一、英文部份
1.Alexander,M. J.,1974,Information system analysis. Science Research Associates, Inc.,Kingsport, Tenn。
2.Drewin, F. J.,1985,Construction Productivity,Elsevier Publishing Co.,New York,N. Y.。
3.”Effect of repetition on building operations and processes on site.”,1965,ST/ECE/HOU/14,United Nations Committee on Housing,Building,and Plng.,New York,N. Y.。
4.Thomas H. R.,1987,”Factor Model of Construction Productivity”,Journal of Construction Engineering and Management,Vol.113(4),pp623~639。
5. Thomas H. R. & William F. Maloney & R. Malcolm W. Horner & Gary R. Smith & Vir K. Handa & Sander S. R.,1990,”Modeling Construction Labor Productivity”,Journal of Construction Engineering and Management,Vol.116(4)。
6.Thomas H. R. & Sander S. R.& Suha Bilal,1992,”Comparison of Labor Productivity”,Journal of Construction Engineering and Management,Vol.118(4)。
7.Thomas H. R. & Ahmet S. Sakarcan,1994,”Forecasting Labor Productivity Using Factor Model”,Journal of Construction Engineering and Management,Vol.120(1)。
8.Thomas H. R. & Napolitan C. L.,1995,”Quantitative Effects of Construction Changes on Labor Productivity”,Journal of Construction Engineering and Management,Vol.121(3),pp290~296。
9.Thomas H. R. & Riley D. R.& Sanvido V. E.,1999a,”Loss of Labor Productivity due to Delivery Methods and Weather”,Journal of Construction Engineering and Management,Vol.125(1),pp39~46。
10.Thomas H. R. & Ivica Zavrski,1999b,”Construction Baseline Productivity:Theory and Practice”,Journal of Construction Engineering and Management,Vol.125(5),pp295~303。
11.Sanvido V. E.,1988,”Conceptual Construction Process Model”,Journal of Construction Engineering and Management,Vol.114(2),pp294~310。
12.Sanvido V. E,1990,”Towards a process based information architecture for construction”,Civil Engineering System,Vol.7(3),pp157~169。
13.Sanvido V. E & Paulson B. C.,1991,”Site Analysis using Controller-Function Charts”,Journal of Construction Engineering and Management,Vol.117(2),pp226~241。
14.Sanvido V. E.& Paulson B. C.,1992b,”Site-Level Construction Information System”,Journal of construction Engineering and Management,Vol.118(4),pp701~715。
15.Maloney W. F.,1990,”Framework for Analysis of Performance”,Journal of Construction Engineering and Management,Vol.116(3),pp399~415。
二、中文部份
1.王士峰,1999年,管理學,文京圖書有限公司,
2.內政部營建署,網址http://www.cpami.gov.tw
3.江友仁,2000,”水利處承包商施工評鑑制度之研究”,中華大學土木工程學系,碩士論文。4.余文德,網址http://wenderyu.ce.chu.edu.tw
5.吳宗桂,2001,”營造廠專業協力廠商評鑑模式之建立與應用”,國立台灣科技大學營建工程系,碩士論文。6.吳明憲等,2000,營建管理與工程材料,考用出版社,1月,二版一刷。
7.徐坤榮,2000年,”建築工程營建生產力之研究-以預鑄工法為例”,國立臺灣大學土木工程學研究所,碩士論文。8.涂瑞德,1998,技術知識特質、產品開發團隊與組織動態能耐關係之研究,政治大學科技管理研究所碩士論文9.黃忠發,1995,”營造公司對其下包垂直整合之研究”,國立中央大學土木工程研究所,碩士論文。10.黃弘銘,1999,”鋼構造基準生產力之研究”,國立高雄第一科技大學營建工程系,碩士論文。11.孫本初、呂育誠,1996,分析單元論的意義及其對公共管理的影響,政大學報第七十三期
12.張金輝,2002,”承包商執行專案工程績效評估之研究”,國立台灣科技大學營建工程系,碩士論文。13.廖錫和,2002,”建立水利署廠商施工評鑑制度之研究”,國立中興大學土木工程學系,碩士論文。