英文部份:
[Ader, 2001] M. Ader, Technologies for the Virtual Enterprise, http://www.e-workflow.org/downloads/gue-tec.pdf, 2001.
[Ash and Martin, 1999] Rofail Ash, and Tony Martin, Building N-Tier Applications with COM and Visual Basic 6.0, Wiley Computer Publishing, 1999.
[Balcerak and Dale, 1992] K.J. Balcerak, B.G. Dale, “Engineering change administration: the key issues”, Computer-Integrated Manufacturing Systems, Vol. 5(2), pp.125-132, 1992.
[Boumphrey et al., 1998] Frank Boumphrey et al., XML Application, Wrox Press Ltd., 1998.
[Boznak, 1993] R.G. Boznak, Competitive product development, Business One Irwin/Quality Press, Milwaukee, 1993.
[Clark and Fujimoto, 1991] K.B. Clark, and T. Fujimoto, Product Development Performance: Strategy, Organisation and Management in the World Auto Industry, Harvard Business School Press, Cambridge, MA, 1991.
[CIMData] CIMdata, http://www.cimdata.com, 2002.
[Devashish, 1998] W. Devashish, “Error Handling and Recovery for the ORBwork Workflow Enactment Service in METOR”, 1998.
[Diprima, 1982] M. Diprima, “Engineering change control and implementation considerations”, Production Inventory Management Journal, Vol. 23(Part 1), pp.81-87, 1982.
[Display, 1999] Display Devices ’98,”Display Industry In Taiwan”,1998/01-1999/03
[Eriksson and Penker, 2000] Hans-Erik Eriksson, and Magnus Penker, Business Modeling with UML, Business Patterns at Work, New York, John Wiley & Sons, Inc., 2000.
[Goldman et al., 1995] S. Goldman, R.N. Nagel, and K. Preiss, Agile Competitors and Virtual Organisations, Norstrand Reinhold, New York, 1995.
[Harhalakis, 1986] G. Harhalakis, “Engineering changes for made-to-order products: how an MRP II system should handle them”, Engineering Management International, Vol.4, pp.19-36, 1986.
[Hardwick et al., 1995] M. Hardwick, B.R. Dowine, M. Kutcher, and D. L. Spooner, “Concurrent engineering with data files”, IEEE computer Graphics Application, Vol. 15(1), pp.62-68, 1995.
[Hedge and Kekre, 1992] G.G. Hedge, S. Kekre, “Engineering changes and time delays: a field review”, International Journal of Production Economics, Vol.28, pp.341-352, 1992.
[Heineman and Councill, 2001] G.T. Heineman, and W.T. Councill, Component-Based Software Engineering: Putting The Pieces Together, Addison-Wesley, New York, 2001.
[Hollingsworth, 1994] D. Hollingsworth, “The Workflow Reference Model”, Workflow Management Coalition Technical Report TC00-1003, 1994.
[Huang and Mak, 1997] G.K. Huang, and K.L. Mak, “Computer aids for engineering change control”, Proceedings of International Conference on Computer-Aided Production Engineering, Poland, June 1997.
[Huang and Mak, 1999] G.Q. Huang, and K.L. Mak, “Current practices of engineering change management in UK manufacturing industries”, International Journal of Operations and Production Management, Vol. 19(1), pp.21-37, 1999.
[Huang et al., 2001] G.Q. Huang, W.Y. Yee, and K.L. Mak, “Development of a web-based system for engineering change management”, Robotics and Computer Integrated Manufacturing, Vol. 17, pp.255—267, June 2001.
[Kidd and Thompson, 2000] M.W. Kidd, and Thompson, “Engineering Design Change Management”, Integrated Manufacturing Systems, Vol. 11(1), pp.74-77, 2000.
[Koonce, 1995] D.A. Koonce, “Information model level integration for CIM systems: a unified database approach to concurrent engineering”, Computer Industry Engineering, Vol. 29(1-4), pp.647-651, 1995.
[Krishnamurthy and Law, 1995] K. Krishnamurthy, and K.H. Law, “Change management for collaborative engineering”, Computing in Civil Engineering, Vol. 2, pp.1110—1117, 1995.
[Maull et al., 1992] R. Maull, D. Hughes, and J. Bennett, “The role of the bill-of-materials as a CAD/CAPM interface and the key importance of engineering change control”, Computer Control Engineering Journal, pp.63-70, 1992.
[McKnight and Jackson, 1989] S.W. McKnight, and J.M. Jackson, “Simultaneous engineering saves manufacturing lead time, cost and frustration”, Industrial Engineering, Vol. 21(8), pp.25-27, 1989.
[McMahon and Browne, 1993] C. McMahon, and J. Browne, CAD/CAM: from Principles to Practice, Addison- Wesley, New York, 1993.
[MIL-STD-973] MIL-STD-973, Configuration Management, http://qa.pica.army.mil/stdz/MIL-STD-973/default.htm (see also http://www.mil-std-973.com), 2001.
[Nichols, 1990] K. Nichols, “Getting engineering changes under control”, Journal of Engineering Design, Vol. 1(1), pp.1-6, 1990.
[OMG, 1999] OMG - PDM Enabler Revision Task Force, “PDM Enablers V1.2 Revision Task Force Final Report”, http://www.omg.org/cgi-bin/doc?dtc/99-10-02, 1999.
[Pikosz and Malmqvist, 1998] P. Pikosz, and J. Malmqvist, “A comparative study of engineering change management in three Swedish engineering companies”, in: Proceedings of DETC’98, Paper No. DET’98/EIM-5684, Atlanta, GA, USA, http://hem.fyristorg.com/pikosz/, 1998.
[Pressman, 2001] Roger S. Pressman, Software Engineering: A Practitioner’s Approach, McGraw-Hill, 2001.
[Ranky, 1986] P. Ranky, Computer-Integrated Manufacturing, Prentice-Hall, 1986.
[Reidelbach, 1991] M.A. Reidelbach, “Engineering change management in long-leadtime environments”, Production Inventory Management Journal, Vol. 32(2), pp.84-88, 1991.
[Rouibah and Caskey, 2003] Kamel Rouibah, and Kevin R. Caskey, “Change management in concurrent engineering from a parameter perspective”, Computers in Industry, Vol. 50, pp.15-34, 2003.
[Royce, 1970] W. Royce, “Managing the Development of Large Software Systems: Concepts and techniques”, Proc. WESCON, August 1970.
[Saeed et al., 1993] I. Saeed, D.M. Bowen, and V.S. Sohoni, “Avoiding engineering changes through focused manufacturing knowledge”, IEEE Transaction Engineering Management, Vol. 40(1), pp.54-58, 1993.
[SID, 1999] SID, “Information Display”, Palisades Institute For Research Services, New York, 1998/07-1999/05.
[Soderberg, 1989] L.G. Soderberg, “Facing up to the engineering gap”, McKinsey Quarterly Spring, Vol.3, pp.3-23, 1989.
[Stark, 2001] J. Stark, & Associate, http://www.johnstark.com/ec001.html, 2001.
[Terwiesch and Loch, 1999] C. Terwiesch, and C.H. Loch, “Managing the process of engineering change orders: the case of the climate control system in automobile development”, Journal of Product Innovation Management, Vol.16, pp.160-172, 1999.
[Ullman, 1997] D. Ullman, “The Mechanical Design Process”, McGraw-Hill, New York, NY, 1997.
[Urban et al., 1994] S.D. Urban, J.J. Shah, M.T. Rogers, D.K. Jeon, P. Ravi, and P. Bliznakov, “A heterogeneous, active database architecture for engineering data management”, International Journal Computer Integrated Manufacturing, Vol. 7(5), pp.276-293, 1994.
[Urban et al., 1996] S.D. Urban, J.J. Shah, H. Liu, and M.T. Rogers, “The shared design manager, interoperability in engineering design”, Integrated Computer-aided Engineering, Vol. 3(3), pp.158-177, 1996.
[Vernadat, 1996] F.B. Vernadat, Enterprise Modeling and Integration : principles and applications, CHAPMAN & HALL, 1996.
[Watts, 1984] F. Watts, “Engineering changes: a case study”, Production Inventory Manage Journal, Vol. 25(Part 4), pp.55-62, 1984.
[WfMC, 1999a] Workflow Management Coalition, “Interface 1: Process Definition Interchange Process Model, version 1.1”, The Workflow Management Coalition Specification, October 1999.
[WfMC, 1999b] WfMC, “Workflow Management Coalition Terminology & Glossary”, http://www.wfmc.org/mainframe.htm, 1999.
[Wortmann et al., 1997] J.C. Wortmann, D.R. Muntslag, and P.J.M. Timmermans, Customer-Driven Manufacturing, Chapman & Hall, London, 1997.
[Wright, 1997] I.C. Wright, “A review of research into engineering change management: implications for product design”, Design Studies, Vol. 18(1), pp.33-42, 1997.
中文部份:
[王立志,89] 王立志,「虛擬機器與設備連線介面標準研究」,東海大學工業自動化中心,工業技術研究院分包學術機構研究報告,民國89年。
[李維,89] 李維,實戰Delphi 5.x : ADO/MTS/COM+專業程式設計篇,旗標出版社,民國89年。
[李維,91] 李維,實戰Delphi6/Kylix 2 : SOAP/Web Service程式設計篇,旗標出版社,民國91年。
[林耀欽,86] 林耀欽,「企業流程再造的利器-工作流程自動化的技術與管理」,資訊與電腦,第205期,民國86年。
[吳俊雄,88] 吳俊雄,「液晶顯示器產業專題報告」,經濟部IT IS計劃,民國88年。
[邱宏昇,89] 邱宏昇,「元件式電子商務應用架構」,軟體產業通訊,30期,民國89年10月。[施圍信,89] 施圍信,「聯盟同步工程之變更管理系統開發:以UML為基礎之方法」,國立成功大學製造工程研究所碩士論文,民國89年6月。[陳仁杰,83] 陳仁杰,「IDEF0功能模式與作業制成本制度之整合:以設計變更管理系統為例」,國立交通大學工業工程研究所碩士論文,民國83年6月。[陳世榮,84] 陳世榮,「設計變更管理系統參考模型-IDEF0、IDEF1及IDEF1X方法」,交通大學工業工程研究所碩士論文,民國84年6月。[陳哲閎,86] 陳哲閎,「Internet上一般化工作流程管理系統的設計與實作」,國立台灣大學資訊管理研究所碩士論文,民國86年6月。[陳茂成,90] 陳茂成,「ITIS產業回顧與展望系列之二2001平面顯示器產業回顧與展望」,工研院IEK-電子資訊組,民國90年12月。
[許嶽聖,87] 許嶽聖,「工作流程管理系統工作引擎模式建構之研究」,國防管理學院資源管理研究所碩士論文,民國87年6月。[參數科技,88] PTC Taiwan,「CPC 網路協同產品商務:產業新概念」, http://www.ptc.com/taiwan/news/news13.htm,1999。
[張裕益,90] 張裕益,UML使用手冊,博碩文化出版社,民國90年。
[黃昌意,83] 黃昌意譯,「資訊技術之效益評估與經營管理」,資訊與電腦出版社,43~59頁,民國83 年5 月。
[楊正甫,89] 楊正甫,物件導向分析與設計,松岡電腦圖書資料股份有限公司,民國89年。
[劉尚志,88] 劉尚志,「我國新興高科技製造業的競爭力與策略佈局:以TFTLCD產業發展為例」,科技發展政策報導,SR8810,民國88年。
[蕭勝遠,89] 蕭勝遠,「產品資料標準模型應用在工程變更流程之研究」,國立臺灣大學機械工程學研究所碩士論文,民國89年6月。