1. 林則孟, 系統模擬-理論與應用, 滄海書局, 2001.
2. 林慈傑, “以遺傳演算法求解類運輸問題模式化的多廠訂單分配問題”, 臺灣大學工業工程學研究所碩士論文, 2002.3. 周哲維, “多廠區整體物料規劃”, 元智大學工業工程與管理學系研究所碩士論文, 2003.4. 陳子立, “以模擬為基礎之先進規劃與排程方法-以TFT-LCD產業模組廠為例”, 清華大學工業工程與工程管理研究所碩士論文, 2003.5. 陳永隆, “製鞋業相同平行機台搭配模具生產現場排程之研究”, 東海大學工業工程與經營資訊研究所碩士論文, 2002。6. 陳恩齊, “推式多廠區之生產規劃與排程-以TFT-LCD面板產業為例”, 清華大學工業工程與工程管理研究所碩士論文, 2004.7. 黃建中, “多廠區規劃與排程--以TFT-LCD廠為例”, 清華大學工業工程與工程管理研究所碩士論文, 2003.8. Bhatnagar, R., Chandra, P., and Goyal, S. K., “Models for Multi-Plant Coordination”, European Journal of Operational Research, 67, pp.141-160, 1993.
9. Bitran, G. R., Marieni, D., Noonan, J., “Introduction to multi-plant MRP”, Sloan School of Management, Working paper #1486-83, 1983.
10. Bruns, R. and Sauer, J. “Knowledge-Based Multi-Site Coordination and Scheduling”, In R.D. Schraft et al. eds., Flexible Automation and Intelligent manufacturing , New York: Begell House, 1995.
11. Carrie, A., Simulation of Manufacturing Systems, Wiley, 1986.
12. Derringer, G., and Suich, R., “Simultaneous optimization of several response variables”, Journal of Quality Technology, Vol. 12, No. 4, pp. 214-219, October 1980.
13. Fogarty, D. W., Blackstone, J. H. and Hoffmann, T. R., Production & Inventory Management, Second Edition, South-Western , 1991.
14. Fuyuki, M. and Inoue, I., “Due-Date-Conformance Oriented Production Scheduling in a Make-To-Order Production On a Basis of Backward/Forward Hybrid Simulation”, Journal of Japan Industrial Management Association, 46(2), pp.144-151, 1995.
15. Gnoni, M. G., Iavagnilio, R., Mossa, Mummolo, G., Di Leva, A., “Production Planning of a Multi Site Manufacturing System by Hybrid Model: A Case Study from the Automotive Industry”, International Journal of Production economics, 85, pp.251-262, 2003.
16. Guinet, A., “Multi-site planning: a transshipment problem”, International Journal of Production economics, 74, pp. 21-32, 2001.
17. Harland, C., “Supply chain operational performance roles”, Integrated Manufacturing System, 8(2), pp.70-78, 1997.
18. Hastings, N. A. J. and Yeh, C. H., “Bill of Manufacture”, Production and Inventory Management Journal, 33(4), pp.27-31, 1992.
19. Hoekstra, S. and Romme, J., Integral Logistic Structures: Developing Customer-Oriented Goods, First Edition , McGraw-Hill, 1992.
20. i2, “Supply Chain Key Model Definitions”, SCP Master Planning Technical Implementer Reference Manual.
21. Jang, Y. J., Jang, S. Y., Chang, B. M. and Park, J., “A combined model of network design and production/distribution planning for a supply network”, Computers & Industrial Engineering, 43, pp. 263-281, 2002.
22. Lampel, J. and Mintzberg, H., “Customizing Customization”, Sloan Management Review, Vol. 37, pp.21-30 , 1996.
23. Leachman, R. C., Benson, R. F., Liu, C., and Raar, D. j., “IMPReSS : An Automated Production-Planning and Delivery-Quotation System at Harris Corporation — Semiconductor Sector”, Institute for Operation Research and the Management Sciences, 1996.
24. Lee, Y. H., Kim, S. H. and Moon, C., “Production-distribution planning in supply chain using a hybrid approach”, Production Planning and Control, 13(1), pp. 35-46, 2002.
25. Metaxiotis, K., Psarras, J. and Askounis, D., “Building ontologies for production scheduling systems:towards a unified methodology”, Information Management and Computer Security, pp.44-50, 2001.
26. Moon, C., Kim, j., Hur, S., “Integrated process planning and scheduling with minimal total tardiness in multi-plants supply chain”, Computers & Industrial Engineering, 43, pp. 331-349, 2002.
27. Pape, C., “Constraint based scheduling:principles and application”, The institution of Electrical Engineers, 1996.
28. Ramasesh, R., “Dynamic Job Shop Scheduling: a survey of simulation research”, International Journal of Management Science, Vol. 18, No. 1, pp43-57, 1990.
29. Roux, W., Dauzere, P. S. and Lasserre, J. B., ”Planning and scheduling in a multi-site environment”, Production Planning & Control, 10(1), pp.19-28, 1999.
30. Sauer, J. and Appelrath, H. J., “Integrating Transportation in a Multi-Site Scheduling Environment”, Proceedings of the 33rd Hawaii International Conference on System Sciences, 2000
31. Simchi-Levi, D., Kaminsky, P. and Simchi-Levi, E., Design & managing the supply chain, McGraw-Hill, 2003.
32. Taal, M. and Wortmann, J. C., “Integrating MRP and finite capacity planning”, Production Planning & Control, 8(3), pp.245-254, 1997.
33. Thierry, G., Besnard, P., Ghattas, D., and Bel, G., “Multi-Site Planning:Non Flexible Production Units and Setup Time Treatment”, Proceedings of 1995 INRIA/IEEE Symposium, Volume: 3 , 10-13 Oct, 1995.
34. Timple, C. H., and Kallrath J., “Optimal Planning in Large Multi-Site Production Networks”, European Journal of Operational Research, 126, pp.422-435, 2000.
35. Vercellis, G., “Multi-plant production planning in capacitated self-configuring two-stage serial systems”, European Journal of Operation Research, 119, pp. 451-460, 1999.
36. Vollmann, T. E., Berry, W. L. And Whybark, D. C., Manufacturing Planning and Control Systems, Fourth Edition, McGrawHill Press, 1997.
37. Watson, E. F.,Medeiros, D. J. and Sadowski, R. P., “Generating Component Release Plans with Backward Simulation”, Proceedings of the 1993 Winter Simulation Conference, pp.930-938, 1993.
38. Watson, E. F., Medeiros, D. J. and Sadowski, R. P., “Order-release planning using variable lead times based on a backward simulation model”, International Journal of Production Research, 33(10), pp.2867-2888, 1995.
39. Watson, E. F., Medeiros, D. J. and Sadowski, R. P., “A Simulation-based Backward Planning Approach for Order-Release”, Proceedings of the 1997 Winter Simulation Conference, pp.765-772, 1997.