【1】E. K. Burke, A. J. Smith, ”Hybrid Evolutionary Techniques for the Maintenance Scheduling Problem”, IEEE Transactions on power systems, Vol. 15,NO. 1, pp. 122-128,2000.
【2】L. D. Chambers, ”Practical Handbook of Genetic Algorithms”, Boca Raton : CRC Press,1999.
【3】R. Cheng, M. Gen, Y. Tsujimura, ”A tutorial survey of job-shop scheduling problems using genetic algorithms-Ⅰ. Representation”, Computer Ind. Engeng, Vol. 30, No. 4 ,pp. 983-997,1996.
【4】R. Cheng, M. Gen, Y. Tsujimura, ”A tutorial survey of job-shop scheduling problems using genetic algorithms, part Ⅱ: hybrid genetic search strategies”, Computer & Industrial Engineering, Vol. 36, pp. 343-364,1999.
【5】R. Cheng, M. Gen, Y. Tsujimura, ”A tutorial survey of job-shop scheduling problems using genetic algorithms, part Ⅱ: hybrid genetic search strategies”, Computer & Industrial Engineering, Vol. 37, pp. 51-55,1999.
【6】E. Falkenauer, S. Bouffouix, ”A Genetic Algorithm for Job Shop”, Proceedings of the 1991 IEEE International Conference on Robotics and Automation , pp. 824-829,1991.
【7】M. Gen, R. Cheng, ”Genetic algorithms and engineering optimization”, New York: Wiley, 2000.
【8】M. Gen, Y. Tsujimura, E. Kubota, ”Solving Job-Shop Scheduling Problems by Genetic Algorithm ” , IEEE International Conference on, Vol. 2, pp. 1577-1582,1994.
【9】D. E. Goldberg, ”Genetic algorithms: in search, optimization and Machine learning”, Addision-Wesley Publishing Co.,1989.
【10】J. Holland, ”Adaptation in Natural and Artificial Systems”, University of Michigan Press, Ann Arbor, Michigan,1975.
【11】A.S. Jain, S. Meeran, ”Deterministic job-shop scheduling: Past, present and future”, European Journal of Research, Vol. 113, pp. 390-434,1999.
【12】D. C. Mattfeld, R. J. M. Vaessens, ”Job Shop Problem Test Instances Set”, <http://www.ms.ic.ac.uk/jeb/pub/jobshop1.txt >.
【13】S. G. Ponnambalam, N. Jawahar, B. S. Kumar, ”Estimation of Optimum Genetic Control Parameters for Job Shop Scheduling”, Int J Adv Manuf Technol, Vol. 19, pp. 224-234,2002.
【14】N. Sannomiya, H. Iima, K. Ashizawa, Y. Kobayashi, ”Application of Genetic Algorithm to a Large-Scale Scheduling Problem for a Metal Mold Assembly Process”, Proceeding of the 38th Conference on Design & Control, pp. 2288-2293,December 1999.
【15】Y. Tsujimura, Y. Mafune, M. Gen, ”Effect of Symbiotic Evolution in Genetic Algorithms for Job-Shop Scheduling”, Proceedings of the 34th Hawaii International Conference on System Sciences, pp. 1-7,2001.
【16】L. Wang, D. Zheng ,”An effective hybrid optimization strategy for job-shop scheduling problems”, Computers & Operations Research, Vol. 28, pp. 585-596,2001.
【17】王培珍,應用遺傳演算法與模擬在動態排程問題之探討,中原大學工業工程研究所,碩士論文,1996。【18】林我聰,現場排程專家系統─應用個體導向技術建立之研究,財團法人資訊工業策進會─資訊與電腦出版社,1994。
【19】許丕敏,工單式生產系統排程績效之比較─最小化總延遲時間,成功大學工業管理研究所,1999。
【20】陳宜欣,遺傳演算法在Job Shop排程問題上的研究,中央大學資訊管理研究所,1997。
【21】賴士葆,生產作業管理─理論與實務,華泰書局,1995。
【22】羅友廷,模糊多目標混合式遺傳演算法在零工式排程系統之應用,東海大學工業工程研究所,1999。
【23】蕭義梅,遺傳演算法應用在零工式工廠生產排程之應用,元智大學工業工程研究所,1999。
【24】蘇木春、張孝德,機器學習:類神經網路、模糊系統以及遺傳演算法則,全華科技圖書股份有限公司,2000。