1.Herroelen, W., Reyck, B. D., and Demeulemeester, E., 1998, “Resource-constrained project scheduling: a survey of recent developments,” Computers & Ops. Res. 25(4), 279-302.
2.Heizer, J. and Render, B., 2004, “Operations Management(Seventh edition),” New Jersey: Prentice Hall.
3.Kotler, P., 1986, “Principles of Marketing Third Edition,” Prentice Hall, Englewood Cliffs.
4.Kolisch, R., 1995, “Project scheduling under resource constraints,” Physica-Verlag Heidelberg.
5.Kolisch, R., Sprecher, A., and Drexl, A., 1995, “Charcterization and Generation of A General Class of Resource-Constrained Project Scheduling Problems,” Management Science, Volume 41, Issue 10.
6.Pinedo, M., 1995, “Scheduling theory, algorithms and systems,” Prentice Hall.
7.Peter Brucker, Andreas Drexl, Rolf Mohring, Klaus Neumann, and Erwin Pesch, 1999, “Resource-constrained project scheduling: Notation, classification, models, and methods,” European Journal of Operational Research, Volume 112, pp.3-41.
8.Philippe, B., and Sophie, D., 2004, “Tigh LP Bounds for Resource Constrained Project Scheduling,” OR Spectrum, Volume 20, pp.251-262.
9.Sprecher, A., 1994, “Resource-constrained project scheduling: exact methods for the multi-mode case,” Economics and Mathematical Systems, No.409, Springer, Berlin.
10.Wiest, Jerome D., and Levy, Ferdinand K., 1977, “A Management Guide to PERT/CPM(Second edition),” Prentice-Hall, Englewood Cliffs.
11.Willy, H., Bert, D. R., and Erik, D., 1998, “Resource-Constrained Project Scheduling: A Survey of Recent Developments,” Elsevier Science Ltd., Volume 25, No. 4, pp.279-302.
12.Yang, B., Geunes, J., and O’Brien, W., 2001, “Resource constrained project scheduling; past work and new directions,” Research Report 2001-6, Department of Industrial and Systems Engineering, University of Florida.
13.郭詩豪, 2004, 「於時間區間配置下有限資源專案排程問題最佳化之研究—以混合整數線性規劃求解」, 國立成奶j學, 工業與資訊管理研究所, 碩士論文.14.朱碩智, 2005, “The Resource-Constrained Project Scheduling Problems (RCPSP) with Resource Allocation and Scheduling,”, 中正大學, 企業管理研究所, 碩士論文.