即時估算法」,交通大學工業工程與管理學,碩士論文(2001)。(23)林正富,指導教授 許棟樑,「機台產能損失情況下之瓶頸站管理」,清華大學工業工程系碩士論文(2001)。(24)林則孟,「系統模擬理論與應用」,滄海書局,台中(2001)。
(25)黃承龍、張盛鴻、李榮貴,「頸漂移分析與對策之研究」,中國工業工程期刊,第十八卷,第四期,73-81(2001)。
(26)張盛鴻,張立賢與李榮貴,「晶圓製造廠之整合式生產控制方法」,中國工業工程期刊,第十八卷,第四期,73-81(2001)。
(27)陳家明、黃家祚、姜林杰祐、張逸輝,「系統模擬eM-Plant(SiMPLE++)操作與實務」,華泰書局,台北,27(2001)。