|
Bayindir, Z.P. , Erkip, N. and Gullu, R.(2002),“A model to evaluate inventory costs in a remanufacturing environment”,International Journal of Production Economics, 81-2, 597-607
Bogataj, M. and Bogataj, L.(2004),“On the compact presentation of the lead times perturbations in distribution networks”, International Journal of Production Economics, 88,145-155
Dobos, I.(2003),“Optimal production–inventory strategies for a HMMS-type reverse logistics system”,International Journal of Production Economics, 81–82, 351–360
Dobos, I. and Richter, K.(2004),“An extended production/recycling model with stationary demand and return rates”, International Journal of Production Economics, 90 (3), 311-323
Dowlatshahi, S.(2000),“ Developing a theory of reverse logistics”, Interfaces,30 (3), 143-155
Ferrer, G.(2001),“On the widget remanufacturing operation”, European Journal of Operational Research, 135, 373-393
Ferrer, G.(2003), “Yield information and supplier responsiveness in remanufacturing operations”, European Journal of Operational Research, 149, 540–556
Flapper, S.D.P. and Teunter, R.H.(2004),“Logistic planning of rework with deteriorating work-in-process”, International Journal of Production Economics, 88, 51-59
Georgiadis, P.and Vlachos, D.(2004),“The effect of environmental parameters on product recovery”, European Journal of Operational Research,157 (2), 449-464
Guide, Jr. V.D.R.(2000),“Production planning and control for remanufacturing: industry practice and research needs”, Journal of Operations Management, 18, 467–483
Guide, Jr.V.D.R.,Jayaraman, V. and Srivastava, R.(1999),“The effect of lead time variation on the performance of disassembly release mechanisms”, Computers & Industrial Engineering, 36, 759-779
Guide, Jr. V.D.R., Jayaraman, V., Srivastava, R. and Benton, W.C.(2000), “Supply-chain management for recoverable manufacturing systems”, Interfaces, 30 (3), 125-142
Guide, Jr.V.D.R., Srivastava, R. and Kraus, M.E.(2000),“Priority scheduling policies for repair shops”, International Journal of Production Research, 38 (4), 929-950
Inderfurth, K.(1997),“Simple optimal replenishment and disposal policies for a product recovery system with leadtimes”, Operation Research Spektrum , 19 (2), 111-122 Inderfurth, K. and van der Laan, E.A.(2001),“Lead-time effects and policy improvement for stochastic inventory control with remanufacturing”, International Journal of Production Economics, 71, 381-390
Inderfurth, K., deKok, A.G. and Flapper S.D.P(2001),“Product recovery in stochastic remanufacturing systems with multiple reuse options”, European Journal of Operational Research, 133 , 130-152
Kiesmüller, G.P.(2003),“A new approach for controlling a hybrid stochastic manufacturing /remanufacturing system with inventories and different leadtimes”, European Journal of Operational Research, 147, 62–71
Kiesmüller, G.P.(2003),“Optimal control of a one product recovery system with leadtimes”, International Journal of Production Economics, 81-82, 333-340
Kiesmüller, G.P. and van der Laan, E.A.(2001),“An inventory model with dependent product demands and returns”, International Journal of Production Economics, 72,. 73-87
Kiesmüller, G.P. and Scherer, C.W.(2003),“Computational issues in a stochastic finite horizon one product recovery inventory model”, European Journal of Operational Research, 146 (3), 553-579
Kleber, R., Minner, S. and Kiesmüller, G.P.(2002),“A continuous time inventory model for a product recovery system with multiple options”, International Journal of Production Economics,79 (2), 121-141
Liu, J.J. and Yang, P.(1996),“Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs”, European Journal of Operational Research, 91 , 517-527
Minner, S.(2001),“Strategic safety stocks in reverse logistics supply chains”, International Journal of Production Economics,71, 417-428
Nakashima, K., Arimitsu, H., Noset and Kuriyama, S.(2002),“Analysis of a product recovery system”, International Journal of Production Research, 40(15), 3849-3856
Minner, S.and Kleber, R.,(2001), “Optimal control of production and remanufacturing in a simple recoverymodel with linear cost function” Operation Research Spektrum 23(3),24.
van der Laan, E. and Salmon, M.(1997),“Production planning and inventory control with remanufacturing and disposal”, European Journal of Operational Research ,102, 264-278
van der Laan, E., Salmon, M. and Dekker, R.(1999),“An investigation of lead-time effects in manufacturing / remanufacturing systems under simple PUSH and PULL control strategies”, European Journal of Operational Research, 115, 195-214
Vlachos, D. and Dekker, R.(2003),“Return handling options and order quantities for single period products”, European Journal of Operational Research, 151 (1), 38-52
Zarger, A.M.(1995),“Effect of Rework Strategies on cycle time”, Computers & Industrial Engineering, 29(1-4), 239-243
|