參考文獻
英文部分
1.Alwan, L. C. and Roberts, H. V. (1988). “Time-series modeling for statistical process control,” Journal of Business & Economic Statistics, Vol. 6, pp. 87-95
2.Anderson, EA., Diaz, J. (1996). “Using process control chart techniques to analyze crime rates in Housion,Texas,” Journal of Operational Research Vol.47, pp.871-881
3.Bagshaw, M. and Johnson, R. A. (1975). “The effect of serial correlation performance of CUSUM test 2,” Technometrics, Vol. 17, pp. 73-80
4.Benneyan, J C. (1999). “Statistical process control and selectable forecast calendars reduce GE aircraft engines’ parts inventory,” Production and Inventory Management Journal, third quarter, pp. 62-66
5.Benneyan, J C. (1998). “Statistical quality control methods in infection control and hospital epidemiology, Part 1: Introduction and basic theory,” Infection control and Hospital Epidemiology, Vol.19, No.3, pp. 194-214
6.Benneyan, J C. (1998). “Statistical quality control methods in infection control and hospital epidemiology, Part 2: Chart use, statistical properties and research issues,” Infection control and Hospital Epidemiology, Vol.19, No.4, pp.265-283
7.Crowder, S. V. (1989). “Design of exponentially weighted moving average schemes,” Journal of Quality Technology, Vol. 21, pp. 155-162
8.Crowder, S. V. and Hamilton, M. D. (1992). “An EWMA for monitoring a process standard deviation,” Journal of Quality Technology, Vol. 24, pp. 12-21
9.Gilbert, Kenneth. C., Kenneth Kirby, and Cheryl. R. Hild (1997). “ Charting autocorrelated data: Guidelines for practitioners,” Quality Engineering, Vol. 9, Issue. 3, pp. 367-382
10.Harris, T. J. and Ross, W. H. (1991). “Statistical process control procedures for correlated observations,” Canadian Journal of Chemical Engineering, Vol. 69, pp. 48-57
11.Hart, Marilyn. K. (1998). “Improving inventory accuracy using control chart,” Production and Inventory Management Journal, Vol. 39, Issue. 3, pp. 44-48
12.Hunter, J. S. (1986). “The exponentially weighted moving average,” Journal of Quality Technology, Vol. 18, pp. 203-210
13.Jiang, W., Tsui, K. L., and Woodall, W. H. (2000). “A new monitoring method: The ARMA chart,” Technometrics, Vol. 42, pp. 399-410
14.Kramer, H., and Schmid, W. (1997). “Control charts for time series,” Nonlinear Analysis, Vol. 30, pp. 4007-4016
15.Lucas J. M. and Saccucci M. S. (1990). “Exponentially weighted moving average control schemes: Properties and enhancements,” Technometrics, Vol. 32, No. 1, pp. 1-12
16.Lu, Chao-Wen., and Marion. R. Reynold (1999). “EWMA control charts for monitoring the mean of autocorrelated processes,” Journal of Quality Technology, Vol. 31, No. 2, pp. 166-188
17.Lu, Chao-Wen., and Marion. R. Reynold (2000). “Control chart for monitoring the mean and variance of autocorrelated processes,” Journal of Quality Technology, Vol. 31, No. 3, pp. 259-274
18.MacGregor, J. F. and Harris, T. J. (1993). “ The exponentially weighted moving variance,” Journal of Quality Technology, Vol. 25, pp. 106-118
19.Montgomery, D. C. and Mastrangelo, C. M. (1991). “Some statistical process control methods for autocorrelated data,” Journal of Quality Technology, Vol. 23, pp. 179-193
20.Montgomery D. C. and Mastrangelo C. M. (1995). “SPC with correlated observations for the chemival and process industries,” Quality and Reliability Engineering International, Vol. 11,pp. 79-89
21.Montgomery D. C. and Evelyn C. B. (2000). “Shift detection properties of moving centerline control chart schemes,” Journal of Quality Technology, Vol. 32,pp. 67-74
22.Pfohl, H. C., Oliver. Cullmann., and Wolfgang. Stolzle, (1999). “Inventory management with statistical process control: simulation and evaluation,” Journal of Business Logistics, Vol. 20, No. 1, pp. 101-121
23.Vasilopoulos, A. V., and Stamboulis, A. P. (1978). “Modification of control chart limits in the presence of data correlation,” Journal of Quality Technology, Vol. 10, pp. 20-30
24.Wardell, D. G. Moskowitz, H., and Plante, R. D. (1994). “Run length distributions of special-cause control charts for correlated processes,” Technometrics, Vol. 35, pp. 37-52
25.Watts, Charles. A., Chan, K. Hahn., and Sohn, Byung. Kyu. (1994). “Monitoring the performance of a reorder point system: A control chart approach,” International Journal of Operations & Production Management, Vol. 14, Issue. 2, pp. 51-61
26.Wiel, S. A. J., Tucker, W. T., Faltin, F. W., and Doganaksoy N. (1992). “Agorithmic statistical process control: concepts and an application,” Technometrics, Vol. 34, pp. 286-297
27.Zhang, N. F. (1998). “A statistical control chart for stationary process data.” Technometrics, Vol. 40, pp. 24-38
中文部分
28.方世榮,生產與作業管理,修訂版,五南出版社,民國 85 年。
29.李硯群,“零售商策略合作下之供應鏈存貨管理模式建構”, 國立台北科技大學生產系統工程與管理研究所碩士學位論文,民國九十年六月。30.巫沛倉與王治元,“供應鏈管理與系統模擬之整合-以3C零售業為例”, 科技與管理學術研討會論文集,民國九十一年,135-146頁。
31.林清河,物料管理,修訂版,華泰書局,民國84年。
32.張有恆,「物流管理」,華泰出版社,民國87年。
33.張駿逸,“一個新相關性製程變異監控方法之研究”,國立交通大學統計學研究所碩士論文,民國九十一年六月。34.詹易整,“應用統計製程管制方法於存貨管理系統之研究”,國立成功大學工業管理研究所碩士論文,民國八十九年六月。35.葉卓華,“應用管制圖於存貨管理之研究”,國立雲林科技大學工業工程與管理研究所碩士論文,民國九十一年六月。36.鄭春生,品質管理,修訂版,三民書局,民國 84 年。