[1] Thomas E. Browne , Jr. Circuit Interruption , Marcel Dekker , Inc. 1984.
[2] T. M. McCauley, D. L. Pelfrey, W. C Roettger, C. E. Wood, “The Impact of Shunt Capacitor Installations on power circuit Breaker application,”IEEE Transactions on Power Apparatus and Systems, Vol. PAS-99, NO. 6, Nov/Dec 1980.
[3] Brian C. Furums, Robert M. Hasibar,“Design and Installation of 500KV Back-to-Back Capacitor,”IEEE Transactions on Power Delivery,Vol.7,No.2,April 1992.
[4] Sus S. Mikhail, Mark F. McGranaghan, “Evaluation of Switching Concerns Associated with 345 KV Shunt Capacitor Application , ” IEEE Transactions on Power Delivery, Vol. PWRD-1, NO2 , April 1986.
[5] 許明童,“虛功補償用並聯電容器組開關暫態之研究,” 國立台灣大學電機工程學研究所碩士論文,中華民國87年.[6] T. J. E. Miller ,“Reactive Power Control in Electric System, ”John Wiley & Sons Inc.,1982.
[7] R. W. Alexander,“Synchronous Closing Control for Shunt Capa- citors,”IEEE Transactions on Power Apparatus and System, Vol. PAS-104,No.9,sepember 1985.
[8] 劉國基,陳南鳴,“並聯電容器之電壓峰點同步加壓法,”中華民國第十八屆電力工程研討會,pp411~pp415,1997.
[9] IEEE surge Protective Devices Committee, “Impact of Shunt Capacitor Banks on Substation Surge Environment and Surge Arrester Application, ”TEEE Transactions on power Delivery, Vol.11, No. 4,October 1996.
[10] A. Sabot, C. Morin, C.Guillaume, A. pons, J. P. Tasine, G. Lo Pizzo, H. U. Morf, “A Unique Multipurpose Damping Circuit for Shunt Capacitor Bank Switching,”IEEE Transactions on Power Delivery, Vol.8,No.3,July 1993.
[11] M.F. McGranaghan, W.E. Reid, S.W. law, D.W. Gresham, “Over Voltage Protection of Shunt Capacitor Banks MOV Arresters,” IEEE Transactions on power Apparatus and System, Vol. PAS-103, No. 8 ,August 1984.
[12] L. Sluis,“Transients in Power System,”John Wiley & Sons Ltd,2001.
[13] 林秀水,邱垂彥,“161KV電容器開關恢復電壓及再襲過電壓,”
中華民國第十八屆電力工程研討會,ppl09~ppll3,1997.
[14] B. A. Kagalwala, N. G.. Butler,A. P. Rodriguez , and D. Smith, “Transient Analysis of Distribution Class Adaptive Var Compens- ators : Simulation and Filed Test Results ,”IEEE Trans.on Power Delivery , Vol. 10, No.2, April 1995.
[15] 張文恭,“配電電容器加壓暫態之探討,”中華民國第二十屆電力工程研討會,pp987~pp991,1999.
[16] D. F. Peelo, P Diamanti , R. Beauchemin , “Mitigaton of Circuit Breaker Transient Recovery Voltage Associated with Current Limmi- ting Reactor , ” IEEE Transactions on Power Delivery , Vol 11. No 2 , April 1996.
[17] L.Van der Slusis , A.L.J. Janssen , “Clearing Faults Near Shunt Capacitor Banks,” IEEE Transactions on Power Delivery , Vol. 5,No.3,July 1990.
[18] MATLAB Ver6.5 (R13).
[19]台灣電力公司,“台灣電力公司材料標準,” 中華民國九十二年八月.
[20] IEEE Std 18-1992, IEEE Standard for Shunt Power Capacitors.
[21] 台灣電力公司,“屋內線路裝置規則,” 中華民國九十年五月,第十一版.
[22] 聖儼,李名濱,王耀諄,許博淳“以改善功率因數來節約能源之現況探討,”台灣電力公司 92年度節約能源論文發表.
[23] IEEE C37.99-1990,“ IEEE Guide for the Protection of Shunt Power Capacitors Banks,”.
[24] NEMA CPI-1976,Shunt Capacitors。
[25] 阮齊宏,“ 變電工程原理,”台灣電力公司訓練所, 民國七十一年二月,PP444~478.
[26] 劉書勝,“ 工業配電,”,台北,徐氏基金會,民國八十五年.
[27] 江榮成,“電力品質實務(二) ”,台北,全華科技圖書公司,民國九十一年.
[28] 廖財昌,陳建賢,“ 11KV SC FUSE 經常熔斷研究,”台灣電力公司 85年度研究專題.
[29] 蘇文志,“應用阻抗演算法偵測靜態電容器組故障之研究,” 私立中原大學電機工程學研究所碩士論文,中華民國90年.[30] 江榮成,“電力品質實務(一) ”,台北,全華科技圖書公司,民國八十九年.
[31] R.C. Dugan, M.F. McGranaghan and H. W. Beaty,“ Electrical Power Systems Quality,”McGraw-Hill, New York ,1995 .
[32] 顏世雄,“ 避雷工程,” 經濟部工業局八十七年度工業技術人才培訓計劃講義, 民國八十七年三月.
[33] Allan Greenwood,“Electrical Transients in Power system,” second Edition, John Wiley & Sons Inc.,1991.
[34] IEEE C37.06-1987, AC High-voltage Circuit Breakers Rated on a Symmetrical Current Basis-preferred Rating and Related Required Capabilities.
[35] IEEE C37.012-1979, IEEE Application Guide for Capacitance Current Switching for Ac High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis.
[36] IEEE C37.99-1990, IEEE Guide for the Protection of Shunt Capa- citor Bank.