參考文獻
[1].Wayne L. W., “Operations Research-Applications and Algorithms, ” Boston :PWS-KENT Publishing co.(1991).
[2].Pantumsinchai, T., and Knowles, W., “Standard container size discounts and the single-period inventory problem, ”Decision Sciences, Vol.22,pp.612(1991).
[3].Grubbstrom, R.W. and Erdem, A. “The EOQ with backlogging derived without derivatives,” International Journal of Production Economics, Vol.59, pp.529-530. (1999).
[4].Cardenas-Barron, L.E. “The economic production quantity (EPQ) with shortage derived algebraically”, International Journal of Production Economics, Vol.70, pp.289-292. (2001).
[5].Porteus, E. L., “Optimal lost size, process quality improvement and setup cost reduction”, Operations Research, Vol.34, No.1, pp.137
-144.(1986).
[6].Chung, K. J. and Hou, K. L., “An optimal production run time with imperfect production processes and allowable shortages,” Computers & Operations Research, Vol.30, pp.483-490. (2003).
[7].Paknejad, M. J., Nasri, F. and Affisco, J. F., “Defective unit in continuous review (S, Q) system,” International Journal of Production
Research, Vol.33, No.10, pp.2767-2777. (1995).
[8].Rosenblatt, M. J. and Lee, H. L., “Economic production cycles with
imperfect processes,” IIE Transactions, Vol.21,pp. 48-55. (1986).
[9].Chang, H. K. and Yushin, H., “An optimal production run length in deteriorating production processes,” International Journal of Production Economics, Vol.58, pp.183-189. (1999).
[10].Lee, H. M., and Yao, J.S., “Economic production cycles with imperfect production process,” IIE Transactions, Vol.18, pp.48-55, (1986).
[11].Chiu S. W., Chiu Y. P. and Wu B. Y., “An economic production quantity model with the steady production rate of scrap items”, 朝陽學報, Vol. 8 , pp.225-236. (2003).
[12].Chiu Y. P. and Chiu S. W., “A finite production model with random defective rate and shortages allowed backordered”, Journal of Information & Optimization Sciences, Vol.24, No.3, pp.553-567, (2003).
[13].Ouyang, L. Y., Yeh, N. C. and Wu, K. S., “Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time,” Journal of the Operational Research Society, Vol.47, No.6, pp.829-832. (1996).
[14].Steven Nahmias, “Production and operations analysis”, Fourth edition. (2001).
[15].Wee, H. M. and Mercan, H. M., “Exponentially decaying inventory with partial back-ordering,” Optimal Control Applications and Methods, Vol.2, No.1, pp.43-50. (1999).
[16].Wee, H. M., “Optimal inventory policy with partial backordering,” Optimal Control Applications and Methods, Vol.10, pp.181-187. (1989).
[17].Abad, P. L., “Optimal lot size for perishable good under conditions of finite production and partial backordering and lost sale ,” Computers & Industrial Engineering, Vol.38, pp.457-465. (2000).
[18].Chang, H. J. and Dye, C. Y., “An EOQ model for deteriorating items with time varying demand and partial backlogging,” Journal of Operational Research Society, Vol.50, pp.1176-1182. (1999).
[19].Montgomery, D. C., Bazarra, M. S. and Keswani, A. K., “Invenroty models with a mixture of backorders and lost sales,” Naval Research Logistics Quarterly, Vol.20, pp.255-263. (1973)
[20].Kalro, A. H. and Gohil, M. M., “A lot size model with backlogging when the amount received is uncertain,” Internal Journal of Production Research, Vol.20, No.6, pp.775-786. (1982).
[21].Zeng, A. Z., “A partial backordering approach to inventory control, ” Production Planning & Control, Vol.12, No.7, pp.660-668. (2001).
[22].Chiu Y. P., “Determining the optimal lot size for the finite production model with random defective rate, the rework Process, and backlogging”, Engineering Optimization, Vol.35, No.4, pp.427
-437.(2003).
[23].William J. Stevenson, “Operations Management”, Seventh Edition, pp.558-587.。
[24].Robert Ronald, Gino K. Yang, Peter Chu, “Technical note: The EOQ and EPQ models with shortages derived without derivatives,” International journal of production economics, Vol.92, pp.197-200.
(2004).
[25].Richard J. Tersine, “Principles of Inventory and materials
management”, Fourth Edition, pp.124-145.
[26].Harris, F., “How many parts to make at once? ”, The Magazines of Management, Vol.10, pp.135-153. (1913).
[27].Schwaller, R.L., “EOQ under inspection costs”, Production and Inventory Management, Vol.29, pp.22-24.(1998).
[28].Cheng, T. C. E., “An economic order quantity modal with demand
-dependent unit production cost and imperfect production process”,
IIE Transactions, Vol.23, No.1, pp.23-28(1991).
[29].Mehra, S., Agrawal, P., and Rajagopalan, M., “Some comments on the validity of EOQ formula under inflationary conditions”,
Decision sciences, Vol.22, pp.206(1991).
[30].Min, K. J., and Chen, C.-K., “A competitive inventory model with options to reduce setup and inventory holding costs.” Computers and Operations Research, Vol. 22, pp.503-514.(1995).
[31].Yanasse, H. H., “EOQ systems: the case of an increase in purchase cost.” Journal of the Operational Research Society, Vol.41, pp.633
-637.(1990).
[32].Randolth W. Hall, “On the integration of production and distribution: economic order and production quantity implications”, Transpn Res., Vol.30, No.5, pp.387-403.(1996).
[33].Salameh, M. K. and Jaber, M. Y., “Economic production quantity model for items with imperfect quality”, International journal of production economics, Vol.64, pp.59-64.(2000).
[34].R. L. Rardin, “Optimization in Operations Research, International edition”, Prentice-Hall, Inc. (1998).
[35].Robert Ronald, Gino K. Yang, Peter Chu, “The EOQ and EPQ models with shortages derived without derivatives” International journal of production economics, Vol.92, pp.197-200.(2004).
[36].賀照鈞,「考慮不完美品質及在兩個倉庫容量限制下之經濟生產批量模式」,碩士論文,國立台灣科技大學工業管理系,台北(2003)。[37].張宏吉,「可控制參數的連續性檢查存貨系統之研究」,博士論文,淡江大學管理科學系研究所,台北(1999)。[38].陳文芳,「考慮允許延後付款及倉庫容量有限情況下存貨模式之研究」,碩士論文,國立台灣科技大學工業管理系,台北(2001)。[39].黃宏仁,「在不完美品質下之模糊經濟生產批量排程問題模型」,碩士論文,長庚大學企業管理研究所,台北(2003)。[40].黃勇富,「在允許延後付歀情況下之確定性存貨系統的最佳補充策略」,博士論文,國立台灣科技大學工業管理系,台北(2002)。[41].黃自強,「服從韋伯分配的退化性商品在時變需求及缺貨部份待補假設下的存貨模型」,碩士論文,私立真理大學數理科學研究所,台北(2000) 。[42].蔡慧瑩,「可控前置時間的混合型常態分配需求量之混合存貨模型」,碩士論文,淡江大學統計學系研究所,台北(2000)。[43].蔡依齡,「允許部分欠撥下不完美生產系統之經濟批量」,碩士論文,真理大學管理科學系研究所,台北(2002)。[44].吳碧玉,「不完美品質生產系統之最佳經濟生產批量之探討」,碩士論文,朝陽科技大學工業工程與管理系研究所,台中(2003)。[45].趙皇傑,「在含不良品重工修復程序之生產環境下的重要分析」,碩士論文,朝陽科技大學工業工程與管理系研究所,台中(2004)。[46].林鴻志,「含服務水準限制式及訂購成本與前置時間有關之經濟訂購量模型」,碩士論文,淡江大學管理科學系研究所,台北(2002)。[47].林君諺,「流行性產品的存貨管理」,碩士論文,國立台灣科技大學工業管理系研究所,台北(1999)。[48].賴士葆著,「生產作業管理-理論與實務」,華泰書局,台北(1995)。