[1]Akinc, U., and G.M. Roodman,“A New Approach to aggregate
production planning,”IIE Transaction,18,pp.88-94,1986.
[2]Anthony, R. N., Fogarty, Planning and Control System: A
framework for analysis, Boston Mass: Harvard University
Graduate School of Business, 1965.
[3]Atherton, L. F., and R. W. Atherton, Wafer Fabrication:
Factory Performance and Analysis, Kluwer Academic
Publishers, 1995.
[4]Benson, R. F., Cunningham, S. P., and Leachman, R. C.,
“Benchmarking Manufacturing Performance in the Semiconductor
Industry,”Production and Operations Management, vol. 4, no.
3, Summer, 1995.
[5]Carlo Verellis, “Multi-plant production planning in
capacitated self-configuring two-stage serial systems,”
European Journal of Operational Research, 119, pp.451-460,
1999.
[6]Chu, S. C. K., “A mathematical programming approach towards
optimized master production scheduling,” International
Journal of Production Economics, Vol. 38, pp.269-270, 1995.
[7]DisplaySearch,http://www.displaysearch.com/。
[8]Glassey, C. R. and M. G. C. Resende, “Cloased-loop Job Shop
Release Control for VLSI Circuit Manufacturing, ”IEEE
Transactions on Semiconductor Manufacturing, Vol. 1, No. 1,
pp.26-46, 1988.
[9]Goldratt, E. M., Cox, J.,“The Goal─A Process of Ongoing
Improvement,”North River Press, 1992.
[10]H. Hillion, J, M. Porth, “Finite capacity flow control in
a multi-stage/ multi-product environment, ” International
Journal of production Research, 32(5), pp.1119-1136, 1994.
[11]Hillier, F. S., Lieberman, G. J., Introduction to
operations research, Sixth edition, Mc Graw-Hill, Inc.,
1995.
[12]Hilton Ronald W., Managerial Accounting, fourth edition,
Irwin McGraw-Hill, pp.628-632, 1999.
[13]Huang, H. W., “The Design of Architecture of Constraint-
Oriented Target Management System for Wafer Fabrication
Factories,” Proceeding of The Chinese Institute of
Industrial Engineers National Conference, 1997, Vol. 2,
pp.940-945, 1997.
[14]ILOG LTD., “ILOG Studio 3.1 User’s Manual,” ILOG LTD.,
2000.
[15]Jeong, B., S.-W. Kim, Y.-J. Lee, “An assembly scheduler
for TFT-LCD manufacturing,” Computers & Industrial
Engineering, 41, pp37-58,2001
[16]Jun Yang, Houmin Yan, Suresh P. Sethi, “Theory and
Methodology Optimal production planning in pull flow lines
with multiple products,” European Journal of Operational
Research,119, pp.582-604, 1999.
[17]Leachman, R. C., Hodges, D. A.,“Benchmarking Semiconductor
Manufacturing,”Integrated Reliability Workshop Final
Report, pp.1-6, 1997.
[18]Little, J. D. C., “A Proof for the Queueing Formula: L=λ
W,”Operatons Research, Vol.9, pp.383-387, 1961.
[19]Liu, C., S. Thongmee, and P. Hepburn, “A methodology for
improving on-time delivery and load leveling starts,” 1995
IEEE/SEMI Advanced Semiconductor Manufacturing Conference,
pp. 95-100, 1995.
[20]Martin, D. P., “How the Law of Unanticipated Consequences
can Nullify the Theory of Constraint: The Case for Balanced
Capacity in a Semiconductor Manufacturing Line,”
Semiconductor FABTECH, Seventh Edition, pp.29-34, ICG
publishing Ltd,1998.
[21]McClain, J.O., and L. J. Thomas, “Horizon effects in
aggregate production planning with seasonal demand,”
Management Science, 23(7), pp.728-736, 1977.
[22]Nahk Hyun Sung, Jae Kyu Lee, Knowledge assisted dynamic
pricing for large-scale retailers, Decision Support Systems
28, pp.347-363,2000.
[23]Silver, E. A., D. F. Pyke, and R. Peterson, Inventory
Management and Production Planning and Scheduling, and R.
Peterson, Decision Systems for Inventory Management and
Production Planning, NY: John Wiley and Sons Inc, 3rd
Edition, pp.545, 1998.
[24]Srikanth, M. L., Umble, M. M.,“Synchronous Management─
Profit-Based Manufacturing for the 21st Century,”The
Spectrum Publishing Company, 1997
[25]Srivatsan, N. and K. Kenpf, “Effective Modeling of Factory
Throughput Times,” 1995 IEEE/CPMT International
Electronics Manufacturing Technology Symposium, pp.377-383,
1995.
[26]Thierry, C., Besnard, P., Ghattas, D., Bel, G.,“Multi-Site
Planning:Non Flexible Production Units and Set-Up Time
Treatment,”Emerging Technologies and Factory Automation,
1995. ETFA ''95, Proceedings, Vol. 3, pp.261-269, 1995.
[27]Thomas Corbett, Throughput Accounting: TOC’s Management
Accounting System, The North River Press Publishing
Corporation, Great Barrington, MA, 1998.
[28]Thomas E. Morton, David W. Pentico, Heuristic Scheduling
Systems, Wiley Interscience, 1993.
[29]Vollmann, T. E., W. L. Berry, and D. C. Whybark,
Manufacturing Planning and Control Systems, Richard D.
Irwin, Inc., 1992.
[30]Wild, R., “Mass - production Management,” The design and
Operation of Production Flow-Line Systems, John Wiley and
Sons, New York.
[31]中山大學科學材料所,「液晶顯示器-材料學會網頁競賽作品」,
http://www.mse.nsysu.edu.tw/~fcj/lcd/。
[32]元智大學液晶光電研究所,「我國液晶產業概況」,
http://140.138.140.197/。
[33]王世欽,「多廠區生產系統之訂單分配模式-以液晶顯示器產業為
例」,東海大學工業工程研究所,碩士論文,民國91年。
[34]王立志,「系統化運籌與供應鏈管理」,滄海書局,1999年。
[35]田志豪,趙中興,「顯示器原理與技術」,全華出版社,1998年11
月。
[36]光電產業自動化檢測技術專題,「理論篇:LCD製程」,
http://cslin.auto.fcu.edu.tw/eduteach/index.html。
[37]吳逸蔚、陳勁志,「平面顯示技術的明日之星--低溫複晶矽薄膜電晶
體液晶顯示器」,零組件雜誌,頁65-67,1999年6月。
[38]李國禎,「晶圓製造廠生產規劃模式之構建」,國立交通大學工業工程研究所,碩士論文,民國84年。
[39]周秀光,「液晶顯示器之顯示原理」,電子技術,頁82-88,1999年10月。
[40]周建佑,「台灣TFT-LCD面板製造廠之產能決策研究」,國立交通大
學工業工程研究所,碩士論文,民國88年。
[41]周煜智,「晶圓製造廠控制導向型生產活動控制系統之構建」,國立
交通大學工業工程與管理學系,碩士論文,民國87年。
[42]林文彬、念家富、辛哲宏、卓景生、麥彥全,「STN液晶顯示器之顯
示原理與生產製程」,科儀新知,頁32-45,2002年2月。
[43]胡振華,「光電產業明日之星-TFT-LCD產業分析」,大華證券,1999
年12月。
[44]張毓誠,「晶圓製造廠主生產排程之構建」,國立交通大學工業工程研究所,碩士論文,民國86年。
[45]莊佳蒨,「晶圓製造廠訂單抵換訂價機制之構建」,國立交通大學工業工程研究所,碩士論文,民國90年。
[46]郭乃蓁,「晶圓製造廠多廠間訂單抵換機制之構建」,國立交通大學
工業工程研究所,碩士論文,民國89年。
[47]郭志強,「TFT對我國相關產業的影響」,光電科技雜誌,1999年10
月。
[48]郭志強,陳主仁,「台灣TFT-LCD快步追趕」,光電科技雜誌,2000
年1月。
[49]陳春源,「非等效並聯機台之派工方法」,國立台灣大學工業工程研究所,碩士論文,民國85年。
[50]陳蓮春,「LCD彩色液晶顯示器原理與技術」,建興出版社,1999年5
月。
[51]陳蓮春,「什麼是液晶」,建興出版社,2000年6月。
[52]曾綜源,「封閉迴圈式主生產排程再排程策略之研究─以晶圓製造廠
為例」,國立交通大學工業工程研究所,博士論文, 民國88年。
[53]黃宏文,「晶圓製造廠區段基礎式週期時間估算法」,國立交通大學工業工程與管理學系,博士論文,民國91年。
[54]黃東茂,「LCD構裝製程設備技術發展簡介況」,機械工程,頁62-64,2001年2月。
[55]黃東茂,「LCM構裝設備技術」,機械工程,頁52,2000年6月。[56]黃信勳,「TFT-LCD最適化生產決策-以中小尺寸面板為例」,國立清
華大學工業工程研究所,碩士論文,民國89年。
[57]葉仰哲,「我國液晶顯示器材料與零組件產業現況」,化工資訊,頁
29-35,2001年2月。
[58]詹偉順,「晶圓製造廠生產績效指標關係模式之構建」,國立交通大
學工業工程研究所,碩士論文,民國86年。
[59]廖素君,「繼半導體之後的重量級產業--TFT-LCD產業現況探討」,
網路資訊,頁55-58,2001年11月。
[60]劉永光,「TFT-LCD製造設備概述」,機械工業,頁214-224,1998年3月。
[61]賴欣瑜,「晶圓製造廠多廠間生產規劃模式之構建」,國立交通大學工業工程研究所,碩士論文,民國89年。
[62]戴于婷,「TFT-LCD廠之生產規劃及排程系統之構建」,國立交通大
學工業工程研究所,攻讀博士論文計畫書,民國91年。
[63]謝仲為,「先進規劃與排程系統應用於TFT-LCD產業之研究」,東海
大學工業工程研究所,碩士論文,民國91年。
[64]蘇昱彰,「新興晶圓代工廠生產規劃與排程系統之構建」,國立交通
大學工業工程研究所,碩士論文,民國87年。
[65]顧鴻壽,「光電液晶平面顯示器技術基礎及應用」,新文京開發出版
有限公司,2001年9月。