參考文獻
李乾銘(2000),可靠度技術的執行與策略,台北:財團法人中衛發展中心。
卓越光纖(2003),卓越光纖股份有限公司九十二年公開說明書,新竹:卓越光纖。
品管學會(1984),可靠度工程實務,台北:財團法人中衛發展中心。
陳鴻仁,鍾沛璟(2004),2003年光纖通訊產業及技術動態調查報告,台北:光電科技工業協進會。
設計審查小組(譯) (1987),設計審查,中壢:先鋒企業管理發展中心。原著:市田嵩、牧野鐵治著(1981),ヂザインレビュー,東京:株式會社日科技連出版社。
張書文(譯) (2001),實踐FMEA手法,台北:財團法人中衛發展中心。原著:小野寺勝重著(1998),グローバルスタンダード時代における実践FMEA手法,東京:株式會社日科技連出版社。
廖德銘(2003),光耦合器產品品質之發展,國立交通大博碩士論文。Bellcore(1999), Generic Reliability Assurance Requirements for Passive Optical Components—Issue 2,GR-1221-CORE, New Jersey :Bellcore .
Booker, J. D. (2003), “ Industrial practice in designing for quality ”, The International Journal of Quality & Reliability Management, 20(2): 288-303.
Carter, A.D.S. (1986), Mechanical Reliability, 2th ed. , London : Macmillan.
Chi, D.H. & Kuo, W. (1989),“Burn-in Optimization under Reliability & Capacity Restrictions”, IEEE Transactions on Reliability, 38(2):193-198.
Corso , M., Muffatto ,M. & Verganti ,R. , “ Multi-product Innovation: emerging policies in automotive, motorcycle and earthmoving machinery industries ” , EIASM 4th Product Development Management Conference, 205–218, Fontainebleau , (1996).
Dhillon, B.S. (1996) , Engineering Design: A Modern Approach , New York: McGraw-Hill.
Elsayed, E. A. (1996), Reliability Engineering, New York: Addison Wesley Longman.
English, J.R., Li, Y. & Lander, T. L., “A Modified Bathtub Curve with Latent Failures ”, Proceedings Annual Reliability and Maintainability Symposium, Washington ,217-222, USA (1995).
Epstein, G. A. , “ Tailoring ESS Strategies for Effectiveness and Efficiency ” , Proceedings Annual Reliability and Maintainability Symposium, Anaheim, 37-42 , USA (1998) .
Gustavson, D.,“ Design verification and production test:use them as tools for faster development”, WESCON/97.Conference Proceedings, 164-169 , Santa Clara, USA (1997).
Cheng, H. (2001), OGRT-FIT Calculation & Browave WBC & WDM FITs , Hsin-Chu : BROWAVE.
Hill, T. (2000), Manufacturing Strategy: Text and Cases , New York :Palgrave Macmillan .
Huang, G. Q. (2002), “ Web-based Support for Collaborative Product Design Review ”, Computers in Industry , 48: 71–88.
Hunt, J. E., Price, C. J. & Lee, M.H. (1993), “ Automating the FMEA process ”, Intelligent Systems Engineering , 2(2):119-132.
IEC (2001), Reliability of fibre optic interconnecting devices and passive components--Part 1 introductory guide and definitions IEC 62005-1, IEC .
IEC (2001), Reliability of fibre optic interconnecting devices and passive components—Part 2: Quantitative assessment of reliability based on accelerated ageing tests—Temperature and humidity; steady state—International Standard IEC 62005-2, IEC.
IEC (2001), Reliability of fibre optic interconnecting devices and passive components—Part 3 Relevant tests for evaluating failure modes and failure mechanisms for passive components—International Standard IEC 62005-3, IEC.
IEC (1999),Reliability of fibre optic interconnecting devices and passive components-- Part 4: Product screening—International Standard IEC 62005-4, IEC.
Lewis, E. E.(1996), Introduction to reliability engineering, New York : J. Wiley.
Li , Y., English, J.R. & Landers, T.L. (1995),“Modeling Latent and Patent Failures of Electronic Product”, Microelectronic and Reliability, 35(12):1501-1510.
Li, Y. & English, J.R. (1997),“ Economic cost Modeling of Environmental-Stress- Screening and Burn-In ” , IEEE Transactions on Reliability,46(2):275-282.
Liebe , J. H. (1996) ,“Spring Frontier dialogue: Special interest group on platform planning techniques. ”, Visions , 20:10–11.
McGrath, M. E. (1994), Product Strategy for High-Technology Companies: How to Achieve Growth, Competitive Advantage, and Increased Profits , Illinois:Irwin Professional Publishing.
Meeker, W.Q. & Hamada, M.(1995),“ Statistical Tools for the Rapid Development & Evaluation of High-Reliability Products”, IEEE Transactions on Reliability, 44: 187-198.
Meyer, M.H. & Lehnerd, A. P.(1997) , The power of product platforms: Building Value and Cost luship , New York : Free Press.
Minehane , S. , Duane, R. , O'Sullivan , P. , McCarthy , K. G. & Mathewson , A. (2000), “ Design for reliability ”, Microelectronics Reliability , 40: 1285-1294.
Mok, Y. L., & Xie, M., “ Planning and Optimizing Environmental Stress Screening ”, Proceedings Annual Reliability and Maintainability Symposium, 191-198 ,Las Vegas , USA (1996) .
Montgomery , T.A. , Pugh, D.R. , Leedham, S.T. & Twitchett, S.R.,“FMEA automation for the complete design process”, Proceedings Annual Reliability and Maintainability Symposium, ,30-36,Las Vegas , USA (1996).
Mortin , D. E. , Yukas, S. T. & Cushing, M. J. (2003) , “Five key ways to improve reliability ”, The Journal of the Reliability Analysis Center ,11(2):1-3.
Moss, R. Y. (1996), Handbook of reliability engineering and management , New York : McGraw Hill.
NEC Electronics Corp. (2003), Review of Quality and Reliability Handbook, NEC Electronics Corporation.
Oki Electric Industry Corp. (2004), 2004 Hand Book for Quality/Reliability, Oki Electric Industry Corporation.
Pikosz, P. & Malmqvist, J., “A Comparative Study of Engineering Change Management in Three Swedish Engineering Companies ” Proceedings of DETC'98 , Paper No DET98/EIM-5684, Atlanta, Georgia., USA, (1998).
PLX Technology(2000), Reliability and Test Handbook, PLX Technology .
Puente, J., Pino, R., Priore, p.& Fuente, D. (2002), “ A decision support system for applying failure mode and effects analysis ”, The International Journal of Quality & Reliability Management, 19(2): 137-150
Robertson, D. & Ulrich, K. (1998), “ Planning for product platforms ”, Sloan Management Review , 39(4):19–31.
Shishko , R. & Charmberlain, R. G. (1995) , NASA Systems Engineering Handbook , NASA
Simpson, T. W. , Maierm, J. R. A. & Mistree, F. (2001), “Product Platform Design: Method and Application ” Research in Engineering Design ,13(1): 2-22.
Sony Corp. Semiconductor Network Company Quality Assurance Department(2000) , Sony Semiconductor Quality and Reliability Handbook, Sony Corporation.
Stoica, S. (1999) ,“Generating Functional Design Verification Tests ”, Design & Test of Computers, IEEE , 16(3):53-63.
Stone, K.P. , Goldenberg, M. & Munikoti, R. ,“Field Reliability Enhancement of Electronic Modules Using ESS”, Electronic Components and Technology Conference, 99-107, Orlando, USA (1993).
Telcordia (2001), Generic Requirements for Passive Optical Components—Issue 3,GR-1209- CORE, New Jersey ,Telcordia .
Telcordia (2002), Telcordia Roadmap to Fiber and Optical Technologies Documents , New Jersey ,Telcordia.
Thompson , G. (1999), Improving maintainability and reliability through design , London , Professional Engineering Publishing.
Tichem, M., Andreasen, M. M., Riitahuhta, A. “ Design of Product Families ”, Int. Conf. on Engineering Design -ICED 99 , 1039-1042 , Munich, Germany (1999).
Toshiba Corp. (2002), Semiconductor Reliability Handbook (Discrete Device), Toshiba Corporation.
Wieland , P. O.(1994), Designing for Human Presence in Space-an Introduction to Environmental Control and Life Support System , NASA.