1. Ahmad, I., and Minkarah, I., 1988, “Questionnaire Survey on Bidding in
Construction”, Journal of Management in Engineering, ASCE, Vol. 114,
pp. 229-243.
2. Ahmad, I., 1990, “Decision-Support System for Modeling Bid/No Bid Decision
Problem’, Journal of Construction Engineering and Management, ASCE,
Vol. 116, pp. 595-607.
3. Akintola, Akintoye, 2000, “Analysis of factors influencing project cost
estimating practice”, Construction Management and Economics, Vol. 18,
pp. 77-89.
4. Carr, R. I., 1982, “General Bidding Model”, Journal of Construction
Engineering and Management, ASCE, Vol. 108, pp. 639-650.
5. Carr, R. I., 1983, “Impact of Number of Bidders on Competition”, Journal of
Construction Engineering and Management, ASCE, Vol. 109, pp. 61-73.
6. Chua, D. K. H., Li, D., 2000, “Key Factors in Bid Reasoning Model”, Journal
of Construction Engineering and Management, ASCE, Vol. 126, pp.
349-357.
7. Dozzi, S. P., AbouRizk, A. M., and Schroeder, S. L., 1996, “Utility-Theory
Model for Bid Markup Decisions”, Journal of Construction Engineering
and Management, ASCE, Vol. 122, pp. 119-124.
8. Friedman, L., 1956, “A Competitive Bidding Strategy”, Operations Research,
Vol. 4, pp. 104-112.
9. Fayek, A., 1998, “Competitive Bidding Strategy Model and Software System
for Bid Preparation”, Journal of Construction Engineering and
Management, ASCE, Vol. 124, pp. 1-10.
10. Gates, M., 1967, “Bidding Strategies and Probabilities”, Journal of
Construction Engineering and Management, ASCE, Vol. 93, pp. 75-115.
11. Gates, M. and A. Scarpa, 1974, “Reward-Risk Ratio”, Journal of Construction
Engineering and Management, ASCE, Vol. 100, pp. 521-531.
12. Gate, M., “1976, “Gates’ Bidding Model-A Monte Carl Experiment”, Journal of
Construction Engineering and Management, ASCE, Vol. 102, pp.
669-679.
13. Griffis, F. H., 1992, “Bidding Strategy: Winning Over Key Competitors”,
Journal of Construction Engineering and Management, ASCE, Vol.118,
pp. 151-165.
14. Ibbs, C. W., and K. C. Crandall, 1982, “Construction Risk: Multi-attribute
Approach”, Journal of Construction Engineering and Management, ASCE,
Vol.108, pp. 187-200.
15. King, M. and A. Mercer, 1987, “Note on a Conflict of Assumptions in Bidding
Models”, European Journal of Operational Research, Vol. 32, pp.
462-466.
16. Li., H., and Love, P. E. D., 1999, “Combining Rule-Based Expert Systems
and Artificial Neural Networks for Markup Estimation”, Construction
Management and Economics, Vol. 17, pp. 169-176.
17. Li, H., Shen, L. Y., and Love, P. E. D., 1999, “ANN-Based Markup Estimation
System with Self-Explanatory Capacities”, Journal of Construction
Engineering and Management, ASCE, Vol. 125, pp. 185-189.
18. Morin, T. L. and R. H. Clough, 1969, “OPBID: Competitive Bidding Strategy
Model”, Journal of Construction Engineering and Management, ASCE,
Vol.95, pp. 85-106.
19. Odusote, O. O., and Fellows, R. F., 1992, “An Examination of the Importance of Resource Considerations When Contractors Make Project Selection
Decisions”, Construction Management and Economics, Vol. 10,
pp.137-151.
20. Seydel, J. and Olson, D. L., 1990, “Bids Considering Multiple Criteria”,
Journal of Construction Engineering and Management, ASCE, Vol.116,
pp. 609-623.
21. Shash, A. A., and Abdul-Hadi, N. H., 1992, “Factors Affecting a Contractor’s
Markup size Decision in Saudi Arabia”, Construction Management and
Economics, Vol. 10, pp.415-429.
22. Shash, A. A., 1993, “Factors Considered in Tendering Decisions by Top UK
Contractors”, Construction Management and Economics, Vol. 11,
pp.111-118.
23. Stephen C. Ngai, Derek S. Drew, H. P. Lo, and Martin Skitmore, 2002, “A
theoretical framework for determining the minimum number of bidders in
construction bidding competitions”, Construction Management and
Economic, Vol. 20, pp. 473-482.。
24. 吳道生,1997,營建工程競標模式之研究,國立台灣大學,博士論文。25. 劉季蓓,2003,以市場競爭為導向之標價決定模式,國立高雄第一科技大學,碩士論文。
26. 王明德,吳道生,1997,5 月,「營建廠商競標利潤組成模式」,中國土木水利
工程學刊,第9 卷4 期,p. 695-705。
27. 吳清在,1998,5 月,「重大交通建設工程預算數與底價、決標價差距之研究」,
主計月報,第85 卷5 期,p. 24-33。
28. 莊春發,1996,1 月,「公共工程不同發包制度的研究」,經濟研究,34 期,
p. 47-72。
29. 陳景堂,2003,「統計分析SPSS FOR WINDOWS 入門與應用」,儒林圖書。
30. 周文賢,2002,「多變量統計分析SAS/SAT 使用方法」,智勝文化,台北。
31. 陳政華,2004,統包工程業主基本設計範圍之探討-以橋樑工程為例,國立高
雄第一科技大學,碩士論文。
32. 張正瑩,2003,公共工程施工期間社會成本量化分析之實證研究-以北部地區
道路舖面工程為例,中華大學,碩士論文。