[1] 蔡坤河,壹765kV系統雷擊突波之數位模擬,清大電機工程研究所碩士論文,71年5月。[2] 陳南鳴、顏世雄、楊金石,雷擊突波對數位電驛的影響,台灣電力公司委託合作研究計畫期末報告,80年12月。
[3] 周至如、吳譯辯,接地系統雷突波特性及其影響研究,第二十屆電力工程研討會,第1270-1274頁。
[4] S. Yokoyama, K. Miyake, and S. Fukui, “Advance Observations of Lightning Induced Voltage on Power Distribution Lines(Ⅱ)”, IEEE Trans. on Power Delivery, Vol. 4, No. 4, October 1989, pp. 2196-2203.
[5] F. E. Menter, and L. Grcev, “EMTP-Based Model for Grounding System Analysis”, IEEE Trans. on Power Delivery, Vol.9 No. 4,October 1994, pp. 1838-1849.
[6] M. Ramamoorty, M. M. Babu Narayanan, S. Parameswaran and D. Mukhedkar, “Transient Performance of Ground Grid”, IEEE Trans. on Power Delivery, Vol. 4, 1989, pp. 2053-2059.
[7] H. W. Dommel and I. I. Dommel, “Transient Program User’s Mannual”, University of British Columbia, 1976, Revised, 1986.
[8] T. H. Lee, Surge, Insulation Coordination and Arrester Selection for NBEPC 230 and 345kV System, Lecture Notes, A Lecture presented at Taipower, Aug. 18, 1992.
[9] 陳耀賓,絕緣協調與避雷器,研討會講義,台灣愛波比公司主辦,90年。
[10] 安食浩司,軌道電氣環境技術研討會論文集,電力鐵路系統絕緣協調及電力鐵路系統異常電壓、雷害及鹽害,89年9月18、19日,第45-78頁。
[11] 持永芳文,軌道電氣環境技術研討會論文集,交流電力鐵路供電方式概要及電力鐵路接地系統89年9月18、19日,第1-44頁。
[12] 陳大岡,「GIS雷擊突波過電壓保護解析」,電機月刊,第11卷,第9期,90年9月,第199-213頁。[13] 周至如,「161kV高科技工廠接地問題檢討與改善對策」,電機月刊,第11卷,第11期,90年11月,第238-257頁。[14] 劉遠芬,木柵機廠雷擊,清大電機工程研究所碩士論文,90年5月。
[15] Insulation Coordination, Electrical Engineering Guide(EEG-17),A Report of Gibbs & Hill, Nov. 1976, Revision 1, Feb. 1980.
[16] 薛小生、黃郁東,工業配電,第十章系統過電壓保護,第10.2.2節進行波,大中國圖書公司,第18版,84年出版,第379-380頁。
[17] D. K. Cheng, Chapter 3, Section 10, Capacitance and Capacitors, in Field and Wave Electromagnetics, 2nd ed., Addison-Wesley, pp. 121-125.
[18] 持永芳文,牽引電力系統之問題與對策,國際高速鐵路技術研討會論文集,第A1~A3章,第1-01~1-64頁,87年12月10、11日。
[19] 席寶祥,穩態運轉下高速鐵路牽引電力系統之分析與設計,清大電機系博士論文,87年6月。[20] A. R. Hileman, “Insulation Coordination for Power System”, published by Marcel Dekker, Inc. of New York and Bascl, ISBN 0-8247-9957-7.
[21] Guide for The Application of Mental Oxide Surge Arresters for Alternating-Current System, IEEE Std. C62.22-1997.
[22] 高速鐵路牽引動力主變電站設計與越區饋電之影響評估,交通部高鐵局委託清大電機系研究計畫期中報告,90年11月21日。
[23] 台灣鐵路管理局幹線電化電務工程報告(上冊),第貳章電車線工程,第2-2節技術規範之制定,台灣鐵路管理局編印, 68年11月,第82-91頁。
[24] R. Natarajan, A. F. Imece, J. Popoff, and P. S. Meliopoulos, “Analysis of Grounding Systems for Electric Traction”, IEEE Trans. on Power Delivery, Vol. 16, No. 3, July 2001, pp. 389-393.
[25] CIGRE WG 33.10 & IEEE Task Force on TOV, Temporary Overvoltages:Causes, Effects, and Evaluation, CIGRE 33-210, 1990 Session.
[26] R. Klaus, Surges in High-Voltage Network, Plenum Press, 1980.
[27] The Principles and Practice of Insulation Co-ordination, CAN3-C308-M85, CSA, 178 Rexdale Boul., Rexdale, Ontario, CANADA, 1985.
[28] J. G. Anderson, and T. A. Short, “Algorithm for Calculation of Lightning Induced Voltage on Distribution Lines”, IEEE Trans. on Power Delivery, Vol. 8, Issue 3, July 1993, pp 1217-1225.
[29] S. Rusck, “Induced Lightning Over-Voltages on Power Transmission Lines with Special Reference to The Overvoltage Protection of Low Voltage Networks”, Trans. of Royal Institute of Technology, No. 120, Stockholm, Sweden, 1985.
[30] M. J. Master and M. A. Uman, “Lightning Induced Voltages on Power Lines:Theory”, IEEE Trans. on Power Apparatus and Systems, Vol. PAS-103, Sept. 1984, pp 2502-2518.
[31] A. Greenwood, “Electrical Transients in Power Systems”, 2nd ed., John Wiley, 1991.
[32] 持永芳文,手寫傳真資料,91年1月24日。
[33] 日本新幹線公司傳真資料(電車線),91年2月15日。
[34] 持永芳文,手寫資料,91年4月27日於台北市公務人力發展中心。