西文參考資料
註1. Walton, T., 1996, “Outsourcing Wisdom: Emerging Profiles in Design Consulting”, Design Management Journal, Vol. 7, No. 2, pp, 5-8.
註2. Minoli, D., Analyzing Outsourcing: Reengineering Information and Communication Systems, McGraw-Hill Inc., 1995.
註8. Wateridge, John. “Training for Is/It project managers: a way forward”, International Journal of Project Management, Vol.15, No.5, pp.283-288, 1997.
註12.Ughanwa, D. O. 1988, In Search of Design Excellence, Design Studies, Vol. 9, No. 4, October,pp. 219-222.
註13. Bangle, C., 2001, How BMW Turns Art into Profit, Harvard Business Review, Vol. 74, No. 1,pp. 47-55.
註14. Turner, B. T., 1968, Management of Design, Industrial and Commerical Techniques Ltd.,London.
註18. Galbraith, J. R. (1977). Organization Design. Addison-Wesley Publishing Company.
註19. Daft, R. L. (2001). Organization Theory and Design. 7th, South-Western Publishing Company.
註20. Gales, L., and Mansour-Cole, D.(1995). “ User Involvement in Innovation Project:Toward an Information Processing Model,” Journal of Engineering and Technology Management, Vol 12, 77-109.
註21. Sicotte, H., and Langley, A. (2000). “ Integration Mechanisms and R&D Project,”Journal of Engineering and Technology Management, Vol 17, 1-37.
註22. Christian, B., Jona s, S., and Christian, A. (2001). “Client , Contractors , and Consultants : The Consequences of Organizational Fragmentation in Contemporary Project Environments,”Project Management Journal, Vol 32, No3, 39-48.
註24. Daft, R. L. and Lengel, R. H. (1986). "Organizational Information Requirements, Media Richness and Structural Design." Management Science, Vol. 32, No. 5, pp. 554-571,
註25. Katz, D. and Kahn, R. L. (1978). The Social Psychology of Organizations. 2nd Edition.John Wiley and Sons.
註27. Keller, R. T. (1994). "Technology-information Processing Fit and the Performance of R&D Project Group: a Test of Contingency Theory." Academy of Management J., Vol. 37, No. 1, pp. 167-179.
註29. Mansuy, J. (1991) “Work Breakdown Structure:A Simple Tool for Complex Jobs.”Cost Engineering, 33(12), 15-18.
註30. Van de Ven A. H. and Drazin, R. (1985). "The Concept of Fit in Contingency Theory."in B. M. Staw and L. L. Cummings (eds.), Research in Organizational Behavior, Vol. 7,JAI Press, Greenwich, CT.
中文參考資料
註3. 傅振焜譯,1994;Drucker 著,1993。後資本主義社會(Post-Capitalist Society)。台北:時報文化。
註4. 知識經濟下的新型態組織管理,南華大學社會所 劉燕青
註5. 張美惠譯,1995;Bridge 著,1994。新工作潮(Jobshift: How to Prosper in a Workplace without Jobs)。台北:時報文化。
註11. 鄧成連,『設計管理—產品設計之組織、溝通與運作』,亞太圖書,1999
註15. 戴期甦、何純平,「設計管理的模式與技術」,營建管理季刊第45 期,第50~57頁,台北(2000)。註16. 鄧成連,“設計管理-產品設計之組織、溝通與運作”,亞太圖書出版社,台北,初版,1999 年4 月。
註17. 曾良傑,『設計機能展開在產品開發計畫之應用』,雲科大學工業設計系碩論,1997
註23.陳俊文,2000 年7 月,「工程師的工作型態」,國立成功大學土木工程研究所碩士論文。
註26. http://www.dsmc.dsm.mil/educdept/evm_dept.htm
註28. 崑山科技大學93年度跨院系科技整合專案,陳連福等人,2004年2~4月。