[1]Payne, J.H., 1995, “Management of Multiple Simultaneous Projects :A state-of-the-art review”, International Journal of Project Management, Vol.13, pp.163-168.
[2]施國銓,2004,”應用限制規劃於營建專案有限資源排程與重排程最佳化之研究”,國立雲林科技大學,營建工程系碩士論文。[3]Kelley, J. E., 1963, “The critical path method: resource planning and scheduling”, Ch.21 in Industrial Scheduling, Prentice-Hall, Englewood Cliffs, New Jersey.
[4]Herroelen, W., B. De Reyck and E. Demeulemeester, 1998, “Resource-constrained project scheduling: a survey of recent developments,” Computers and Operations Research, Vol. 25, pp. 279-302.
[5]Elmaghraby, S. E., 1977, ”Activity network : project planning and control by network models,” Wiley , New York.
[6]Icmeli, O., Erenguc, S. S., and Zappc, C. J., 1993, “ Project scheduling problems : asurvey”, International Journal of Operation and Problems Management, Vol.13, pp.80-91.
[7]Ozdamar , L. and Ulusoy, G., 1995, ”A survey on the resource-constrained project scheduling problem”, IIE Transactions, Vol.27, pp.574-586.
[8]蔡登茂,1997,”有限資源專案排程問題之文獻回顧研究”,正修學報,第九期。[9]Davis, E. W. and J. H. Patterson, 1975, “A comparison of heuristic and optimum solutions in resource-constrained project scheduling”, Management Science, Vol. 21, No. 8, pp. 944-955 .
[10]Patterson, J. H., 1973, “Alternative methods of project scheduling with limited resources”, Naval Research Logistics Quarterly, Vol. 20, No. 4 pp. 767-784.
[11]Patterson, J. H., 1976, “Project scheduling: the effects of problem structure on heuristic performance”, Naval Research Logistics Quarterly, Vol. 23, No.1 pp. 95-122 .
[12]Russell, A.H., 1970, “Cash flows in networks”, Management Science, Vol. 16, No. 5, pp. 357-373 .
[13]Russell, R. A., 1986, ”A comparison of heuristics for scheduling projects with cash flows and resource restrictions”, Management Science, Vol. 32, No. 10 ,pp. 1291-1300.
[14]Padman, R., D. E. Smith-Daniels and V. L. Smith-Daniels, 1997, “Heuristics scheduling of resource-constrained projects with cash flows”, Naval Research Logistics Quarterly, Vol. 44, No. 4, pp. 365-371.
[15]Patterson, J. H., F. B. Talbot, R. Slowinski and J. Weglarz, 1990, “Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems”, European Journal of Operational Research, Vol. 49, No. 1, pp. 68-79.
[16]Pinder, J. P. and A. S. Marucheck, 1996, “Using discounted cash flow heuristics to improve project net present value”, Journal of Operations Management, Vol. 14, No. 3, pp. 229-240.
[17]Baroum, S. M. and J. H. Patterson, 1996, “The development of cash flow weight procedures for maximizing the net present value of a project”, Journal of Operations Management, Vol. 14, pp. 209-227 .
[18]Chiu, H. N. and D. M. Tsai, 2002, “An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows”, Construction Management and Economics, Vol. 20, No. 1, pp. 55-66.
[19]Victor D. Wiley, Richard F. Deckro, Jack A. Jackson Jr., 1998, “Optimization analysis for design and planning of multi-project programs”, European Journal of Operational Research, Vol.109, pp.492-506.
[20]Dantzig, G. B. and P. Wolfe, 1960, “The Decomposition Algorithm for Linear Programming”, Operations Research, vol 8, pp. 101-111.
[21]蔡登茂,2001,”專案資源需求規劃與排程問題之研究”,國立臺灣科技大學,工業管理系博士論文。[22]詹蕙珍,2004,”模糊多目標非線性規劃在有限資源多專案排程問題之應用”,國立屏東科技大學,工業管理系碩士論文。[23]賴明妮,2004,”資金與可重新使用資源限制下多專案排程問題之研究”,國立屏東科技大學,工業管理系碩士論文。[24]謝玉霜,2001,”限制式規劃應用於港區貨櫃場軌道式門型起重機移動路徑之研究”, 國立成功大學,交通管理學系碩士論文。[25]Amal de silva, 2000, “Bus Driver Duty Optimization by Combining Constraint Programming and Linear Programming”, ILOG(S) Pte Ltd. Singapore.
[26]羅紫萍,2004,”應用限制規劃技術於營建業鋼筋供應商整合成本最佳化模式”, 國立雲林科技大學,營建工程系碩士論文。[27]林詩芹,2004,”以限制規劃構建全年無休服務人員排班模式-以客服人員排班為例”,國立交通大學,運輸科技與管理學系碩士論文。[28]Brailsford, S. C., C. N. Potts, B. M. Smith, 1999, “Constraint Satisfaction Problems:Algorithms and Applications”, European Journal of Operational Research, Vol.119, pp.557-581.
[29]Davis, E. W., 1973, “Project scheduling under resource constraints: historical review and categorization of procedures”, AIIE Transactions, Vol. 5, No.4, pp. 279-313.
[30]Haralick, R. and G. Elliott, 1980, “Increasing Tree Search Efficiency for Constraint Satisfaction Problems”, Artifcial Intelligence, vol 14, pp. 263-313.
[31]王國琛,2003,”結合限制規劃與限制規劃求解大型後艙空勤組員排班問題”, 國立交通大學,運輸科技與管理學系碩士論文。[32]楊崇揮,1997,”多評準施工排程最適化計算模式之探討”,國立台灣科技大學,營建工程研究所碩士論文。[33]洪宗亨,2000,”不確定性營建專案排程尋優模式之探討”,國立台灣科技大學,營建工程系碩士論文。[34]呂守陞、楊崇揮,1999,”遺傳演算法在資源限制下工期成本交易最適化排程模式運用之研究”,中國土木水利工程學刊,第十一卷,第三期,頁559-566。[35]Leu, S. S., Yang, C. H., 1999, ”GA-Based Multicriteria Optimal Model for Construction Scheduling,” Journal of Construction Engineering and Management, Vol. 125, No. 6, pp. 420-427, November/December.
[36]Kurtulus, I.S., Narula, S.C., 1985, Multi-project scheduling: Analysis of project performance. IIE Transactions 17 (1), 58-66.